Sei sulla pagina 1di 8

A R C H I T E C T U R A L D E S I G N

CASE STUDY OF CITY CENTER AHMEDABAD


LOCATION HISTORY AND ORIGIN
LOCATION
CROWNE PLAZA CITY CENTER 1)THE HISTORY OF AHMEDABAD
STRETCHES AS FAR BACK AS IN THE
CROWNE
KAULPUR PLAZA
ROAD ,GHANDHINAGAR
11THCENTURY.
AHMEDABAD.
CITY CENTER
LATITUDE- 22*58N 2) LINKING ITSELF WITH OLD TOWNS OF
ASHAVAL AND KARNAVATI ABOUT 1000
LONGITUDE 72*35EN
YRS AGO.
ALTITUDE 49 MTRS ABOVE MSL
AVERAGE ANNUAL RAIN FALL 3) IN YEAR 1411 AD SULTAN AHMED
SHAH BUILT SITADEL .
750MM
4) IN 1456 AD INCLOSING WALL WAS
SUMMER 24 TO 39 ,WIN 10 TO 24.
CONSTRUCTED .
INTRODUCTION 5) ORGANISED BY 12 MAIN ROADS EACH
LOCATION MAP OF AHMEDABAD TERMINATING AT A GATE IN THE WALL .
1) YEAR OF ESTABLISHMENT 1411AD.
2) COMMENCEMENT OF MUNICIPAL
3) WORKS BY TOWN WALL FUND COMMITTEE GEOGRAPHY
1834. 1) LAND 53,000 SQ YARD.
ESTABLISHMENT OF MUNICIPALITY 1858. 2) CITY SITUATED ON THE
AREA OF THE CITY 464 .16 SQMTR .ESTABLISHMENT WESTERN SIDE OF INDIA
OF MUNICIPAL CORPORATION YEAR 1950. (SANDY AND DRY AREA)
3) THERE ARE TWO MAIN
SURROUNDED BY 3 WIND ROSE DIAGRAM OF LAKES LOCATED IN THE
NATIONAL HIGHWAYS AHMEDABAD CITY CENTER CITY . KANKARIA LAKE
1) KALUPUR ROAD. ,THE VASTAPUR LAKE
2) RAKHIAL ROAD 4) KANKARIA LAKE LOCATES
3) NARODA ROAD IN MANINAGAR IS AN
4) APOLLO HOSPITAL CITY CENTER . ARTIFICIAL LAKE .
5) ACE TRAVEL AND TOUR 5) IT EXPERIENCE EXTREME
6) TITANIUM CITY CENTER. TYPE OF CLIMATE.
7) SARDAR VALLABHAI PATEL
8) INTERNATIONAL AIRPORT.
STEROGRAPHIC DIAGRAM ON ECOTECH
B.ARCH/9h Sem,2016
A R C H I T E C T U R A L D E S I G N 12BAR 1018
A R C H I T E C T U R A L D E S I G N
CASE STUDY OF CITY CENTER AHMEDABAD
PLANNING AND DESIGN OF AHMEDABAD CITY

A R C H I T E C T U R A L D E S I G N B.ARCH /10TH 2017


A R C H I T E C T U R A L D E S I G N
CASE STUDY OF CITY CENTER AHMEDABAD

PLANS ,SECTIONS , VIEWS AND SKETCHES OF THE INTERNAL AS WELL AS EXTERNAL


PLANNING OF IIM AHMEDABAD

CAMPUS LAYOUT
1) SEPARATE ENTRIES FOR INSTITUTIONAL BUILDING AND
RESIDENTIAL COMPLEX .
2) SEPARATE SERVICE ENTRY .
3) ACADEMICS AND SOCIAL ACTIVITIES
INTEGRATED WITH STAFF AND STUDENTS
4) INSTITUTIONAL COMPLEX IS TAKEN AS FOCAL
BUILDING.
5) AUDITORIUM IS LOCATED NEAR MAIN ENTRANCE
FOR EASY ACESS FOR VISITORS .
6) BRICK HAS BEEN USED AS PRIMARY BUILDING
MATERIAL FOR THE ENTIRE COMPLEX
WALLS, COLUMNS.
7) BRICK ARCHES HAVE BEEN USED FOR
WIDE SPANS .
8) THE DESIGN HAS BEEN CONCEIVES TO ENTIRE MOVEMENT
FROM THE
ACTIVE SPACES TO MOST PRIVATE AND QUITE CARRELS OF THE
FARTHEST REACHES.
USE OF CONCRETE HAS BEEN RESTRICTED TO FOUNDATIONS ,
FLOOR SLABS AND TIES FOR ARCHED OPENINGS.

