Outline

Global Company Profile:


McDonalds
The Strategic Importance of
Layout Decisions
Types of Layout
Office Layout

2008 Prentice Hall, Inc. 92


Outline Continued
Retail Layout
Servicescapes
Warehousing and Storage Layouts
Cross-Docking
Random Docking
Customizing
Fixed-Position Layout

2008 Prentice Hall, Inc. 93


Outline Continued

Process-Oriented Layout
Computer Software for Process-
Oriented Layouts
Work Cells
Requirements of Work Cells
Staffing and Balancing Work Cells
The Focused Work Center and the
Focused Factory

2008 Prentice Hall, Inc. 94


Outline Continued

Repetitive and Product-Oriented


Layout
Assembly-Line Balancing

2008 Prentice Hall, Inc. 95


Learning Objectives
When you complete this chapter you
should be able to:

1. Discuss important issues in office layout


2. Define the objectives of retail layout
3. Discuss modern warehouse management
and terms such as ASRS, cross-docking,
and random stocking
4. Identify when fixed-position layouts are
appropriate
2008 Prentice Hall, Inc. 96
Learning Objectives
When you complete this chapter, you
should be able to:

5. Explain how to achieve a good process-


oriented facility layout
6. Define work cell and the requirements of
a work cell
7. Define product-oriented layout
8. Explain how to balance production flow
in a repetitive or product-oriented facility
2008 Prentice Hall, Inc. 97
Innovations at McDonalds
Indoor seating (1950s)
Drive-through window (1970s)
Adding breakfast to the menu
(1980s)
Adding play areas (late 1980s)
Redesign of the kitchens (1990s)
Self-service kiosk (2004)
Now three separate dining sections
2008 Prentice Hall, Inc. 98
Innovations at McDonalds
Indoor seating (1950s)
Drive-through window (1970s)
Six out of the
Adding breakfast to the menu
seven are
(1980s) layout
Adding play areas (late 1980s)
decisions!
Redesign of the kitchens (1990s)
Self-service kiosk (2004)
Now three separate dining sections
2008 Prentice Hall, Inc. 99
McDonalds New Layout
Seventh major innovation
Redesigning all 30,000 outlets around
the world
Three separate dining areas
Linger zone with comfortable chairs and
Wi-Fi connections
Grab and go zone with tall counters
Flexible zone for kids and families
Facility layout is a source of
competitive advantage
2008 Prentice Hall, Inc. 9 10
Strategic Importance of
Layout Decisions

The objective of layout strategy


is to develop a cost-effective
layout that will meet a firms
competitive needs

2008 Prentice Hall, Inc. 9 11


Layout Design
Considerations
Higher utilization of space, equipment,
and people
Improved flow of information, materials,
or people
Improved employee morale and safer
working conditions
Improved customer/client interaction
Flexibility

2008 Prentice Hall, Inc. 9 12


Types of Layout
1. Office layout
2. Retail layout
3. Warehouse layout
4. Fixed-position layout
5. Process-oriented layout
6. Work-cell layout
7. Product-oriented layout
2008 Prentice Hall, Inc. 9 13
Types of Layout
1. Office layout: Positions workers,
their equipment, and spaces/offices
to provide for movement of
information
2. Retail layout: Allocates shelf space
and responds to customer behavior
3. Warehouse layout: Addresses trade-
offs between space and material
handling
2008 Prentice Hall, Inc. 9 14
Types of Layout
4. Fixed-position layout: Addresses
the layout requirements of large,
bulky projects such as ships and
buildings
5. Process-oriented layout: Deals with
low-volume, high-variety production
(also called job shop or intermittent
production)

2008 Prentice Hall, Inc. 9 15


Types of Layout
6. Work cell layout: Arranges
machinery and equipment to focus
on production of a single product or
group of related products
7. Product-oriented layout: Seeks the
best personnel and machine
utilizations in repetitive or
continuous production

2008 Prentice Hall, Inc. 9 16


Good Layouts Consider

1. Material handling equipment


2. Capacity and space requirements
3. Environment and aesthetics
4. Flows of information
5. Cost of moving between various
work areas

