Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


System Architecture

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


9500 Family Components
9500 MPR
Microwave Packet Radio

Microwave Transceivers Microwave Service Switch

Outdoor Units Indoor Units

Up to 6 ODU300 can be connected to an MSS-8


Up to 18 MPT can be connected to an MSS-8
MPT-HL MSS-8
Note: The maximum number that can be powered
directly by an MSS-8 shelf is 8.

Up to 2 ODU300 can be connected to an MSS-4


MPT-HC Up to 12 MPT can be connected to an MSS-4
MSS-4
Broadcasting
Mobile TV Up to 2 MPT can be connected to an MSS-1c
Up to 6 MPT can be connected to an MSS-1
MSS-1C-1
MSS-O Available in R5.2
MPT-MC

MSS-O

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Rack Installation and Grounding
Before to start the Installation please ensure that you have the site Engineering document
describing the Physical installation in order to know where to install the Indoor / Outdoor
equipments.

Indoor units of the 9500 MPR system can be installed in 3 different ways :

ETSI (WTD) rack 21


Standard rack 19
The equipement can also be installed on the wall

For each of the above type of installation special mechanical supporting fixtures are available.

Warning : The rack must be connected to the ground before any electrical connection is performed.
The grounding cable must be the same section size as the power cables connected to the batteries.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Rack 21 Installation and Grounding
1 Refer to the plan or site survey document to see rack raw assignment
2 Position & mount the rack in a vertical position
3 Mark the base plate with the holes to be drilled on the floor and drilled the floor
4 - Fasten the rack to the station structure using expansion bolts or fixing to floating floor

5 Ground the rack to the station using a 16 to 25 mm2


section cable (1) terminated on the cable terminal lug (2).

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Rack 19 Installation and Grounding
The Laborack must be fixed to the floor by means of the four (4) screws.

1 Refer to the plan or site survey document to see rack raw assignment
2 Assemble the rack
3 Position & mount the rack in a vertical position
4 Mark the base plate with the holes to be drilled on the floor and drilled the floor
5 - Fasten the rack to the station structure using the four screws or fixing to floating floor

6 Ground the rack to the station.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Wall support Installation and Grounding
The IDU wall mounting kits 10U (3CC50027AAAA) (max 4 MPT) and 3U (3CC09614AAAA) can be used for wall
installation and must be fixed to the wall by means of the four (4) screws.

1 Refer to the plan or site survey document to see rack raw assignment
2 Position & mount the Wall mount support in a vertical position
4 Mark the base plate with the holes to be drilled on the wall and drilled the wall
5 - Fasten the rack to the station structure using the four screws or fixing to floating floor

6 The mechanical support must be grounded using the Grounding Kit 3CC13423AAAA

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


TRU installation & connection
The TRU is a power supply panel used to provide the power supply (- 48V) to the equipment.
It is fixed to the top of the rack by means of four screws.
Various power distribution panel kits are available. Please refer the user manual.

Panel with 6 fuses : 3CC50160AAXX Panel with 10 breaker 3CC50155AAXX Panel with 20 breaker 3CC50156AAXX
fuses included: 6x6A; 6x16A; 2x32A. (Breakers not included) (Breakers not included)

If the ETSI 21 rack is in use, the ETSI rack mounting kit (3CC50042AAAA) must be used.
Brackets must be positioned in the correct orientation with the engraved UP writing on the top.

1. Install the nut cage on the rack in order to fix the TRU.
2. Fixe the TRU to the top position on the rack.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
TRU installation & connection
Note: The TRU is grounded through the fixation screws on the rack. Do not connect the GND point on the TRU.

3. Connect the Battery cables.

a. Connect the black cables (+) from the two batteries to the GND bar connection toward the station ground.
b. Connect the blue cables (-) to the power clamps at the left side (battery A) end and them toward the top of the rack.
c. For redundant battery applications, repeat steps 3 to 4 to connect battery B.

4. Insert the breaker

a. Remove the plastic protection cap on the position the breaker needs to be inserted
b. Close the lock on the breaker and insert it in the TRU.
c. Open the breaker lock and fix the breaker correctly on the DIN rail.
e. Close the breaker lock and tighten the upper screw.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
TRU installation & connection
5. Connect the black cables (+) to the GND bar connection and tighten the corresponding screw.
6. Connect the blue cable (-) to the breaker and tighten the corresponding screw.
The other end of the cable will be connected to the equipment when it is installed in the subrack.

