Sei sulla pagina 1di 33

Maintenance - Valves Division KSB PUMPS Ltd.

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

Total Productive Maintenance (TPM) is a maintenance


program concept.Philosophically,TPM resembles
Total Quality Management (TQM) in several aspects, such as

(1)total commitment to the program by upper level


management is required,

(2) employees must be empowered to initiate


corrective action, and

3) a long range outlook must be accepted as TPM

may take a year or more to implement and is an on-going


process.
Changes in employee mind-set toward their
job responsibilities must take place as well.
MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

History of TPM
TPM evolved from TQM, which evolved as a direct result
of Dr. W. Edwards Deming's influence on Japanese industry.
Dr. Deming began his work in Japan shortly after
World War II. As a statistician.
Dr. Deming initially began to show the Japanese how to
use statistical analysis in manufacturing and how to use the
resulting data to control quality during manufacturing.

The initial statistical procedures and the resulting quality


control concepts fueled by the Japanese work ethic soon
became a way of life for Japanese industry.

This new manufacturing concept eventually became knows


as Total Quality Management or TQM.
MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

Background of TPM

Main manufacturing excellence approach of Toyota and


other excellent Japanese companies since the 70s

TPM is the foundation for JIT FA Poke Yoke, Lean


Manufacturing & Zero Defects

Comes from the best of Japanese Industrial Excellence


and evolved from the heat of the continuing Energy Crisis

and Globalization Challenges to achieve more with Less

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

What For TPM?


TPM brings maintenance into focus as a necessary
and vitally important part of the business.

It is no longer regarded as a non-profit activity.

Down time for maintenance is scheduled as a part


of the manufacturing day and, in some cases, as an
integral part of the manufacturing process.

It is no longer simply squeezed in


whenever there is a break in material flow.

The goal is to hold emergency and


unscheduled maintenance to a minimum.
MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

What is TPM?

T Total Overall efficiency.


Total production system.
Participation of all employees.

P Productive Zero defect.


No trouble in operation.
Safety.

M Maintenance Longer life cycle of production


system.

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

What is TPM?
Aims at Breakthrough improvement in productivity and
reducing chronic losses to zero.
Aims at Creating a bright, clean, and pleasant factory.
Means To reinforce people and facilities and through them,
the whole organization.
Addresses Overall equipment effectiveness.
Institutionalizes Total Employees Involvement
Participative management and an Overall-small group
organization.
Eliminates inter departmental walls and facilitates Cross
Functional Management.
Is material oriented; it seeks to keep equipment in its intended
condition.

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

TPM Results in
Results in building up corporate culture that thoroughly
pursues production

System efficiency improvement OEE (Overall Equipment


efficiency-)
Constructs a system to prevent every kind of loss, for example
Zero accidents, Zero defects and Zero failures based Gemba
(Work Place) and Genbutsu (actual thing) over the entire life
cycle of a production system.
Covers all departments including production, Quality Control,
Purchase, marketing, Administration, Design & development,
Maintenance & Engineering.
Requires all and full involvement from top management to
frontline employees. It builds up an overlapping multidiscipline
process based management teams to achieve excellence
MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

What is OEE?

Overall Equipment Efficiency

OEE = A x P x Q

A= Availability
P= Performance
Q= Quality

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

How to Calculate OEE?


Availability = Standard time downtime

Standard time

Components Produced
Performance =
Components supposed to be Produced

Total Acceptable Components


Quality =
Total Components produced
MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

Why TPM?
MARKET CIRCUMSTANCES IN-HOUSE CIRCUMSTANCES
Easy funds for /capacity build up Rising cost of raw material
Market demand / consumption Higher power cost & specific
sluggish, High quality competition power
in the market Higher specific fuel consumption
Result -Stiff competition, low Higher man power cost
returns Heavy losses, low profit due to
Opportunity to earn profit equipment failures / low reliability /
Increasing quality consciousness indifferent attitude
in market Lower skill levels and involvement
New plants very efficient and cost Compartmentalization,
effective. lack of horizontal communication
Increasing input material cost Low moral/ organizational politics
Increasing wages and salaries. Unsafe working
Pressure from TOP to progress fast

CRISIS FOR THE COMPANY


MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

Need for a system which focus on:


Cost reduction through loss control
Market share expansion /customer satisfaction
INCREASED PROFITABILITY
Skill up-gradation
Reduced distribution cost
Reduced equipment failure
Employees involvement

May decide to adopt TPM

To improve equipments operating efficiency and reliability


Thereby achieve cost reduction. Market share expansion.