2008 Prentice Hall, Inc. 9 17


Layout Strategies
Warehouse
Office Retail (storage)
Examples
Allstate Insurance Krogers Federal-Moguls
Supermarket warehouse
Microsoft Corp.
Walgreens The Gaps
distribution center
Bloomingdales
Problems/Issues
Locate workers Expose customer Balance low-cost
requiring frequent to high-margin storage with low-
contact close to items cost material
one another handling

Table 9.1
2008 Prentice Hall, Inc. 9 18
Layout Strategies
Project Job Shop
(fixed position) (process oriented)
Examples
Ingall Ship Building Arnold Palmer Hospital
Corp.
Hard Rock Caf
Trump Plaza
Olive Garden
Pittsburgh Airport

Problems/Issues
Move material to the Manage varied material
limited storage areas flow for each product
around the site

Table 9.1
2008 Prentice Hall, Inc. 9 19
Layout Strategies
Work Cells Repetitive/ Continuous
(product families) (product oriented)
Examples
Hallmark Cards Sonys TV assembly
line
Wheeled Coach
Toyota Scion
Standard Aero
Problems/Issues
Identify a product Equalize the task time
family, build teams, at each workstation
cross train team
members

Table 9.1
2008 Prentice Hall, Inc. 9 20
Office Layout
Grouping of workers, their equipment,
and spaces to provide comfort,
safety, and movement of information
Movement of
information is main
distinction
Typically in state of
flux due to frequent
technological
changes
2008 Prentice Hall, Inc. 9 21
Relationship Chart

Figure 9.1

2008 Prentice Hall, Inc. 9 22


Supermarket Retail Layout

Objective is to maximize
profitability per square foot of
floor space
Sales and profitability vary
directly with customer exposure

2008 Prentice Hall, Inc. 9 23


Five Helpful Ideas for
Supermarket Layout
1. Locate high-draw items around the
periphery of the store
2. Use prominent locations for high-impulse
and high-margin items
3. Distribute power items to both sides of
an aisle and disperse them to increase
viewing of other items
4. Use end-aisle locations
5. Convey mission of store through careful
positioning of lead-off department
2008 Prentice Hall, Inc. 9 24
Store Layout

Figure 9.2

2008 Prentice Hall, Inc. 9 25


Retail Slotting
Manufacturers pay fees to retailers
to get the retailers to display (slot)
their product
Contributing factors
Limited shelf space
An increasing number of new
products
Better information about sales
through POS data collection
Closer control of inventory
2008 Prentice Hall, Inc. 9 26
Retail Store Shelf Space
Planogram
Computerized 5 facings
tool for shelf-

Shampoo

Shampoo

Shampoo

Shampoo

Shampoo
space
management
Generated from
stores scanner

Conditioner
Shampoo

Shampoo

Shampoo

Shampoo
data on sales Conditioner

Conditioner
Often supplied
by manufacturer
2 ft.
2008 Prentice Hall, Inc. 9 27
Servicescapes
Ambient conditions - background
characteristics such as lighting, sound,
smell, and temperature
Spatial layout and functionality - which
involve customer
circulation path planning,
aisle characteristics, and
product grouping
Signs, symbols, and
artifacts - characteristics
of building design that
carry social significance
2008 Prentice Hall, Inc. 9 28
Warehousing and Storage
Layouts
Objective is to optimize trade-offs
between handling costs and costs
associated with warehouse space
Maximize the total cube of the
warehouse utilize its full volume
while maintaining low material
handling costs

