Sei sulla pagina 1di 26

ANDRITZ HYDRO

Company presentation May


2016
Hydropower
The multiple roles in water and energy

Electricity
For transportation, heat,
power and light

Water storage
For flood mitigation,
irrigation, water supply and
navigation

Energy Storage
For peak load generation, energy
balancing and grid stability
May l 2016

2 www.andritz.com
Hydropower
Global market overview
Technically feasible hydropower potential : ~ 16,000 TWh/year
Hydropower generation: ~ 3,930 TWh/year

North

CChhi
ninaa
America

AAsisaiaexecxlc.

lC. Chihniana
Europe
excl. Russia
and Turkey

Africa

South
America

Technically feasible hydropower potential (GWh/year)


Hydropower generation in 2014 (GWh/year)

Source: Hydropower & Dams World Atlas, 2015


May l 2016

3 www.andritz.com
Hydropower
Electrical energy generation scenario 2050

1 6 10
8
2 11
7

12

13

9
5

4 n Hydropower generation
May l 2016

4 www.andritz.com
ANDRITZ HYDRO
Highlights
We are a global supplier of electro-mechanical systems and services
(from water-to-wire") for hydropower plants and a leader in the
world market for hydraulic power generation.

More than 175 years of turbine experience (1839)

Over 31,600 turbines (more than 434,600 MW) installed


Complete range up to more than 800 MW
Over 120 years electrical equipment experience (1892)

Leading in service and rehabilitation

More than 120 Compact Hydro units per year


May l 2016

5 www.andritz.com
ANDRITZ HYDRO
History

The pioneers created the foundation.


Charmilles

Pelton Water Wheel VOEST

VA TECH HYDRO
Hydro Vevey
Precision Machines
VOEST MCE
Baldwin-Lima-Hamilton
Andritz VA TECH HYDRO AFI
I.P. Morris
Bouvier Waplans Hemi Controls
Ateliers de Constructions GE HYDRO inepar

Mcaniques de Vevey (ACMV) SAT GE HYDRO


Andritz
Bell
ELIN KVAERNER

Pichlerwerke Sulzer Hydro


Mller

Escher Wyss
C.E.G.B. Tampella

English Electric
Boving

KMW KAMEWA

NOHAB Dominion
Finnshyttan Engineering
May l 2016

6 www.andritz.com
The ANDRITZ GROUP
Overview

ANDRITZ is a globally leading supplier of plants, equipment, and services for hydropower stations, the pulp and paper industry, the metal-
working and steel industries, and solid/liquid separation in the municipal and industrial sectors

Headquarters: Graz, Austria

Global presence: over 250 production sites and service/sales companies worldwide

KEY FINANCIAL FIGURES 2015


Unit* 2015

Order intake MEUR 6,017.7


Order backlog (as of end of period) MEUR 7,324.2
Sales MEUR 6,377.2
EBITA MEUR 429.0
Net income (including non-controlling interests) MEUR 270.4
Employees (as of end of period; without apprentices) - 24,508

* MEUR = million euro


May l 2016

7 www.andritz.com
Company profile
Worldwide leading position in four business areas

30%* 35%* 25%* 10%*

Product offerings: Product offerings: Product offerings: presses Product offerings:


electromechanical equipment for production for metalforming equipment for solid/liquid
equipment for hydro-power of all types of pulp, paper, (Schuler); systems for separation
plants (turbines, tissue, and board; energy production of stainless for municipalities and
generators); pumps; boilers steel, carbon steel, and various industries;
turbo generators non-ferrous metal strip; equipment for production
industrial furnace plants of animal feed and
biomass pellets

Order Order Order Order


intake: Sales: intake: Sales: intake: Sales: intake: Sales:
1,7 1,835 2,2 2,196 1,4 1,718 597 628
19 MEUR 64 MEUR 39 MEUR MEU MEUR
R
Note: MEUR
figures above relate to the FY 2015 MEUR MEUR
* Average share of ANDRITZ GROUPs total order intake
May l 2016

8 www.andritz.com
ANDRITZ HYDRO
Facts and figures

ANDRITZ HYDRO
Cent
ral
Func
tion

Large Hydro Compact Hydro Service & Rehab Pumps Turbo Generator

ANDRITZ HYDRO FIGURES 2015


4.0
Unit 2015 00

1.8 1.7 3.00


Order intake MEUR 1,718.7 1.8
17 19 0
65
Order backlog MEUR 3,640.9 2.00
Sales MEUR 1,834.8 0

