Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
Indoor units of the 9500 MPR system can be installed in 3 different ways :
For each of the above type of installation special mechanical supporting fixtures are available.
Warning : The rack must be connected to the ground before any electrical connection is performed.
The grounding cable must be the same section size as the power cables connected to the batteries.
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Rack 21 Installation and Grounding
1 Refer to the plan or site survey document to see rack raw assignment
2 Position & mount the rack in a vertical position
3 Mark the base plate with the holes to be drilled on the floor and drilled the floor
4 - Fasten the rack to the station structure using expansion bolts or fixing to floating floor
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Rack 19 Installation and Grounding
The Laborack must be fixed to the floor by means of the four (4) screws.
1 Refer to the plan or site survey document to see rack raw assignment
2 Assemble the rack
3 Position & mount the rack in a vertical position
4 Mark the base plate with the holes to be drilled on the floor and drilled the floor
5 - Fasten the rack to the station structure using the four screws or fixing to floating floor
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Wall support Installation and Grounding
The IDU wall mounting kits 10U (3CC50027AAAA) (max 4 MPT) and 3U (3CC09614AAAA) can be used for wall
installation and must be fixed to the wall by means of the four (4) screws.
1 Refer to the plan or site survey document to see rack raw assignment
2 Position & mount the Wall mount support in a vertical position
4 Mark the base plate with the holes to be drilled on the wall and drilled the wall
5 - Fasten the rack to the station structure using the four screws or fixing to floating floor
6 The mechanical support must be grounded using the Grounding Kit 3CC13423AAAA
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
Panel with 6 fuses : 3CC50160AAXX Panel with 10 breaker 3CC50155AAXX Panel with 20 breaker 3CC50156AAXX
fuses included: 6x6A; 6x16A; 2x32A. (Breakers not included) (Breakers not included)
If the ETSI 21 rack is in use, the ETSI rack mounting kit (3CC50042AAAA) must be used.
Brackets must be positioned in the correct orientation with the engraved UP writing on the top.
1. Install the nut cage on the rack in order to fix the TRU.
2. Fixe the TRU to the top position on the rack.
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
TRU installation & connection
Note: The TRU is grounded through the fixation screws on the rack. Do not connect the GND point on the TRU.
a. Connect the black cables (+) from the two batteries to the GND bar connection toward the station ground.
b. Connect the blue cables (-) to the power clamps at the left side (battery A) end and them toward the top of the rack.
c. For redundant battery applications, repeat steps 3 to 4 to connect battery B.
a. Remove the plastic protection cap on the position the breaker needs to be inserted
b. Close the lock on the breaker and insert it in the TRU.
c. Open the breaker lock and fix the breaker correctly on the DIN rail.
e. Close the breaker lock and tighten the upper screw.
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
TRU installation & connection
5. Connect the black cables (+) to the GND bar connection and tighten the corresponding screw.
6. Connect the blue cable (-) to the breaker and tighten the corresponding screw.
The other end of the cable will be connected to the equipment when it is installed in the subrack.
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
MSS-8 Installation
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
MSS-1c Installation
1. Install the nut cage on the right place in the rack in order to fix the MSS.
2. Install the braket kit 3DB77008ACXX on the Rack then positioning MSS sub-shelf and fix the MSS with screws
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Power supply 1mmsq zip cables 1AC007800068
1. Separate a 250 mm length of cable into two wires and make a loop of approximately 45 mm on one wire.
2. Install & Close the ferrite on the wire.
13. Connect the blue cable (-) from the equipment to the negative connector input.
14. Connect the black cable (+) from the equipment to the positive connector input.
Blue strip wire = Negative Battery input
16. Terminate the power cord by inserting the wires in the dedicated connector slot.
17. Label the both sides of the cable.
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
3. One cord 1AC007800068 2x1 mm2 shall be used for the supply connections of the Fan Unit.
4. Identify the breakers in the TRU slots that correspond to the positions that you need to install.
7. Route the cables from the breaker in the TRU to the cable duct depending on the Fan Unit location.
8. Connect the blue (-) / black (+) cable from the equipment to the connector then to the power supply A & B
breaker terminal and tighten the corresponding screw.
9. Label the cable on the both sides.
10. Power on the Fan Unit.
In case of MPR-LH subrack is cooled by a fan assembly it can have one or two fan units, depending
A fan support shelf with a single fan unit is used to cool up to five RTs on the same side of the subrack
A fan support shelf with two fan units must be used to cool RTs in both sides of the subrack
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
Silicon grease must be put on the nose adapter O-ring when indicated in the manufacturer's
installation instructions. If grease for O-ring is not mentioned, it must be avoided
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Antenna fixing & Polarization
The survival wind speed of 200 km/h (125 mph) is achieved with one swaybar at the reflector
supporting plate. This avoids the risk of reflector damage and simplifies the installation.
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Antenna Installation
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
V polarization H polarization
A waterproofness tape is glued on the waveguide of the coupler and it must never be removed.
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
H polarization
Diplexer
Diplexzer / ODU
TX / RX for Low site Round MPT ODU O-RING gasket
TX / TX for High site
RX / TX
RX / RX
Internal diplexer External diplexer
(6 and 11 to 38 GHz) (5.8, L6, U6, 7, 8, and 10.5 GHz)
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Coupler Polarization Change (6-7-8 GHz)
1. Check or change the polarization of the RF coupler.
2. Unscrew the screws.
3. Turn the thin twist and to make to coincide the position H to the point of reference A
4. Screw the screws.
5. Install and secure the coupler module through the four hooks on the relative brackets / Antenna
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
OMT Polarization Change
1. Remove nothing on the OMT
2.Only rotate the MPT without changing the polarization of the Thin.
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
MPT installation
1.Verify polarization
2.Install the MPT 1+0 on the antenna / 1+1 on the RF coupler
2. Secure the MPT module through the four hooks (1) on the relative brackets (2)
3. Pre-point the antenna.
4. Reinstall the solar shield onto each MPT transceiver by screwing on it the solar shield screws.
5. Affix the EMF stickers.
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
XPIC Port
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Cables connection
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Cables connection
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Cables connection
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
Lightning suppressor
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Grounding
Connect the MPT grounding connector to the nearest grounding plate, using
the ground cable 16mm 3CC08166AAXX
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
- Ensure the antennas are aligned on the main beam, and not a side lobe
The ODU 300 has a BNC female connector to check the Received signal (RSSI) during antenna alignment.
The MPT has lemo connector to check the Received signal (RSSI)
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Antenna Alignment
(A) LEMO connector, to be plugged into LEMO connector on MPT-HC/MPT-MC.
(B) Banana plugs : output is a 0 to +5V DC voltage proportional to the radio Rx field. During equipment lineup, through a
multimeter it is possible to easily point the antenna until the measured voltage is the maximum, corresponding to the
maximum radio Rx field.
- Ensure the antennas are aligned on the main beam, and not a side lobe
The ODU 300 has a BNC female connector to check the Received signal (RSSI) during antenna alignment.
The MPT has lemo connector to check the Received signal (RSSI)
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Typical Installation
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
16. Useful Links
Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA