Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Alignments
& Bridge Bearings
A project management
consultancy is a
professional consulting
firm with knowledge
and experience in the
specialized area of
assisting organizations
to improve their
practice of project,
program and or
portfolio management.
About the project
About the project
About the project
Railway Alignments:
Drawing
Alignments: Drawing
Components
3 4
2
Alignments :Curve
Design
Wheel Lubricator is provided on the tracks to prevent the wear and tear
of the rail, due to the friction between the wheel flanges and the inner
sides of the rails.
The friction at the contact area between the wheel flanges of railway
vehicles and the rails determine wheel and rail wear. Vehicle and track
maintenance intervals are strongly determined by this wear process
and dramatically influence the life-cycle cost of the total vehicle and
the track
To be provided for alignment between JNPT to Vaitarna
Should have at least 25 horizontal curves with degree greater than 2
or radius of curvature less than 875m.
If more than two such stretch exist then, the stretch with maximum
number of curves will be provided with the wheel lubricator
A stretch of 41.73 km was finally arrived at from curve no 11-46R to
11-94L.
Bridge Bearing