EBITA MEUR 145.3 2015 1.00


20
2013 14 0
Employees 8,230
(without apprentices) Order Sales 0
intake
Order
backlog
May l 2016

9 www.andritz.com
ANDRITZ HYDRO
Global presence

Prague

Peterborough
Ravensburg Vienna
Pointe-Claire Tiszakcske
Vancouver Kriens Linz Vevey
Chambly Weiz Faridabad
Spokane Paris
Charlotte Graz Bhopal Beijing
Hanoi Chengdu
Hangzhou
Morelia Yangon Foshan
Vientiane
Kuala Manila
Lumpur

Nlden Hammerfest Jakarta


Jevnaker Tampere
Glasgow Moscow
Kiev Christchurch
Grenoble Tblisi
Schio Melbourne
Porto Tehran
Bogota Caracas Madrid Ankara

Lima

Santiago
de Ararquara
Chile Campinas
Sao Paulo

Johannesburg ANDRITZ HYDRO location with manufacturing


ANDRITZ HYDRO location
May l 2016

10 www.andritz.com
ANDRITZ HYDRO
Global research and development

Global test facilities Highlights


14 hydraulic test rigs Turbine test facilities including all types:
5 generator laboratories High heads up to 2,000m

Pump laboratory Low head Bulb turbines

Pump turbines
Advanced numerical calculation
Generator test fields for:
methods Large rotating electrical machines

up to 850 MVA
Bearings

Electrical insulation
May l 2016

11 www.andritz.com
ANDRITZ HYDRO
Global manufacturing

Main Products Capacity


Hydro mechanical components In-house manufacturing capacity
Turbine components ~ 2,500,000 hours/year

Hydro and turbo generators On-site assembly capacity


Electrical components ~ 800,000 hours/year

Total manufacturing area


Locations
> 170,000 m2
Europe
Asia
North America, South America
May l 2016

12 www.andritz.com
ANDRITZ HYDRO
System and service scope of supply from water-to-wire

10
2

6
9
8
1Gates
2 Penstocks 7
5
3 Inlet valve
3
4 Turbine
5 Generator 4
6Automation, Control & Protection
7 Medium voltage switchgear
8Power transformer
9High voltage switchgear
10 Transmission line
May l 2016

13 www.andritz.com
Large hydropower plants
Large Hydro

Scope: Highlights:
Turnkey electro-mechanical package Market leader Pelton turbines
for hydropower plants 423 MW, 1,874 m 2 world records

New hydropower plants Bieudron / Switzerland


Large rehabilitations and upgrades Large Francis turbines
from water-to-wire (W2W) 770 MW Guri II / Venezuela

Project development Market leader Bulb turbines


76.55 MW St. Antonio / Brazil

Large hydro generators


840 MVA Three Gorges / China
May l 2016

14 www.andritz.com
Hydro-mechanical structures
Penstocks and Gates

Scope: Highlights:
Steel structures for hydropower Large gates:
plants, water supply and irrigation Pimental / Brazil

Exposed and embedded Large penstock


penstocks 13.26 m Tarbela Dam 3 / Pakistan
Pipe bridges and steel tunnel Large manifold
linings 16 m high Tarbela Dam 3 / Pakistan
Manifolds and bifurcations
High head
Gates and hydraulic steel 2,070 m Cleuson-Dixence /
constructions
Switzerland
May l 2016

15 www.andritz.com
Small and mini hydropower plants
Compact Hydro

Scope: Highlights:
Small hydropower plants Small hydro supplied to Turkey
(units up to 30 MW) More than 1,000 MW

Mini hydropower plants Large Compact Pelton turbine


(units from 20 kW up to 30.3 MW Renace II / Guatemala
5,000 kW)
Drinking and waste water turbines
from water-to-wire 200 kW Val Mila / Switzerland
(W2W)
6 MW Las Vacas / Guatemala
Modular system design
Pre-assembly at
Energy recovering turbine (mines)
3x 1.54 MW Saaiplaas / S-Africa
workshop

Each week two new Compact Hydro units start


May l 2016

working!
16 www.andritz.com
Modernization
Service & Rehabilitation

Scope: Highlights:
Solutions, products and services over Uprating
the entire life cycle of a hydropower + 40% - Ambuklao/Philippines
plant + 400 MW Guri II / Venezuela
General overhaul / rehabilitation Replanting and uprating
Uprating / upgrading / modernization (replacement of 12 units by 5 units)
Plant assessment + 20% (5x 17.3 MW)