2008 Prentice Hall, Inc. 9 29


Warehousing and Storage
Layouts
Material Handling Costs
All costs associated with the transaction
Incoming transport
Storage
Finding and moving material
Outgoing transport
Equipment, people, material, supervision,
insurance, depreciation
Minimize damage and spoilage
2008 Prentice Hall, Inc. 9 30
Warehousing and Storage
Layouts
Warehouse density tends to vary
inversely with the number of different
items stored
Automated Storage and
Retrieval Systems (ASRSs)
can significantly improve
warehouse productivity by
an estimated 500%
Dock location is a key
design element
2008 Prentice Hall, Inc. 9 31
Cross-Docking
Materials are moved directly from
receiving to shipping and are not
placed in storage
in the warehouse
Requires tight
scheduling and
accurate shipments,
bar code or RFID
identification used for
advanced shipment
notification as materials
are unloaded
2008 Prentice Hall, Inc. 9 32
Random Stocking
Typically requires automatic identification
systems (AISs) and effective information
systems
Random assignment of stocking locations
allows more efficient use of space
Key tasks
1. Maintain list of open locations
2. Maintain accurate records
3. Sequence items to minimize travel, pick time
4. Combine picking orders
5. Assign classes of items to particular areas
2008 Prentice Hall, Inc. 9 33
Customizing
Value-added activities performed at
the warehouse
Enable low cost and rapid response
strategies
Assembly of components
Loading software
Repairs
Customized labeling and packaging

2008 Prentice Hall, Inc. 9 34


Warehouse Layout
Traditional Layout
Storage racks
Customization

Conveyor

Staging
Office
Shipping and receiving docks
2008 Prentice Hall, Inc. 9 35
Warehouse Layout
Cross-Docking Layout

Shipping and receiving docks

Office
Shipping and receiving docks

2008 Prentice Hall, Inc. 9 36


Fixed-Position Layout
Product remains in one place
Workers and equipment come to site
Complicating factors
Limited space at site
Different materials
required at different
stages of the project
Volume of materials
needed is dynamic
2008 Prentice Hall, Inc. 9 37
Alternative Strategy
As much of the project as possible
is completed off-site in a product-
oriented facility
This can
significantly
improve efficiency
but is only
possible when
multiple similar
units need to be created
2008 Prentice Hall, Inc. 9 38
Process-Oriented Layout

Like machines and equipment are


grouped together
Flexible and capable of handling a
wide variety of products or
services
Scheduling can be difficult and
setup, material handling, and
labor costs can be high
2008 Prentice Hall, Inc. 9 39
Process-Oriented Layout
Patient A - broken leg
ER
triage Emergency room admissions
room
Surgery Patient B - erratic heart
pacemaker

Laboratories

Radiology ER Beds Pharmacy Billing/exit

Figure 9.3
2008 Prentice Hall, Inc. 9 40
Layout at Arnold Palmer Hospital

Pie-shaped
Central break rooms
and medical
supply rooms

Local linen Central nurses


supply station

Local
2008 Prentice Hall, Inc. nursing pod 9 41
Process-Oriented Layout

Arrange work centers so as to


minimize the costs of material
handling
Basic cost elements are
Number of loads (or people) moving
between centers
Distance loads (or people) move
between centers

2008 Prentice Hall, Inc. 9 42


Process-Oriented Layout
n n

Minimize cost = Xij Cij


i=1 j=1

where n = total number of work


centers or departments
i, j = individual
departments
Xij = number of loads
moved from department i to
department j
Cij = cost to move a load
2008 Prentice Hall, Inc.
between department i and 9 43
Process Layout Example
Arrange six departments in a factory to
minimize the material handling costs.
Each department is 20 x 20 feet and the
building is 60 feet long and 40 feet wide.
1. Construct a from-to matrix
2. Determine the space requirements
3. Develop an initial schematic diagram
4. Determine the cost of this layout
5. Try to improve the layout
6. Prepare a detailed plan
2008 Prentice Hall, Inc. 9 44
Process Layout Example
Number of loads per week
Department Assembly Painting Machine Receiving Shipping Testing
(1) (2) Shop (3) (4) (5) (6)

Assembly (1) 50 100 0 0 20

Painting (2) 30 50 10 0

Machine Shop (3) 20 0 100

Receiving (4) 50 0

Shipping (5) 0

Testing (6)