Example of new TRU arrangement for 9500 MPR-LH (MPT-HL v2)

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Recommended breaker values
Breakers of different values Breakers of different values

1AB284990001 circuit breaker 2A 1AB058580013 circuit breaker 16A


1AB058580014 circuit breaker 6A 1AB121750001 circuit breaker 20A
1AB058580016 circuit breaker 10A 1AB121750002 circuit breaker 32A

Recommended breaker / fuse values (A)

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


MSS-4-8 Installation
1. Install the nut cage on the right place in the rack in order to fix the MSS.
2. if needed install the braket kit on the MSS then Positioning MSS sub-shelf and fix the MSS with screws

Braket Kit Braket Kit

4. Ground the MSS 4-8 sub-shelf


5. Two cords 3CC52190AAXX 2x6 mm2 for MSS 8 or 3DB18271AAXX 2x4 mm2 for MSS 4 shall be used for the supply
connections.
6. Identify the breakers in the TRU slots that correspond to the positions that you need to install.
7. Route the cables from the breaker in the TRU to the cable duct depending on the MSS location.
8. Connect the blue (-) / black (+) cable from the equipment to the connector then to the power supply A & B
breaker terminal and tighten the corresponding screw.
9. Label the cable on the both sides.
10. Power on and configure the MSS.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
MSS-8 Installation

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


MSS-1 Installation
1. Install the nut cage on the right place in the rack in order to fix the MSS.
2. if needed install the braket kit on the MSS then Positioning MSS sub-shelf and fix the MSS with screws

4. Ground the MSS 4 sub-shelf.


5. Two cords 1AC007800068 2x1 mm2 shall be used for the supply connections of the MSS 1 sub-shelf.
6. Identify the breakers in the TRU slots that correspond to the positions that you need to install.
7. Route the cables from the breaker in the TRU to the cable duct depending on the MSS location.
8. Connect the blue (-) / black (+) cable from the equipment to the connector then to the power supply A & B
breaker terminal and tighten the corresponding screw.
9. Label the cable on the both sides.
10. Power on and configure the MSS.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
MSS-1c Installation
1. Install the nut cage on the right place in the rack in order to fix the MSS.
2. Install the braket kit 3DB77008ACXX on the Rack then positioning MSS sub-shelf and fix the MSS with screws

4. Ground the MSS 1c sub-shelf


5. One cord 1AC007800068 2x1 mm2 shall be used for the supply connections of the MSS 1c sub-shelf.
6. Identify the breakers in the TRU slots that correspond to the positions that you need to install.
7. Route the cables from the breaker in the TRU to the cable duct depending on the MSS location.
8. Connect the blue (-) / black (+) cable from the equipment to the connector then to the power supply A & B
breaker terminal and tighten the corresponding screw.
9. Label the cable on the both sides.
10. Power on and configure the MSS.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Power supply 1mmsq zip cables 1AC007800068
1. Separate a 250 mm length of cable into two wires and make a loop of approximately 45 mm on one wire.
2. Install & Close the ferrite on the wire.

3. Pull the wire on both sides to tighten.


12. Cut the two wires and remove the wire jacket as shown.

13. Connect the blue cable (-) from the equipment to the negative connector input.
14. Connect the black cable (+) from the equipment to the positive connector input.
Blue strip wire = Negative Battery input

16. Terminate the power cord by inserting the wires in the dedicated connector slot.
17. Label the both sides of the cable.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Fan Unit Installation
1. Install the nut cage for the fan support in the dedicated positions and attach the fixing screws.
2. Attach the fan module to the support. (up to two fan units).
If only one fan is installed, you must install the Fan cover plate (3DB80464AAAA) in the empty fan position

3. One cord 1AC007800068 2x1 mm2 shall be used for the supply connections of the Fan Unit.
4. Identify the breakers in the TRU slots that correspond to the positions that you need to install.
7. Route the cables from the breaker in the TRU to the cable duct depending on the Fan Unit location.
8. Connect the blue (-) / black (+) cable from the equipment to the connector then to the power supply A & B
breaker terminal and tighten the corresponding screw.
9. Label the cable on the both sides.
10. Power on the Fan Unit.