Technical studies Lochaber / UK


Residual life analysis Rehabilitation of largest single phase
Risk assessment hydro generator
94 MVA, 34 t pole weight

Langenprozelten / Germany
May l 2016

17 www.andritz.com
Electrical power train
Electrical Power Systems

Scope: Highlights:
Solutions, products and services for Electrical system for pumped storage
complete range of electrical equipment 4x 300 MW Tong Bai / China

for hydropower plants Complete electrical equipment for


Plant and power engineering including 6x 130 MW Karahnjukar / Iceland
system and grid studies
Complete electrical equipment for
Integration of all systems 2x 55 MW Chacayes / Chile
(from water-to-wire)
Turnkey electrical equipment including
420 kV high-voltage substation
4x 130 MW Beles / Ethiopia
May l 2016

18 www.andritz.com
Secondary equipment
Automation

Scope: Highlights:
Complete automation solutions for Large excitation (field current 3,200 A)
All sizes of power plants 10x 850 MVA Guri II / Venezuela

Newly built power plants HIPASE Integrated platform for


Rehabilitation protection, excitation, turbine governor
Upgrading and modernization and synchronization
Integration of existing systems
Large dispatch center applications
Regional dispatch center

110 HPPs of EON Landshut /


Germany
Dispatch center for Norway

Statkraft / Norway
May l 2016

19 www.andritz.com
Pumps, motors and hydrodynamic screws
Pumps

Scope: Highlights:
Standard and customer-specific pumps: Very large flowrates
Water, waste water or sea water (e.g. water infrastructure in India and
China)
Cooling water pumps (power plants)
Highly abrasive applications
Offshore
Modular multistage concept with
Mining
highest efficiencies
Industry
Engineered multistage pumps
(pulp, paper, sugar, chemical or food)
up to 35 MW
Mini hydro power generation Pump storage operations
May l 2016

20 www.andritz.com
Gas and steam turbine generators
Turbo Generator

Scope: Highlights:
Turbo generators for gas and steam > 1,265 turbo generator units
turbines from 8 MVA up to 350 MVA > 137,000 MVA total output ever built
50 and 60 Hz Turbo generators for
Type Heavy duty gas turbines (HDGT)

Air-cooled Aeroderivative gas turbines


TEWAC (air-water-cooled)
Open ventilated
CACA (air-air-cooled)
Hydrogen-cooled
May l 2016

21 www.andritz.com
Hydropower market outlook
Low head applications for existing structures

Trends: Highlights:
Innovative solution for: Largest HYDROMATRIX plant
existing dams, gates, weirs, etc. 45x 534 KW Ashta I / Albania

greenfield projects 45x 1,003 kW Ashta II / Albania


Usage of ecological flow for additional Usage of abandoned shiplocks
power generation 5x 270 kW StrafloMatrixTM

Chievo / Italy
May l 2016

22 www.andritz.com
Hydropower market outlook
Develop ocean energy

Trends: Highlights:
Technology for power generation from World largest tidal power plant
tidal lift and tidal currents 10x 26 MW Sihwa / South Korea

Tidal lagoon (energy island)


Rehab of first tidal power plant
Tidal array 24x 10 MW La Rance / France

Tidal barrage
First commercial tidal current turbine
1x 1,000 kW (HS1000) EMEC / UK

First commercial array


3x 1,5 MW MeyGen / Scotland

New developments for tidal lagoons


May l 2016

23 www.andritz.com
Hydropower market outlook
Pumped storage power plants

Trends: Highlights:
Solution as battery of the grid First variable-speed pumped storage
from water-to-wire (W2W) plant in Europe
Fixed or variable-speed 4x 325 MW Goldisthal / Germany

Electrical grid compatibility (2x variable-speed units 340 MVA)


Grid code compliance
High speed pumped storage (750 rpm)
2x 240 MVA Reisseck II / Austria

Quick change (+540 / -540 MW in 20


sec)
3x 200 MVA Kops II / Austria
May l 2016

24 www.andritz.com
Quality

All operational Divisions and Subsidiaries are certified according


to the Standards ISO 9001, ISO 14001 and OHSAS 18001.

Q u a l i t y one can re ly on !
May l 2016

25 www.andritz.com
ANDRITZ HYDRO
Your partner for renewable and clean
energy
May l 2016

26 www.andritz.com

Potrebbero piacerti anche