Figure 9.4

2008 Prentice Hall, Inc. 9 45


Process Layout Example
Area 1 Area 2 Area 3

Assembly Painting Machine Shop


Department Department Department
(1) (2) (3)

40

Receiving Shipping Testing


Department Department Department
(4) (5) (6)

Figure 9.5 Area 4 Area 5 Area 6


60
2008 Prentice Hall, Inc. 9 46
Process Layout Example
Interdepartmental Flow Graph
100

50 30
1 2 3
20 20
10
50 100

4 5 6
50
Figure 9.6
2008 Prentice Hall, Inc. 9 47
Process Layout Example
n n

Cost = Xij Cij


i=1 j=1

Cost = $50 + $200 + $40


(1 and 2) (1 and 3) (1 and 6)
+ $30 + $50 + $10
(2 and 3) (2 and 4) (2 and 5)
+ $40 + $100 + $50
(3 and 4) (3 and 6) (4 and 5)

= $570

2008 Prentice Hall, Inc. 9 48


Process Layout Example
Revised Interdepartmental Flow Graph
30

50 100
2 1 3

10
50 20 50 100

50
4 5 6

Figure 9.7
2008 Prentice Hall, Inc. 9 49
Process Layout Example
n n

Cost = Xij Cij


i=1 j=1

Cost = $50 + $100 + $20


(1 and 2) (1 and 3) (1 and 6)
+ $60 + $50 + $10
(2 and 3) (2 and 4) (2 and 5)
+ $40 + $100 + $50
(3 and 4) (3 and 6) (4 and 5)

= $480

2008 Prentice Hall, Inc. 9 50


Process Layout Example
Area 1 Area 2 Area 3

Painting Assembly Machine Shop


Department Department Department
(2) (1) (3)

40

Receiving Shipping Testing


Department Department Department
(4) (5) (6)

Figure 9.8 Area 4 Area 5 Area 6


60
2008 Prentice Hall, Inc. 9 51
Computer Software
Graphical approach only works for
small problems
Computer programs are available to
solve bigger problems
CRAFT
ALDEP
CORELAP
Factory Flow

2008 Prentice Hall, Inc. 9 52


CRAFT Example
PATTERN PATTERN
1 2 3 4 5 6 1 2 3 4 5 6

1 A A A A B B 1 D D D D B B

2 A A A A B B 2 D D D D B B

3 D D D D D D 3 D D D E E E

4 C C D D D D 4 C C D E E F

5 F F F F F D 5 A A A A A F

6 E E E E E D 6 A A A F F F

TOTAL COST 20,100 TOTAL COST 14,390


EST. COST REDUCTION .00 EST. COST REDUCTION 70.
ITERATION 0 ITERATION 3

(a) (b) Figure 9.9


2008 Prentice Hall, Inc. 9 53
Computer Software
Three dimensional visualization
software allows managers to view
possible layouts and assess process,
material
handling,
efficiency,
and safety
issues

2008 Prentice Hall, Inc. 9 54


Work Cells
Reorganizes people and machines
into groups to focus on single
products or product groups
Group technology identifies
products that have similar
characteristics for particular cells
Volume must justify cells
Cells can be reconfigured as
designs or volume changes
2008 Prentice Hall, Inc. 9 55
Advantages of Work Cells
1. Reduced work-in-process inventory
2. Less floor space required
3. Reduced raw material and finished
goods inventory
4. Reduced direct labor
5. Heightened sense of employee
participation
6. Increased use of equipment and
machinery
7. Reduced investment in machinery and
equipment
2008 Prentice Hall, Inc. 9 56
Improving Layouts Using
Work Cells

Current layout - workers in


small closed areas.
Cannot increase output
without a third worker and
third set of equipment. Improved layout - cross-trained
workers can assist each other.
May be able to add a third worker
as additional output is needed.

Figure 9.10 (a)

2008 Prentice Hall, Inc. 9 57


Improving Layouts Using
Work Cells

Current layout - straight


lines make it hard to balance Improved layout - in U
tasks because work may not shape, workers have better
be divided evenly access. Four cross-trained
workers were reduced.