In case of MPR-LH subrack is cooled by a fan assembly it can have one or two fan units, depending

A fan support shelf with a single fan unit is used to cool up to five RTs on the same side of the subrack
A fan support shelf with two fan units must be used to cool RTs in both sides of the subrack

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Indoor accessories for MSS
3CC50042AAAA 21 bracket kit for distribution panel
3CC50027AAAA IDU wall mounting kit (10U)
3CC09614AAAA IDU wall mounting kit (3U)
3DB16102AAAA Panel E1 protection 120 ohm
3DB16151ABXX Trib/serv panel 19 universal bracket kit
3CC07810AAAA 3U Distributor subrack for 120 ohm EMC
3CC08061AAAA Connector support 1.5./5.6 75 ohm (Panel 1U)
3DB16104AAAA Panel E1 protection 75 ohm 1.0/2.3
3CC08061ABAA Connector support BNC 75 ohm (Panel 1U)
1AD114560001 Laborack (19" rack)

3DB04656AAXX ETSI rack (H2200 21" rack)


3DB18181AAAA Bracket kit for MSS-8 in 21 rack
3DB18171AAXX Bracket kit for MSS-4 in 21 rack
3DB19041AA 0.5 U bracket for 21 ETSI rack
3CC13424AAAA Rack grounding kit
3CC13423AAAA Subrack grounding kit (includes the yellow/green cable)
3CC06503AAAA Consumable kit
3DB18181AAAA IDU kit subrack (brackets 21" kit)
1AF15185AAAA IP Phone
3CC50065AAAA 19 to 21 adapter bracket kit 1U
3CC50173AAXX MPT Power Unit
3CC50174AAXX MPT Extended Power Unit

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Antenna fixing & Polarization
1. Antenna mounts are designed for use on industry-standard 114 mm OD pipe-mounts.
2. Depending of the antenna, assemble the Antenna Kit corresponding to the manufacturer's installation instructions.
3. Check or change the polarization on the Antenna nose. Follow the instructions supplied with each antenna.
4. Fix the Antenna on the standard 114 mm OD pipe-mounts.

Silicon grease must be put on the nose adapter O-ring when indicated in the manufacturer's
installation instructions. If grease for O-ring is not mentioned, it must be avoided

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Antenna fixing & Polarization
The survival wind speed of 200 km/h (125 mph) is achieved with one swaybar at the reflector
supporting plate. This avoids the risk of reflector damage and simplifies the installation.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Antenna Installation

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


MPT Polarization

Polarization reference Polarization reference

Unscrew the 2 screws and


rotate to change the
polarization

V polarization H polarization

A waterproofness tape is glued on the waveguide of the coupler and it must never be removed.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
H polarization
Diplexer
Diplexzer / ODU
TX / RX for Low site Round MPT ODU O-RING gasket
TX / TX for High site
RX / TX
RX / RX
Internal diplexer External diplexer
(6 and 11 to 38 GHz) (5.8, L6, U6, 7, 8, and 10.5 GHz)

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


RF couplers for 6-7-8 & 11-38 GHz bands
The ODU coupler is used in the 1+1 HSB or 1+1/2x(1+0) FD co-polar
configurations.

The coupler can be :

Equal type (3 dB/3 dB insertion loss)


Unequal type (1 dB main path/10 dB secondary path)

Bands from 11 to 38 GHz Bands 6-7-8 GHz

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Coupler Polarization Change (11-38 GHz)
1. Check or change the polarization of the RF coupler.
2. The axial adaptation between H polarization to V polarization (and vice-versa) is a
mechanical/electrical adjustment. Every mechanical STEP is a 30 adjustment.
3. Unscrew the screws.
4. Turn the thin twist and to make to coincide the position H to the point of reference A
5. Screw the screws.
6. Install and secure the coupler module through the four hooks on the relative brackets / Antenna

1st Step = internal 30 rotate

2nd Step= cover + screws 60(30+ 30) rotate

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Coupler Polarization Change (6-7-8 GHz)
1. Check or change the polarization of the RF coupler.
2. Unscrew the screws.
3. Turn the thin twist and to make to coincide the position H to the point of reference A
4. Screw the screws.
5. Install and secure the coupler module through the four hooks on the relative brackets / Antenna

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
OMT Polarization Change
1. Remove nothing on the OMT
2.Only rotate the MPT without changing the polarization of the Thin.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
MPT installation
1.Verify polarization
2.Install the MPT 1+0 on the antenna / 1+1 on the RF coupler
2. Secure the MPT module through the four hooks (1) on the relative brackets (2)
3. Pre-point the antenna.
4. Reinstall the solar shield onto each MPT transceiver by screwing on it the solar shield screws.
5. Affix the EMF stickers.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Pole mouting for remote ODU
1. Check/Set the coupling between the transceiver and external diplexer (only for MPT-HC/MPT-XP with external
diplexer).
2. Install the Nose Adapter on the Pole Mounting for Remote ODU. Installation kit (3DB10137AAXX)
3. Install the Pole Mounting for Remote ODU in accordance with the manufacturers instructions.
In case of missing instructions, fix the U-bolts with 34 N x m tightening torque.

