a) 0-30 days b) 30-60 days c) 60-180 days d) Continuous
Business Continuity Planning & Disaster 1
Recovery Sample Question 2 For which areas of the enterprise are business continuity plans required? a) All areas of the enterprise b) The financial and information processing areas of the enterprise c) The operating areas of the enterprise d) The marketing, finance and information processing areas Business Continuity Planning & Disaster 2 Recovery Sample Question 3 Which of the following criteria should be met by off-site storage for media backup? a) The storage site should be located at least 15 miles from the main site b) The storage site should be easily accessible during working hours c) The storage site should always be protected by an armed guard d) The storage site should guard against unauthorized access
Business Continuity Planning & Disaster 3
Recovery Sample Question 4 What conditions should be taken to restore a system's computational capability and data files after a system failure? a) Implement recovery procedures b) Synchronize system programs c) Execute risk management d) Restore storage media backup Business Continuity Planning & Disaster 4 Recovery Sample Question 5 What is the best way to assure the reliability of backup tapes which are being maintained at a warm disaster recovery site? a) Have the off-site provider/vendor verify the tapes are properly labeled b) Have the off-site provider/vendor verify that the tapes are readable c) Retrieve off-site tapes and verify that they can be read d) Inventory the off-site backup tapes monthly
Business Continuity Planning & Disaster 5
Recovery Sample Question 6 Which term describes the principle that no single point of failure will disrupt a system? a) Redundancy b) Fault tolerance c) Backups d) Recoverability
Business Continuity Planning & Disaster 6
Recovery Sample Question 7 What is the term for an alternate processing site that is only partially equipped? a) Shell Site b) Mobile Hot Site c) Warm Site d) Cooperative Hot Site
Business Continuity Planning & Disaster 7
Recovery Sample Question 8 Which term describes an exercise in which all recovery procedures and strategies are tested? a) Simulation b) Parallel Test c) Checklist Test d) Full Recovery Test
Business Continuity Planning & Disaster 8
Recovery Sample Question 9 What is the most overlooked component of backup strategy? a) Documentation b) Testing c) Redundancy d) Contracts
Business Continuity Planning & Disaster 9
Recovery Sample Question 10 Due to the complexity of large databases and the need for 24-hour access, it is best to __________. a) maintain a replicated on-line copy b) never back up the database c) shut down the database monthly for backups d) only backup the database when a large number of changes have occurred Business Continuity Planning & Disaster 10 Recovery Sample Question 11 Computers are sensitive to the quality of power supplied. Low voltage, power spikes, and electromagnetic interference can disrupt computer operations. This can be remedied by using __________. a) a power strip with surge protection b) an UPS with power filtering c) an agreement with the facility owner d) A and C
Business Continuity Planning & Disaster 11
Recovery Sample Question 12 Contingency planners should never consider simple loss of data or erroneous erasure of data as disasters that materially affect the entire organization. a) True b) False
Business Continuity Planning & Disaster 12
Recovery Sample Question 13 Which is not a step in the business recovery process? a) Disaster b) Response c) Restoration d) Return
Business Continuity Planning & Disaster 13
Recovery Sample Question 14 Which of the following service does disaster recovery planning forward? a) Availability b) Accuracy c) Acceptability d) Authenticity
Business Continuity Planning & Disaster 14
Recovery Sample Question 15 What is a hot-site facility? a) A site with pre-installed computers, raised flooring, air- conditioning, telecommunications and networking equipment and UPS b) A site in which space is reserved with pre-installed wiring and raised floors c) A site with raised flooring, air-conditioning, telecommunications and networking equipment and UPS d) A site with ready-made work space with telecommunications equipment, LANs, PCs and terminals for work groups
Business Continuity Planning & Disaster 15
Recovery Sample Question 16 When dealing with removable media for backup and restoration purposes, it is best to maintain multi-copies of the media in __________. a) the same location as the original, swapping it out with newer copies periodically b) a different location, swapping it out with newer copies periodically c) the same location as the original, without swapping it out with newer copies periodically d) a different location, without swapping it out with newer copies periodically Business Continuity Planning & Disaster 16 Recovery Sample Question 17 What is the risk of inadequate humidity controls? a) Overheating processors b) Demagnetization of media c) Loss of power d) Static electricity discharge
Business Continuity Planning & Disaster 17
Recovery Sample Question 18 Which of the following is not a major cost factor in recovery? a) Information re-creation b) Equipment replacement c) Business lost due to downtime d) Personnel
Business Continuity Planning & Disaster 18
Recovery Sample Question 19 Which of the following is a risk of individual UPS units attached to devices? a) Inability to recover after power failure b) Inability to de-power all units in emergency c) Inability to restore data d) Inability to detect server power failures