PROVISION OF CONDITIONAL ASSESSMENT & REMAINING LIFE


ANALYSIS FOR MODULE 2 BOILERS IN PETRONAS LNG COMPLEX

Presented to
Bidder’s Site Visit on 17th May 2010
By
Zamsyari Bin Madhan
MLNG
INTERNAL USE
© 2009 PETROLIAM NASIONAL BERHAD (PETRONAS)

All rights reserved. No part of this document may be reproduced, stored in a


retrieval system or transmitted in any form or by any means (electronic,
mechanical, photocopying, recording or otherwise) without the permission
of the copyright owner.

MAKING IT HAPPEN
Contents

1. Objectives

2. General MLNG Boiler Arrangement

3. Scope of Inspections

Appendix I: Photos
Appendix II: Work Specification

2 MAKING IT HAPPEN2
General MLNG Boiler Arrangement

3 MAKING IT HAPPEN3
General MLNG Boiler Arrangement

4 MAKING IT HAPPEN4
Objectives

To brief the bidder with on MLNG/PLM/2010/0013 Conditional


Assessment & Remaining Life Analysis For Module 2 Boilers
In PETRONAS LNG Complex.

5 MAKING IT HAPPEN5
Scope Of Inspections

Test Conducted
Remote Field Electromagnetic
1 Visual Inspection (VI) 8
Test (RFET)
2 Dye Penetrant Test (DPT) 9 Remote Visual Inspection (RVI)
3 Magnetic Particle Test (MPT) 10 In Situ Metallography (IM)
4 Ultrasonic Flaw Detection (UFD) 11 Hardness Testing (HT)
Ultrasonic Thickness Measurement
5 12 Dimensional Measurement (DM)
(UTM)
Non Destructive Oxide Thickness
6 13 Metallographic Replication (MR)
Inspection (NOTI)
Non Destructive Hydrogen Damage
7 14 Deposit Collection (DC)
Inspection (NDHDI)

6 MAKING IT HAPPEN6
Scope Of Inspections
DC Drums, Stack
&DM
DPT Drums, Headers & All weld joints

MPT Drums, Headers & all weld joints

UFD Headers , Drums

UTM Headers , Drums & Stack, MSL, PSH &


SSH, DSH
NOTI PSH & SSH tubes

NDHDI Furnace wall tubes

RFET Boiler bank tubes, Furnace wall tubes

RVI Headers & Drums

IM Furnace wall tubes, PSH&SSH tubes

HT Headers, Drums & MSL

DM Headers, Drums & MSL, All tubes

MR Furnace wall tubes, PSH & SSH tubes

VI All pressured parts, insulation ,


Structure & Drums Supports

7 MAKING IT HAPPEN7
Photos
Visual Inspection (VI)

Mud Drum Steam Drum

8 MAKING IT HAPPEN8
Photos
Dye Penetrant Test (DPT)

Buckstay Steam Drum

9 MAKING IT HAPPEN9
Photos
Magnetic Particle Test (MPT)

SSH Header Steam Drum

10 MAKING IT HAPPEN
10
Photos
Ultrasonic Flaw Detection (UFD)

Steam Drum Steam Drum

11 MAKING IT HAPPEN
11
Photos
Non Destructive Oxide Thickness Inspection Service (NOTI)

Primary & Secondary Superheater

12 MAKING IT HAPPEN
12
Photos
Non Destructive Hydrogen Damage Inspection (NDHDI)

13 MAKING IT HAPPEN
13
Photos
Remote Field Electromagnetic Test (RFET)

Steam Drum Steam Drum

14 MAKING IT HAPPEN
14
Photos
Remote Visual Inspection (RVI)

Primary Superheater Header

15 MAKING IT HAPPEN
15
Photos
In Situ Metallography (IM)

Primary Superheater Outlet

16 MAKING IT HAPPEN
16
Photos
Metallographic Replication (MR)

17 MAKING IT HAPPEN
17
Thank You

18 MAKING IT HAPPEN