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Cables connection
LEMO Connector Optical RPS Port
XPIC or RPS module (Optional)
Not avalaible for MPT-HC.
Only MPT-HC v2

XPIC Port

1000 BaseT Electrical


Ethernet Port (RJ-45)
Power Feed over
Optical Gigabit Ethernet port (above 100mt) Ethernet (CAT5 up to
with Power feed over separate Coax 100mt)

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Cables connection

It is Mandatory to use RJ45 Hirose tool for MPT


Ref 1AD160490001
R2CT connector for DC
Extractor

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Cables connection

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Cables connection

PFoE Power Supply

CAT5e cable data and DC


1AC015760006 Ground

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Grounding
Antenna point

Lightning suppressor

MPT / ODU point

Coaxial / Ethernet Cable CAT5e

On top, when it comes on the tower


On bottom, when it leaves the tower
Above 50m tower, no more than 25m
intervals without grounding
At the entrance of the building

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Grounding
Connect the MPT grounding connector to the nearest grounding plate, using
the ground cable 16mm 3CC08166AAXX

For MPT ETSI For MPT ANSI

Kit for Ethernet cable or coaxial cable ( 6,85) 1AD040130004


Kit for coaxial cable ( 10,3) 1AB128500002

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Antenna Alignment
(A) LEMO connector, to be plugged into LEMO connector on MPT-HC/MPT-MC.
(B) Banana plugs : output is a 0 to +5V DC voltage proportional to the radio Rx field. During equipment lineup, through a
multimeter it is possible to easily point the antenna until the measured voltage is the maximum, corresponding to the
maximum radio Rx field.

- Ensure the antennas are aligned on the main beam, and not a side lobe

The ODU 300 has a BNC female connector to check the Received signal (RSSI) during antenna alignment.

The MPT has lemo connector to check the Received signal (RSSI)

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Antenna Alignment
(A) LEMO connector, to be plugged into LEMO connector on MPT-HC/MPT-MC.
(B) Banana plugs : output is a 0 to +5V DC voltage proportional to the radio Rx field. During equipment lineup, through a
multimeter it is possible to easily point the antenna until the measured voltage is the maximum, corresponding to the
maximum radio Rx field.

- Ensure the antennas are aligned on the main beam, and not a side lobe

The ODU 300 has a BNC female connector to check the Received signal (RSSI) during antenna alignment.

The MPT has lemo connector to check the Received signal (RSSI)

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Typical Installation

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA
Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment
16. Useful Links

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Useful Links
WT Portal : http://all.alcatel-lucent.com/wps/portal/businessgroups/carrier/wtp
WT Forum : http://forum.app.alcatel-lucent.com/
LKDI Portal : https://softwarekeys.alcatellucent.com/flexclientws/home.jsp
OLCS : User Manual,Release note, Software, etc.

VIDEO TRAINING (Not Updated) : https://training.alcatel-lucent.com/Saba/Web/Main

TER60006W -> 9500 MPR_R3.3_SW Installation and Commissioning


TWT18014W -> 9500 MPR _Rx.x_Hardware Installation

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Agenda
1. System Architecture & Family
2. Rack Installation and Grounding
3. TRU installation & connection
4. Recommended breaker
5. MSS 4-8 Installation
6. MSS 1-1c Installation
7. FAN unit Installation
8. Indoor accessories for MSS
9. Antenna Polarization & Installation
10. MPT Polarization & Diplexer
11. Coupleur Polarization & Installation
12. Pole mounting for remote ODU
13. Cables Connection
14. Grounding
15. Antenna Alignment

All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA


Mettre en Annex

Installation test and turn up MPR 3.0 | November 2010 All Rights Reserved Alcatel-Lucent 2010, 3FQ 24013 31XH WQZZA

Potrebbero piacerti anche