A R C H I T E C T U R A L D E S I G N B.ARCH /TH 2016


A R C H I T E C T U R A L D E S I G N
CASE STUDY OF CITY CENTER AHMEDABAD

REAL ESTATE ASPECTS INVOLVED , FOOTFALL OF VISITORS


PARKING HAVING MAXIMUM DIMENSION 5.5 MTSQ 3.00
MTRS . THE MAXIMUM HEIGHT OF CONSTRUCTION SHALL
BE 3MTRS WITH MAXIMUM PLINTH OF 30MM.
NO FLOOR SHALL BE PERMITTED OVER SUCH A
CONSTRUCTION.
THE MAXIMUM PERMISSIBLE AREA OF CONSTRUCTION
SHALL BE 16.50 SQMTR.
RAIN WATER
NO ROOF OR TERRACE ABUTTING ON APUBLIC STREET
SHALL BE CONSTRUCTED WITHOUT PROVIDING NUMBER
OF DOWN TAKE PIPES AND SUCH PIPE SHALL BE SO FIXED
AS TO DISCHARGED THE RAINWATER AT A LEVEL NOT
HIGHER THAN 0.6MTR ABOVE THE STREET LEVEL .
REAL ESTATE ASPECTS INVOLVED , FOOTFALL OF VISITORSSERVICES IN
PUBLIC AREAS LIKE RAIN WATER HARVESTING,SEWERAGE DISPOSAL SEWERAGE DISPOSAL
,ELECTRICAL SERVICES THE COMMUNITY SHALL BE CALCULATED AT THE RATE OF
10LTRS CAPACITY.
1) SEPTIC TANK SHALL HAVE A MINIMUM INNER WIDTH OF 75 CM THE OWNERS OCCUPANTS SHALL BE REQUIRED TO
AND DEPTH BELOW THE WATER LEVEL AND AS PER CAPITAL PROVIDE THE COMMUNITY BIN WITH AIR TIGHT COVER ON
MINIMUM LIQUID CAPACITY OF 85 MTRS .
THE TOP AT THE STANDARD S PRECRIVED.
2) THE MINIMUM NORMAL DIA OF PIPE SHALL BE 100MM
FURTHER AT JUNCTIONS OF PIPES IN MAN HOLES , THE EVERY BUILDING HAVING A HEIGHT OF MORE THAN 33
DIRECTION OF FLOW FROM A BRANCH CONNECTION SHOULD MTRS SHALL BE PROVIDED WITH DIESEL GENERATOR
NOT MAKE AN ANGLE EXCEEDING 45 WITH THE DIRECTION OF WHICH CAN BE UTILISED IN CASE OF FAILURE OF
FLOW IN THE MAIN PIPE . ELECTRICITY.

A R C H I T E C T U R A L D E S I G N B.ARCH /9TH 2016


A R C H I T E C T U R A L D E S I G N
CASE STUDY OF CITY CENTER AHMEDABAD

A R C H I T E C T U R A L D E S I G N B.ARCH /9TH 2016


A R C H I T E C T U R A L D E S I G N
CASE STUDY OF CITY CENTER AHMEDABAD

IMPACT OF SOCIAL ECONOMIC FACTOR


RENTEL VALUE 9500 SQFT CONSIDER .
HIGH AND MIGHTY OF AHMEDABAD STAY HERE 3 BHK AND 4 BHK VARIES FROM
1 /4 CRORE .
HIGLY PERFORED FOR RENTED ACCOMODATION .
FOR THE ADMINISTRATIVE PURPOSE THE CITY CENTER IS
DIVIDED INTO 43 WARDS AND FIVE ZONES .
THE UA AREA IS 1294.65 SQ KM
.

A R C H I T E C T U R A L D E S I G N B.ARCH /9TH 2016


A R C H I T E C T U R A L D E S I G N
CASE STUDY OF CITY CENTER AHMEDABAD

PHYSICAL CHARACTER OF THE BUILT FORM

INFLUENCE ON THE SURROUNDINGS AND IMPORTANCE

1) THE AMBIENCE OF THE CITY CENTER IS GOOD .


2) ITSS CORSE DISTINCT SENCE OF CHARACTER .
3) THE PLANNING IS SIMPLE DOMINENT.
4) DOES NOT HAVE VERY LARGE PARKING SPACE .
5) THERE IS NO MUCH LANDSCAPE .
6) NO PROPER FACILITIES FOR HANDICAPPED PERSON.
7) CITY CENTER SCORES THE MOST IN ITS DISTINCT
SCENCE OF CHARACTER.

A R C H I T E C T U R A L D E S I G N B.ARCH /9TH 2016


A R C H I T E C T U R A L D E S I G N
CASE STUDY OF CITY CENTER AHMEDABAD

RESION FOR CHOOSING THE PARTICULAR CASE STUDY

AHMEDABAD S TRADITIONAL SOCIAL ECONOMIC SETU WAS


THE MOST IMPORTANT ASSET IN ITS GROWTH.
CITY GOVERNMENT HAVE PROVEN THERE EFFICIENCY IN DELIVERING
SERVICES.
BUSINESS SKILLS AND ENTHUSIASM OF MIGRANT GUJRATIS ACCOUNT FOR CREDIBLE
IMAGE OF CITY FOR INVESTORS.
NEW DEVELOPMENTS AND EXPENSION ALONG WITH THE OLD PLANNING
IS THE CHALLENGE.

INFERENCES
THE AMC HAD STILL FAILED TO FULLY INCLUDE MANY OF THE NEW INSIGHTS IN
THEIR OVERAL URBAN PLANNING. IT IS PARTICULAR THEIR UNWILLINGNESS TO
GRANT SECURITY OF TENURE FOR PERIODS OF LONGER THAN 10 YRS THAT SENDS
OUT STRONG NEGATIVE SIGNALS.

A R C H I T E C T U R A L D E S I G N B.ARCH /9TH 2016

Potrebbero piacerti anche