The document summarizes the energization of Substation 1, including powering up various switchboards. It provides a schedule for installation activities from May 2016 to August 2016. It also lists pre-requisites and support needed, such as expediting delivery of materials, assessing manpower needs, and checking availability of temporary generators.
The document summarizes the energization of Substation 1, including powering up various switchboards. It provides a schedule for installation activities from May 2016 to August 2016. It also lists pre-requisites and support needed, such as expediting delivery of materials, assessing manpower needs, and checking availability of temporary generators.
The document summarizes the energization of Substation 1, including powering up various switchboards. It provides a schedule for installation activities from May 2016 to August 2016. It also lists pre-requisites and support needed, such as expediting delivery of materials, assessing manpower needs, and checking availability of temporary generators.
Phase 2 Field Equipment Energization (Utility & Off sites) SUBSTATION -SS 1
Expedite delivery of Electrical Cable Gland Materials (Delivery by 30-Jul-
2016) - Ashok Temporary Generators with Diesel Tank (To be mobilized from ISG by 15-Jul-2016) Romen/Ramesh Gland Plate Drilling - LEAD Pre- Certified MV Cable Jointers LEAD by 01-Aug-2016 Requisites & Supports Foundation for ACU of HVAC - LEAD Expedite delivery of Refrigerant for HVAC (Delivery by 15-Aug-2016 with ARH Approval) - Ashok ARH Pre-requisite documents Paresh / Ashok / Abraham Precast of earth pit encasement, Earthing Pit Installation & Grounding works LEAD (Including Marconite procurement) SUBSTATION -SS 1
Eyewash Facility - Ashok
FM200 Dump Test (ARH Witness) - Paresh MV Cables & Transformers Tests (ARH Witness) Paresh / Abraham MV SWGR Test (ARH Witness) Paresh Pre-requisites /Identification & Actions required for ARH Approval Pre- Paresh/Ashok/Abraham Requisites & Supports Vendor mobilization prior to Power Up Ashok /Abraham Renco/HVAC Renco/FM 200 Schneider/SWGR ETACOM/Bus duct Cummins/EDG (For option 1) Fence for Transformer Construction A ITR closure Construction/QC SUBSTATION -SS 1
Mounting Support bolt holes to be physically checked wrt to casted
foundation : Issam Jbara/ Ricardo No: of inter-module termination including laying & dressing (Time to be assessed) Ashok/Kale Assess the manpower requirement for concluding the time period for Pre- activities Ramesh/Suresh Requisites & Supports John Hajjar & Nadar Joseph to be mobilized by 30-Jun-2016 Ashok Bus duct support details (design, procurement, fabrication) Kale/Ashok Technical Workshop at SHJ with Electrical & Commissioning Kale/Ashok & Romen Shah Check resources & equipment required for installation of panels & erection of other items Ramesh SUBSTATION -SS 1
Scope and availability of temporary Gensets (500 KVA x 2) for phase 2 to