Performing a Human Task Analysis
Overview
Human Task Simulation is a tool you can use to create, validate, and simulate
activities for workers using the DPM planning and simulation infrastructure. The
activities that you can simulate are as follows:
Walking
Moving to a Posture
Picking
Placing
Climbing
These activities can be combined with DPM Assembly activities to analyze the
relationship between workers and other entities within the simulation. Doing so
allows you to test multiple alternatives for the work that actual humans must
accomplish in a specific manufacturing environment.
Copyright DASSAULT SYSTEMES 2002
Objectives
You will learn how to use the Human Task Analysis workbench tools
8 hours
2
Workbenches and Toolbars Used in this Module
Copyright DASSAULT
SYSTEMES 2002
Inst
Inst
..
6
Performing a Human Task Analysis
A
Creating a
Process
Activity
C B
Inserting
Creating a
Resources Into
Manikin Activity
the Workspace
Mechanical Design
Starting the Scenario
Task Catalog
D Creating a Trajectory
Creating a Line Track
Performing
Clash Detection 8 hours
Motion Analysis
Create a Clash Report
Calculating Energy Expenditure
4
Copyright DASSAULT
SYSTEMES 2002
Activity
Process
Creating a
Creating a
6 Performing a Human Task Analysis Process
Activity
Activity library these items are processes that have been created and save for use in other processes
PERT Chart this item allows you to create links between processes in graphical form
Assigning a Resource to the process this item allows you to assign necessary resources to processes
Saving the process this item allows you to save the process
Copyright DASSAULT
SYSTEMES 2002
1 Launch V5 Product.
To create a new process, from the Main menu, select File / New. You will see the New
3 dialog box. Select Process.
To insert resources, from the Main menu, select Insert / Insert Resource. You will see
Copyright DASSAULT
Following the same procedure, insert the Plant Floor into the scenario. You can adjust
6 the placement of the floor later.
Copyright DASSAULT
SYSTEMES 2002
Creating a
Process
6
Performing a Human Task Analysis Activity
After you have inserted the necessary resources, you need to create an activity library.
7 From the Main menu, select File / New. You will see the New dialog box.
8 Select ProcessLibrary and press OK. You will see the Derivation Viewer window.
Copyright DASSAULT
From the ProcLibCreation toolbar, click the Create New Activity Type button. You will
9 see the New Type dialog box.
10 In the Name field, type the name of the new activity type Walk Forward.
Create Walk Backward and Walk Sideways activities. When you are finished, save the
11 library in the Process Library folder and close the Derivation Viewer.
From the Activity Management toolbar, click the Insert Activity Library button then select
12 the word Process in the PPR tree. This loads a link between the project and the Process
Copyright DASSAULT
From the Activity Management toolbar, click the Insert Activity button. You will see
14 the Insert Activity dialog box.
For all subsequent activity additions, select Add as Successor in the Adding Procedure
16 field. Also, rather than selecting the word Process in the PPR tree, select the previous
activity instead.
SYSTEMES 2002
To view the activities in the PERT chart, from the Data Views toolbar, click the Open
19 PERT Chart button then click on the word Process in the PPR tree.
You will see the PERT chart window displaying the activities. You can move activities
20 around the chart as necessary. Make sure that the Stop.1 activity appears after the
last activity on the chart.
Your activities might already have links between them. To delete links, right-click the
21 link you wish to delete and select Delete.
Management toolbar.
SYSTEMES 2002
To create a walking forward activity (where the manikin actually moves), from the Worker
25 Activities toolbar, click the Creates a Walk Fwd Activity button.
Select the manikin you wish to move and then click the location in the 3D window to where
26 you want the manikin to walk. You will see the Start Point Position dialog box.
Copyright DASSAULT
Click the Snap to Plane button. The manikin will snap to the surface and the view will
27 change to a top-down angle. You will also see the Walk Options dialog box.
SYSTEMES 2002
Creating a
Process
6
Performing a Human Task Analysis Activity
Continue to create walking points for the manikin by left-clicking various points throughout
28 the 3D window. When youre finished, click Generate Postures (using the defaults listed).
To see the activity, expand the PPR tree beneath the manikin for which you created the
29 walking activity. You should find the new activity (HumanTask.1) within the Program node.
