Scroby Sands
30 x MW WTG
Integral flange on monopile
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Substation platform elements Description
26
27
28
29
30
Total
Thickness Weights
Elements No OD Length weight
(mm) (Tonnes)
(Tonnes)
Bottom tower tube 1 38 5 4.1 18.92 18.92
Middle tower tube 1 58 5 2.1 14.67 14.67
Inclined plate - p1 4 38 0.61 2.42
Inclined plate - p2 4 30 4.74 18.94
Vertical plate 4 25 1.19 4.77
Inclined beam Flange 4 20 0.16 0.62
Inclined beam web 4 10 0.23 0.90
Horizontal beam flange 4 20 0.34 1.36
Horizontal beam web 4 10 0.50 1.99
Deck plate 1 15 22.47 22.47
hand rail 2.30 2.30
Tower bottom Plate 1 5 1.11 1.11
crane 1 6.42 6.42
transition flange 4.47 4.47
TP Leg 4 80 2.88 4.00
Inner stiffener plate 1 80 5.43 5.43
Total Weight without contingency 110.80
Total Weight with 10% contingency 121.88
31
Factored
Unfactored Member Contigency weight
Member Weight [te] category factor (Te)
Jacket Legs 263.1 Primary 15% 302.53
Horizontal Bracing 53.4 Primary 15% 61.39
Through Bracing 38.1 Primary 15% 43.81
Vertical Bracing 303.9 Primary 15% 349.54
Horizontal Bracing
Stubs 21.9 Primary 15% 25.18
J-Tubes 153.9 Secondary* 15% 176.98
Paint 0.95 Secondary* 15% 1.09
Primary 50%,
Cable Deck 85.0 Secondary* 50% 15% 97.75
Anodes 40.0 Secondary*y 15% 46.00
Boat Landing and
Fenders 30.0 Secondary* 15% 34.52
Padeyes 4.4 Primary 15% 5.02
Mudmats 30.0 Secondary* 15% 34.50
Temporary Items 7.0 Secondary* 15% 8.05
Piles 606.0 Primary 15% 696.90
Total Weight (Te) 1637.6 1883.3