Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
TH
Way to victory
Major changes in rulebook
Challenges in the event
Stages involved
What is PFR
PFR Presentation
What is GKDC
30min
What is Gantt Chart
What is the importance of this report
How should one proceed to make a proper Gantt Chart
Factors to be considered while making Gantt Chart
Importance of timeline in Gantt Chart
Sample format
Gantt Chart
25min
What is DVP
Importance of DVP
Tests to be included in DVP
Understanding the procedure
Duty allocation
Testing Reports
Deadlines in DVP
Understanding the Format
DVP
25min
What is FMEA
Importance of FMEA
Failures to be included in FMEA
Understanding the procedure
What is Failure Mode
What is Potential Cause of Failure mode
What is Detection
What is Severity
What is RPN
What are Rating Factors
Understanding the Format
FMEA
45min
What is Cost Report
Cost factors involved
Cost of components
Material Cost
Process Cost
Fasteners Cost
Tooling
Labor Cost
Miscellaneous
Need of Pie Chart/Graph
Cost Report
30min
Business Idea
Type of Business
Mission, Vision
Company Hierarchy
Target market/audience and their expectations
Initial Investment
Investors Scope
Investment Proposals
Investment Policies
Production Plans
Infrastructure Required
Labor/Employee Management
Machinery Required
Turnover & Figures Justification
Break Even Analysis
Confidentiality Clause
Business Plan
60min
Acknowledgement
Table of Contents
Abstract
Introduction
Goal of Project
Technical Specifications
Special Features
Chassis
Chassis Analysis
Engine & Transmission
Braking
Steering
Wheel & Tyres
Body Works
References
Design Report
Acknowledgement
10min
Table of Contents
Table of Figures
Table of Signs/Notations
Table of Contents
10min
Small description of Design Report
Abstract
10min
Introduction to the Design Challenge
Introduction to the Organization conducting it
Introduction to the team and its aim
Introduction
10min
Rulebook Satisfaction
Aesthetics Expectations
Ergonomics Expectations
Safety
Light Weight
Performance Expectations
Goal of Project
20min
Overall length 67 inches
Drivetrain CVT
Acceleration 9 m/sec2
Technical Specifications
10min
Special Features
10min
Rulebook Requirements
Design Considerations
Performance Expectations
Material Selection and Reasoning
Material Calculation
Material Certification
Chassis Design Goals
Methodologies
Design VS Manufacturability
Chassis
30min
Calculation of Impact Forces
Fixed Geometry/Constraints
Direction of Forces
Force in terms of gs
Frontal Impact
Side Impact
Rear Impact
Factor of Safety
Chassis Analysis
60min
Rulebook Constraints
Specifications of Engine
Gear Ratio
Final Drive Ratio
Acceleration Calculations
Power Limited Acceleration
Traction Limited Acceleration
Maximum Speed
Braking
60min
Rulebook Requirements
Go Kart Steering System
Design
Ackermans Geometry
Steering
25min
Rulebook Requirements
Aesthetics
Material for Bodyworks
Weight Factor
Body Works
30min
CoG
Static Load Distribution
Design Symmetry
Lateral Load Transfer
Longitudinal Load Transfer
Increasing Torsional Stiffness
Bending Stiffness
Asymmetrical Effects