U-shaped line may reduce employee movement


and space requirements while enhancing
communication, reducing the number of
Figure 9.10 (b)
workers, and facilitating inspection
2008 Prentice Hall, Inc. 9 58
Requirements of Work Cells

1. Identification of families of
products
2. A high level of training, flexibility
and empowerment of employees
3. Being self-contained, with its own
equipment and resources
4. Test (poka-yoke) at each station in
the cell
2008 Prentice Hall, Inc. 9 59
Staffing and Balancing Work
Cells
Determine the takt time
Total work time available
Takt time =
Units required

Determine the number


of operators required
Total operation time required
Workers required = Takt time

2008 Prentice Hall, Inc. 9 60


Staffing Work Cells Example
600 Mirrors per day required
Mirror production scheduled for 8 hours per day
From a work balance chart 60
total operation time 50
= 140 seconds

Standard time required


40

30

20

10

Assemble Paint Test Label Pack for


shipment
Operations
2008 Prentice Hall, Inc. 9 61
Staffing Work Cells Example
600 Mirrors per day required
Mirror production scheduled for 8 hours per day
From a work balance chart
total operation time
= 140 seconds

Takt time = (8 hrs x 60 mins) / 600 units


= .8 mins = 48 seconds

Total operation time required


Workers required = Takt time
= 140 / 48 = 2.91
2008 Prentice Hall, Inc. 9 62
Work Balance Charts
Used for evaluating operation
times in work cells
Can help identify bottleneck
operations
Flexible, cross-trained employees
can help address labor bottlenecks
Machine bottlenecks may require
other approaches

2008 Prentice Hall, Inc. 9 63


Focused Work Center and
Focused Factory
Focused Work Center
Identify a large family of similar products
that have a large and stable demand
Moves production from a general-purpose,
process-oriented facility to a large work cell
Focused Factory
A focused work cell in a separate facility
May be focused by product line, layout,
quality, new product introduction, flexibility,
or other requirements
2008 Prentice Hall, Inc. 9 64
Focused Work Center and
Focused Factory
Work Cell Focused Work Center Focused Factory

A work cell is a A focused work center is A focused factory is a


temporary product- a permanent product- permanent facility to
oriented arrangement oriented arrangement produce a product or
of machines and of machines and component in a
personnel in what is personnel in what is product-oriented
ordinarily a process- ordinarily a process- facility. Many focused
oriented facility. oriented facility. factories currently
being built were
originally part of a
process-oriented
facility.

Example: A job shop Example: Pipe bracket Example: A plant to


with machinery and manufacturing at a produce window
personnel rearranged shipyard. mechanism for
to produce 300 unique automobiles.
control panels.

2008 Prentice Hall, Inc.


Table 9.2 9 65
Repetitive and Product-
Oriented Layout
Organized around products or families of
similar high-volume, low-variety products
1. Volume is adequate for high equipment
utilization
2. Product demand is stable enough to justify high
investment in specialized equipment
3. Product is standardized or approaching a phase
of life cycle that justifies investment
4. Supplies of raw materials and components are
adequate and of uniform quality
2008 Prentice Hall, Inc. 9 66
Product-Oriented Layouts
Fabrication line
Builds components on a series of machines
Machine-paced
Require mechanical or engineering changes
to balance
Assembly line
Puts fabricated parts together at a series of
workstations
Paced by work tasks
Balanced by moving tasks
Both types of lines must be balanced so that the
time to perform the work at each station is the same
2008 Prentice Hall, Inc. 9 67
Product-Oriented Layouts
Advantages
1. Low variable cost per unit
2. Low material handling costs
3. Reduced work-in-process inventories
4. Easier training and supervision
5. Rapid throughput
Disadvantages
1. High volume is required
2. Work stoppage at any point ties up the
whole operation
3. Lack of flexibility in product or production
rates
2008 Prentice Hall, Inc. 9 68
McDonalds Assembly Line

