Task Description
Identify an engineering firm that also provide
architectural services and is registered under
the BEM.

Your are required to seek information on the


procedures involved in obtaining approval for a
development project. Present the procedures
you identified in the form of flowchart.

Identify what should be consisted in the


submissions for the above purpose. List all by
main requirements by the local authorities in Yves
obtaining the approval. Paschal
Nursyafiqah
List the challenges faced by the Principle Tarmizi
Submitting Person (PSP) at the different phases.
Engineering Firm

Content Slide 1
Development Project Approval
Flow Chart of Concurrent Application for Proposal Development (MHLG, 2008)
1 2 3 4

Conversion of Planning Building Plan Sub-Division Cert.


Land Use Permission Approval And
Relev
Section 124/ Section 19, Section 70(1), Section 135-139,
To
204D, Town and Country Street Drainage National Land
Pla
National Land Planning Act. and Building Act. Code.
17
Code. (Act 172, 1976) (Act 133, 1974) (Act 56, 1965)
St
(Act 56, 1965)
Bu
or
13
UB
Environmental
Lo
Quality Act 1984
Ac
El
Content Slide 2
Se
Submission Contents
Applicant Submits Application to Secretariat of One Stop
Centre
The One Stop Centre (OSC) Secretariat shall check and examine
all documents submitted based on the checklist prepared . The
or Document No 2
checklist is as follows:

1. Simultaneous application for conversion and subdivision


under Section 124A National Land Code (NLC) Form 7D, or
application for Surrender and Re-alienation under Section
204D National Land Code (NLC) Form 12D;
2. Application for Planning Permission (Local Council/Authority);
3. Application for Building Plan approval; and
4. Application for Earthworks Plan and application for Road and
Drainage

Subsequent Actions by OSC Secretariat:


5. Register the application
6. Receive the receipt of processing fees
7. Key in data for electronic submission, if applicable. and
8. Issue letter receipt application to the applicant Content Slide 3
ocal Authorities Requirements

Content Slide 4
Principal Submitting Person
The PSP is a professional architect, engineer or building draftsman who submits
building plans to the LA for approval. He must be registered under the relevant
law relating to registration thereof, eg Architects Act 1967 or Registration of
Engineers Act 1967(Revised 1974).

The PSPs responsibilities include:


1. submitting building plans for approval by the LA,
2. supervising the erection and completion of the building in conformity with
the approved plans and the requirements of the provisions of Acts or by-
laws,
3. ensuring all technical conditions imposed by the LA have been duly
complied with; and
4. ensuring that the building is safe and fit for occupation.

Challenges:
5. Issues CCC without forms (relevant forms under provision of Acts or by-Content Slide 5