Sei sulla pagina 1di 18

RELIABILITY &

INSPECTION DEPARTMENT
ROLE OF RELIABILITY &
INSPECTION ?
A CORROSION CONTROL GROUP
A PLANT INSPECTION GROUP
A REFRACTORY INSPECTION GROUP
WHAT FOR R&I ?
FOR ENSURING QUALITY
FOR PLANT RELIABILITY
FOR EQUIPMENT SAFETY
FOR CORROSION CONTROL
FOR MINIMISING DOWNTIME
INSPECTION ACTIVITIES
INSPECTION
CORROSION CONTROL
REFRACTORY
FAILURE INVESTIGATION
MISCELLANEOUS
R&I ACTIVITIES - INSPECTION
STATIC EQUIPMENT AND PIPING
INSPECTION
WELDING PROCEDURES AND WELDING
INSPECTION
WELDER QUALIFICATIONS
NDT INSPECTIONS & HYDROTESTS
IN-SITU METALLOGRAPHIC STUDIES
QUALITY ASSURANCE
CORROSION CONTROL
PAINTING PROCEDURES &
INSPECTION
SPECIAL COATINGS & LININGS
RUBBER LINING REPAIRS &
INSPECTION
WATER TREATMENT MONITORING
EVALUATION OF NEW PRODUCTS
REFRACTORIES
SELECTION OF MATERIALS &
DESIGNING SPECIFICATION.
INSPECTION & QUALITY ASSURANCE
OF REFRACTORY JOBS.
PERIODIC INSPECTION.
FAILURE INVESTIGATION
TESTING AND ANALYSIS OF SAMPLES
METALLURGICAL & METALLOGRAPHIC
EXAMINATIONS
INVESTIGATE THE CAUSE OF
COMPONENT FAILURES.
GIVE RECOMMENDATIONS &
CORRECTIVE MEASURES.
MISCELLANEOUS
COMPLIANCE WITH STATUTORY
REGULATIONS SMPV, FR,IBR
APPROVAL OF NEW PRODUCTS &
AGENCIES
DOCUMENTATION OF ALL
ACTIVITIES
R&I FACILITIES
NDT LAB
R&I LIBRARY
A PROFESSIONAL TEAM
NDT LAB
DP TEST KIT VISUAL &
FLUORESCENT
ULTRASONIC THICKNESS METER
ULTRASONIC HARDNESS TESTER
DFT METER
RADIOGRAPHY FACILITY
R&I LIBRARY
ASM HANDBOOKS
SET OF ASME CODES
CORROSION HANDBOOKS, TABLES
WELDING HANDBOOKS VOLUMES
IBR CODES, FACTORY RULES, ETC
R&I TEAM
CONSISTS OF
EXPERIENCED METALLURGISTS
WELDING INSPECTORS
NDT SPECIALISTS
EXPERIENCED TECHNICIANS
R&I PLANS
To adopt the best inspection
practices in the process industry.
To adopt Risk Based Inspection (RBI)
To adopt a Proactive approach for
Inspection
IMPROVED INSPECTION PRACTICES
Equipment Performance Analysis.
Continuous/online Condition
monitoring
Quality Assurance during
Procurement, Installation and
Commissioning.
One time and continuous reviews of
existing procedures and inspection
practices.
Design/Data Sheet review and
PROACTIVE APPROACH
Equipment inspection schedules to
be prepared in consultation with
plant process and TLS.
Specific problematic equipments are
identified for inspection and health
monitoring.
Regular NDTs are carried out on
critical equipments for constant
monitoring.
Development of new materials for
FUTURE PLAN-RISK BASED
INSPECTION(RBI)

Equipments are classified based on


Risk of Failure and Consequence of
Failure.
Process loops will be identified /
classified as Corrosion Loops by a
committee (Process, TLS,Inspection).
Corrosion loops will be identified
based on the corrosion degradation
mechanism involved.
Benefit - Only critical areas needs to
THANK YOU

Potrebbero piacerti anche