Figure 9.12

2008 Prentice Hall, Inc. 9 69


Disassembly Lines
Disassembly is being considered in
new product designs
Green issues and recycling
standards are important consideration
Automotive
disassembly is
the 16th largest
industry in
the US
2008 Prentice Hall, Inc. 9 70
Assembly-Line Balancing
Objective is to minimize the imbalance
between machines or personnel while
meeting required output
Starts with the precedence
relationships
1. Determine cycle time
2. Calculate theoretical
minimum number of
workstations
3. Balance the line by
assigning specific
tasks to workstations
2008 Prentice Hall, Inc. 9 71
Wing Component Example
Performance Task Must Follow
Time Task Listed
Task (minutes) Below
A 10
B 11 A This means that
C 5 B tasks B and E
cannot be done
D 4 B until task A has
E 12 A been completed
F 3 C, D
G 7 F
H 11 E
I 3 G, H
Total time 66

2008 Prentice Hall, Inc. 9 72


Wing Component Example
Performance Task Must Follow
Time Task Listed
Task (minutes) Below
A 10
B 11 A
C 5 B
D 4 B
E 12 A
F 3 C, D 5

G 7 F 10 11
C
3 7
H 11 E
A B F G
I 3 G, H 4
3
Total time 66 12
D
11 I
E H

Figure 9.13
2008 Prentice Hall, Inc. 9 73
Wing Component Example
Performance Task Must Follow 480 available
Time Task Listed mins per day
Task (minutes) Below 40 units required
A 10
B 11 A
Production time
C 5 B available per day
D 4 Cycle
B time = Units required per day
E 12 A = 480 / 40
F 3 C, D 5
= 12 minutes per unit
G 7 F 10 11
C
3 7
n
H 11 E
A i Time
B for taskFi G
I 3 G, H
Minimum =1
4
3
number of = Cycle Dtime
Total time 66 workstations 12 11 I
= 66 / 12
E H
= 5.5 or 6 stations
Figure 9.13
2008 Prentice Hall, Inc. 9 74
WingLine-Balancing
Component Example
Heuristics

1. Longest task time Choose the available480 task


available
Performance Task Must Follow
with the longest task time
Time Task Listed mins per day
Task2. Most
(minutes)
following tasksBelow
Choose the available40 task
units required
A 10 with the largestCycle
number of= 12 mins
time
B 11 Afollowing tasksMinimum
C 5 B = 5.5 or 6
workstations
D 3. Ranked4 positional BChoose the available task for
weight which the sum of following
E 12 Atask times is the longest
F 3 C, D 5

G 4. Shortest 7 task time FChoose 10 the 11


C task
available 3 7
H 11 Ewith the shortest task time
A B F G
I 3 G, H 4
3
5. Least number
Totalfollowing
time 66 tasks of Choose the available task
D
with the least12number of 11 I
following tasks E H
Table 9.4
Figure 9.13
2008 Prentice Hall, Inc. 9 75
Wing Component Example
Performance Task Must Follow 480 available
Time Task Listed mins per day
Task (minutes) Below 40 units required
A 10 Cycle time = 12 mins
B 11 A Minimum = 5.5 or 6
Station 5
C 52 B workstations
D 4 C B
E 10 11
12 A 3 7
F A B
3 C, D F G
4 3
G 7 F
H 11 D E Station 3 I
I 3 12 G, H 11
Total Station 6
Stationtime 66
1 E H
Station Station
4 5 Figure 9.14

2008 Prentice Hall, Inc. 9 76


Wing Component Example
Performance Task Must Follow 480 available
Time Task Listed mins per day
Task (minutes) Below 40 units required
A 10 Cycle time = 12 mins
B 11 A Minimum = 5.5 or 6
C 5 B workstations
D 4 B
E 12 A
F 3 C, D
G 7 F Task times
Efficiency =
H (Actual number ofEworkstations) x (Largest cycle time)
11
I 3 minutes / (6 stations)
= 66 G, H x (12 minutes)
Total time 66
= 91.7%

2008 Prentice Hall, Inc. 9 77