Skill development. Zero loss, add profits


High productivity full employee involvement & dynamic
team
MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

Effectiveness of TPM

RESULTS EXPECTED ESSENTIAL REQUIREMENTS

Productivity enhancement
Employee Involvement
Cost Reduction
Top management Commitment
Delivery period shortening
Management Tools
Sales Expansion

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

Process
The process adopted is a proven methodology based on:
1. Understanding the current status
2. Setting up an organisation
3. Training people
4. Identifying model areas and machines for initial improvement
5. Improvement of Model machines to the original condition and
achievement of zero loss concept. Each machine is to be
improved by a Cross Functional Team consisting of 1 team
leader (Manager Level) and 5-6 members consisting of
Engineer/Supervisor level.
6. Horizontal deployment of the approach to the rest of the plant
7. Finally covers entire organization and involve every employee
from top to bottom.

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

16 major Losses
1. Equipment failure loss
2. Set up & adjustment loss
3. Cutting tool and jig change loss
4. Start up loss
EQUIPMENT LOSS
5. Minor Stoppage and idling loss
6. Reduced speed loss
7. Defects &rework loss
8. Shutdown loss
9. Management loss
10. Operating motion loss
11. Line organization loss MAN LOSS
12. Logistics loss
13. Measurement and adjustment loss
14. Energy Loss
15. Die, Tool and Jig loss MATERIAL& ENERGY LOSS

16. Yield loss


MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

7 Types of Waste

1. Over Production waste

2. Inventory waste

3. Conveyance waste

4. Defect production waste

5. Idle time waste

6. Process related waste

7. Operation related waste

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

Set PQCDSM target in all areas


P PRODUCTIVITY To achieve planned production.

Q QUALITY To improve product & process quality.

C COST To reduce cost

D DELIVERY To meet delivery targets

S SAFETY To maintain safety

M MORALE To improve morale

PQCDSM To be calculated & improved by using PDCA cycle.

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

SDCA- PDCA Cycle


DO CHECK
Improvement Improvement D C Improvement
results
Activities PLAN
ACT
Improvement P A standardize
to results or
plan for next
improvement
Focus cycle
on Initiate improvement Standardization
Vital
few

ACT
Know the
TO Improve the A S STANDARD
Routine standards or its use
DO
work CHECK the work C D the work
against the standard according to
the standard

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

POINTS TO IMPROVE
Throw out the Traditional concepts of manufacturing methods

Think of How the new method will work: not how it wont

Dont accept excuses

Correct Mistakes the moment they are found

Problems give you the chance to use your Brain

Ask WHY five times

Ten persons ideas are better than one persons knowledge

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

A - Type B - Type C - Type

Problem Problem
Problem

Action : This stage No Action : This stage


Action taken this stage

Problem Resolved
Problem Resolved Problem Resolved
No chances of reoccurrence
chances of reoccurrence without any action
chances of reoccurrence

Tool to be used : Y Y analysis Tool to be used : PM analysis Tool to be used : E & T

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

7 QC Tools

1) Check sheet

2) Pareto diagram

3) Cause & effect Diagram

4) Graph & control charts

5) Histogram

6) Stratification

7) Scatter diagram

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

OTPM
SHE
E&T
QM

DM
JH
5S

PM

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

2 JISHU HOZEN
THIS PILLAR DEVELOPS OPERATOR TO TAKE CARE OF SMALL MAINTENANCE TASKS .
RESULTING SKILLED MAINTENACE TEAM TO CONCETRATE ON VALUE ADDED AND
TECHNICAL REPAIRS .

THE OPERATOR RESPONSIBLE FOR UP KEEP OPF THEIR EQUIPMENT TO PREVENT IT

FROM DETERIORATING

7STEPS
1. Initial cleaning
2. Counter measures for the causes of forced deterioration& improve hard to access
3. Preparation of tentative JH standards
4. General inspection
5. Autonomous Inspection
6. Standardization
7. Autonomous Management

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

3 PLANNED MAINTENANCE
THIS PILLAR AIMED TOWARDS

TROUBLE FREE MACHINES AND EQUIPMENTS

PRODUCING DEFECT FREE PRODUCTS FOR TOTAL CUSTOMER SATISFACTION

FOUR CATEGORIES

PREVENTIVE MAINTENANCE
BREAK DOWN MAINTENANCE
CORRECTIVE MAINTENANCE
MAINTENANCE PREVENTION

BENEFITS

ACHIEVE AND SUSTAINAVAILABILITY OF MACHINES


OPTIMUM MAINTENANCE COST
REDUCES SPARES INVENTORY
IMPROVE RELIABILITY AND MAINTENABILITY OF MACHINES

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

11 Steps Approach to Zero Break down


Approach to Zero breakdown
1. Classify B/D data ( Including
Five Phases for concrete actions against breakdown Equipment Ranking)
2. Analysis of present status QC
Phase 1 : Change to natural deterioration
Approach
by eliminating
3. Eliminate forced deterioration
factors of accelerated
4. Find out root cause & implement
deterioration.
countermeasure
5. Identify breakdown recurrence /
Phase 2 : Extend inherent service life of understand phenomenon
equipment by corrective 6. Investigate weakness & improve
it
maintenance ( Improvements to
overcome design limitations)
7. Investigate natural deterioration
Phase 3 : Research natural deterioration 8. Set deterioration pattern
pattern.
Study how deterioration increases 9. Select & evaluate maintenance
over time point & standard
Phase 4 : Search which parameter to 10. Decide PM / TBM / CBM
measure for deterioration 11. Build best maintenance procedure

