King Khalid Medical City

Non Health Care - Electrical Systems


Gatehouses
Electrical Plant-Rooms and Substation
Gatehouse Wing 1

UPS Provided in
Telecom Room
(ELV Racks)

August 2012 Workshop 4 3/24/17 Page 3


Gatehouse Wing 2

UPS Provided in
Telecom Room
(ELV Racks)

August 2012 Workshop 4 3/24/17 Page 4


Hospice
Electrical Plant-Rooms and Substation
Hospice GF

UPS
Room

Electrical
Room

August 2012 Workshop 4 3/24/17 Page 6


Hospice L01

Generator
HV Switchgear Room
Battery Room

HV Switchgear LV
Room Switchgear
Room/
Transformer Central
Room Battery

August 2012 Workshop 4 3/24/17 Page 7


Hospice L01

August 2012 Workshop 4 3/24/17 Page 8


Hospice Metering
Strategy

Metering CTs at Main LV Panel


Can be read remotely via BMS

August 2012 Workshop 4 3/24/17 Page 9


Masjid
Electrical Plant-Rooms and Substation
Masjid GF
Electrical Room

August 2012 Workshop 4 3/24/17 Page 11


Masjid - Lighting

Page 12
Masjid Mezz

Electrical Room

August 2012 Workshop 4 3/24/17 Page 13


Masjid Metering
Strategy

Metering CTs at Main LV Panel


Can be read remotely via BMS

August 2012 Workshop 4 3/24/17 Page 14


Parking Structure
Electrical Plant-Rooms and Substation
Parking Electrical Cabinets
Required in Each Zone
Structure GF (Typical)
Normal Power
Parking Electrical Emergency Power
Plantroom

August 2012 Workshop 4 3/24/17 Page 16


Parking Structure L01
(level 2-6 are similar)

August 2012 Workshop 4 3/24/17 Page 17


Parking Structure

Major loads
Lighting
Ventilation fans Extract
Ventilation fans - Jets

August 2012 Workshop 4 3/24/17 Page 18


Parking Structure Load Schedule

August 2012 Workshop 4 3/24/17 Page 19


Parking Structure
Metering Strategy

August 2012 Workshop 4 3/24/17 Page 20


Central Utility Plant
Electrical Plant-Rooms and Substation
Design & Equipment Standards

SBC 401
NFPA 99
NFPA 101
IEC
ASHRAE/IESNA 90.1-2007
History

Power Systems- Interaction with Supply Authority

- The developer will be responsible for the installation and maintenance of their MEP
infrastructure on the consumers side of the Network.

- The interface point will be at the HV switch within the grid station. The 13.8kV cables will
be coordinated up to this point only.

- SEC advised that they would only be responsible for the design up to the grid station.

- Once the grid station is energized that the ownership will pass to SEC and no access will
be provided to KKMC.

- The design on the consumer side should incorporate switchgear in order to isolate part of
the network for maintenance or emergency purposes

- SEC advised that the cable distribution within the site will be owned and need to be
maintained by KKMC.
MV SCHEMATIC (Phase 1)
Intake Switching

No Access for KKMC staff


Intake Switching Equipment Room
Typical Section Detail
Generator (3.125 MVA) + EPDS

Generator Allocation:
16 no. Dedicated for Hospital
7 no. Dedicated for Chillers
2 no. 500 bed extension
2 no. Dedicated for Data Center
2 no. CUP Building
2 no. Spare or Back-up
Generator Room (3.125 MVA)
(3.125 MVA) Generator Room Section
EPDS ROOM
EPDS ROOM Typical Section
A.T.S (Automatic Transfer Switch)
ATS Equipment Room
MV SCHEMATIC (Phase 2)
C.U.P L.V Schematic
C.U.P L.V Substation
Thank you Any questions?