GAMMON INDIA LIMITED

VILLAGE MORH, TEHSIL-UDHAMPUR,


J&K (182101)
ABOUT THE COMPANY

GAMMON INDIA LIMITED is the largest civil engineering construction


company in India.
Headquartered in MUMBAI, it was founded in 1922 by JOHN C.
GAMMON.
The company has secured a RS 1,709.99 crore project from National
Highways Authority Of India (NHAI) for widening of UDHAMPUR to
RAMBAN section of NH1A in JAMMU& KASHMIR, GAMMON INDIA said in
a filing to the BSE.
COMPANY STARTSFOUR LANING OF NATIONAL HIGHWAY FROM
UDHAMPUR TO RAMBAN SECTION OF NH-1A (NOW NH 44) FROM
KM67+000 TO KM 89+000 AND KM 130+000 TO 151+000 ON EPIC
MODEINTHSTATE OF JAMMU & KASHMIR UNDER NHPD PHASE II.
INTRODUCTION
THE HIGHWAY FOUR LANING STARTS FROM
JAMMU CONNECTING VARIOUS DISTRICT
(UDHAMPUR, RAMBAN, REASI ETC) , (MATA
VAISHNO DEVI KATRA WHICH IS 27 KMS FROM
HIGHWAY), POWER PROJECTS, PLACES, MAJOR
POJECTS SUCH AS CHENANI NASHRI TUNNEL
(9.2KMS) BAGLIAR HYRO ELECTRICITY POJECT
RAMBAN, BANIHAL,PAHALGAM ,ANANTNAG,
SRINAGAR AMAR NATH CAVE AND MANY MORE
HISTORICAL BUILDINGS AND PLACES.
LIST OF
CONTENTS
AGGREGATE IMPACT VALUE TEST
BREAST WALL
PAVEMENT
CULVERT
AGGREGATE IMPACT VALUE
AIM: To determine the aggregate impact value of coarse aggregates as per
IS: 2386 (Part IV) - 1963.
APPARATUS:
i) Impact testing machine conforming to IS: 2386 (Part IV) - 1963
II) IS SIEVES OF SIZES - 12.5MM, 10MM AND 2.36MM
III) A CYLINDRICAL METAL MEASURE OF 75MM DIA. AND 50MM DEPTH
IV) A TAMPING ROD OF 10MM CIRCULAR CROSS SECTION AND 230MM
LENGTH, ROUNDED AT ONE END
V) OVEN 300 0C
S. No Net weight of The faction The Aggregate
aggregates in the passing through fraction impact
measure in g (A) 2.36mm Is sieve in retained value = B/A
on 2.36 X 100 %
g (B)
mm Is
sieve in g
(C)
1. 366 50 316 13.66%

2. 350 48 302 13.71%


Average 13.68%
valUe
DESIGN OF BREAST
WALL
A WALL BUILT TO SUSTAIN THE FACE OF A NATURAL BANK OF
EARTH-COMPARE
RETAINING WALL.
1) The base of breast wall depends upon its height i.e.
FOR 3 METRE OF HEIGHT :
Height/3 + 0.60 i.e.3m/3 + 0.60 = 1.60 m of base
FOR 6 METRE OF HEIGHT :
Height/3 + 0.60 i.e. 6m/3 + 0.60 = 2.60 meter of base
2) Slope is given to the breast wall i.e. equal to 30% in 1 meter.
3) Weep holes are provided in 3rd layer of wall .
Diameter of weep holes is about 160 mm .
4) Bond stone is provided for strength It is provided in 4 th layer of
stones.
Bond stones are made up of concrete of M15 grade (1 :2 :4).
DESIGN OF
PAVEMENT
BITUMINOUS CONCRETE (BC) - 25 mm
DENSE BITUMINOUS CONCRETE (DBC) - 50 mm
WET MIX MACADUM (WMM ) - 250mm
GRANULAR SUB-BASE (GSB) - 500mm
SUBGRADE - 250mm
TOTAL - 1075mm
CULVERT
A tunnel carrying a stream or open drain under a road.
The culvert system is totally enclosed by soil or ground.
MATERIAL FOR CULVERT CONSTRUCTION:
1. Concrete
2. Steel
3. Plastic
4. Aluminium
5. High density polyethylene
TYPE OF CULVERT
6. Pipe culvert
7. Pipe arch
8. Box culvert
ROAD: Roads are defined as routes
or paths that begin at one
destination and lead to another.
CARRIAGEWAY: The part of a road
used by vehicular traffic is called
carriageway.
LAYERS OF CARRIAGEWAY:

EARTH WORK
GRANULAR SUB BASE
WET MIX MACADAM
BITUMINOUS MACADAM
TACK COAT
THANK YOU