Phase 5 : Implement predictive


maintenance

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

4 QUALITY MAINTENANCE
THIS PILLAR AIMED TOWARDS

CUSTOMER DELIGHT THROUGH HIGHEST QAULITY


DEFECT FREE MANUFACTURING
ELIMINATING NON CONFORMANCES IN A SYSTMATIC MANNER
REACTIVE TO PROACTIVE LIKE (QUALITY CONTROL TO QUALITY ASSURANCE)

BENEFITS

1. DEFECT FREE CONDITION AND CONTROL OF EQUIPMENTS


2. QM ACIVITY TO CONTROL QUALITY ASSURANCE
3. FOCUS OF PREVENTION OF DEFECTS AT SOURCE
4. FOCUS ON POKA-YOKE (FOOL PROOF SYSTEM)
5. IN LINE DETECTION AND SEGREGATION OF DEFECTS
6. EFFECTIVE IMPLEMENTATION OF OPERATOR QUALITY ASSURANCE
7. ACHIEVE & SUSTAIN CUSTOMER COMPLAINT ZERO

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

5 EDUCATION TRAINING
THIS PILLAR AIMED TOWARDS

DEVELOPING MULTISKILL EMPLOYEES WHOSE MORALE IS HIGH AND WHO HAS


EAGER TO COME TO WORK AND PERFORM ALL REQUIRED FUNCTIONS
EFFECTIVELY AND INDEPENDENTLY

EMPLOYEES WILL BE TRAINED TO ADDRESS THE PROBLEM BY FINDING THE


ROOT CAUSE & ELIMINATING THEM

THE GOAL IS TO CREATE A FACTORY FULL OF EXPERTS

BENEFITS

1. ACHIEVE AND SUSTAIN ZERO LOSSES DUE TO LACK OF KNOWLEDGE /SKILLS


/TECHNIQUE

2. REMOVE FATIGUE AND MAKE WORK MORE ENJOYABLE

3. UPGRADING THE OPERATING & MAINTENACE SKILLS

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

6 DEVELOPMENT MANAGEMENT
THIS PILLAR AIMED TOWARDS
Collection & utilization of feedback information regarding present products before
the start of the design.- like MP sheet.

Measuring needs for Easy of manufacturing by analyzing the process for present products.

Measuring needs for Easy of manufacturing by analyzing process of new products in the
stage of planning & design of products.

By identifying failures possibilities based on design reviews of new products.

By identifying failures possibilities based on trail manufacturing & test of new products.

BENEFITS

1. REDUCES LEAD TIME TO NEW PRODUCT LAUNCH


2. REDUCE THE LOSSES
3. COST EFFECTIVE

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

7 SAFETY HEALTH ENVIROMENT


THIS PILLAR AIMED TOWARDS

CREATE SAFE WORK PLACE AND SAFE WORK PRACTICE

THIS PILLAR PLAY VITAL ROLE WITH OTHER PILLARS ON REGULAR BAISI

BENEFITS

ZERO ACCIDENT

ZERO FIRES

ZERO HELATH DAMAGES

SAFE WORKING CONDITION

SAFE WORK PRACTICE

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

8 OFFICE TPM
THIS PILLAR AIMED TOWARDS

TO IMPROVE PRODUCTIVITY

EFFICIENCY IN THE ADMINSTRATIVE FUNCTIONS AND IDENTIFY TO ELEMINATE


LOSSES

ANALYZYING PROCESSES AND PROCEDURES TOWARDS INCREASED OFFICE


AUTOMATION

BENEFITS

INVENTORY REDUCTION

LEAD TIME REDUCTION OF CRITICAL PROCESS

EQUILISING THE WROK LOAD

RETRIEVAL TIME REDUCTION (REDUCE REPETITIVE WORK)

BETTER UTYILIZED WORK AREA

REUDCTION IN ADMINISTRATIVE COSTS


MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

Practice TPM to Attain our Goals

INCREASE IN ASSET UTILIZATION AND EQUIPMENT OEE

FOSTER PRODUCTION EQUIPMENT OWNERSHIP

EQUIPMENT BREAK DOWN PREVENTION (PLANNED MAINTENANCE


THROUGH CM TBM &CBM

DEFECT PREVENTION (QM PROCESS & POKA YOKE)

EVOLVING IN TO SELF DIRECTED WORK TEAMS (SDWTS )& Lean Manufacturing

MPA Maintenance
Maintenance - Valves Division KSB PUMPS Ltd.

MPA Maintenance

Potrebbero piacerti anche