To assign a resource to the activity, from the Activity Management toolbar, click the
30 Assign a Resource button.
Copyright DASSAULT
SYSTEMES 2002
31 In the PPR tree, select manikin (manikin1) and the Walk Forward activity.
From the Task Tools toolbar, click the Set an Active Task for the Manikin Associated
32 with Activity button. You will see the Active Task dialog box.
Creating a
Process
6
Performing a Human Task Analysis Activity
You can view what you have created up to this point by clicking the Restore Initial State
34 button (from the Simulation toolbar) and running the simulation by clicking the Process
Simulation button.
Copyright DASSAULT
After the simulation completes, do NOT restore the initial state. From the Worker
35 Activities toolbar, click the Creates a Walk Bwd Activity.
SYSTEMES 2002
Select the manikin and the edge of the area in the 3D window, then create a walk pattern
36 similar to that shown.
Creating a
Process
6
Performing a Human Task Analysis Activity
Following the same procedures, assign the resource and set the active task for the
37 manikin associated with this new activity.
38 Run the simulation. When you are finished, do NOT restore the initial state.
39 From the Worker Activities toolbar, click the Creates a Side Step Activity.
40 Following the same procedures, create a Side Step activity similar to that shown.
Copyright DASSAULT
Following the same procedures, assign the resource and set the active task for the
42 manikin associated with this new activity.
B
Creating a
Manikin Activity
6 Performing a Human Task Analysis Creating a
Manikin Activity
Walk Activities
Loading Positions from Catalogs
Picking and Placing Objects
Creating an Auto Walk this kind of activity requires two posture positions
Creating a Swept Volume
Copyright DASSAULT
SYSTEMES 2002
2 Open the Scenario2.CATProcess file and save the initial state from the Simulation toolbar.
From the Worker Activities toolbar, click the Creates a Walk Fwd Activity button then click
3 the Manikin (Manikin2) in the PPR tree.
Move the cursor toward the desk with the engine until it becomes a plane with a
4 perpendicular line through it. At that point, place the plane along the bottom of the desk
so that it is parallel to the floor and click. You will see the Walk Options dialog box.
Copyright DASSAULT
SYSTEMES 2002
Check the PPR tree under the manikin for the new task HumanTask.1. Right-click this
6 new task, select Properties, and change the Label field to Walk.
Open the new task to view the various MoveToPostures. Double-click the last
7 MoveToPosture. You will see the MoveToPosture Activity dialog box.
Copyright DASSAULT
SYSTEMES 2002
Creating a
6
Performing a Human Task Analysis Manikin Activity
9 Click the Browse Another Catalog button. You will see the File Selection dialog box.
Copyright DASSAULT
SYSTEMES 2002
Back in the MoveToPosture dialog box, click the Modify Activity button. Click OK when
13 prompted, then Close.
Copyright DASSAULT
SYSTEMES 2002
Creating a
6
Performing a Human Task Analysis Manikin Activity
14 From the Worker Activities toolbar, click the Create MoveToPosture Activity button.
Click the manikin in the PPR tree to select. You will see the MoveToPosture Activity
15 dialog box.
Copyright DASSAULT
SYSTEMES 2002
Press the Create Activity button, then press Close. This creates another human task
16 under the Program node in the PPR tree.
Rename the task AutoWalk. Click anywhere within the 3D window to deactivate the
17 current task.
Creating a
6
Performing a Human Task Analysis Manikin Activity
Click the manikin2 in the PPR tree to select, then choose the Both option to pick up
20 the object with both hands.
SYSTEMES 2002
Select the object to be picked (in this case, Engine3.5) from the PPR tree. This will
21 create another human task.
Create another MoveToPosture. Select the first MoveToPosture in the AutoWalk task
25 rather than selecting the manikin.
SYSTEMES 2002
Creating a
6
Performing a Human Task Analysis Manikin Activity
26 From the Worker Activities toolbar, click the Creates a Auto Walk Activity button.
When prompted to select a manikin, select the first MoveToPosture created in the
27 AutoWalk task. You will see the Walk Options dialog box.
28 Select Current Positions from the drop-down list then press the Create AutoWalk button.
Copyright DASSAULT
To place the engine on the table, from the Worker Activities toolbar, click the Creates A
29 Place Activity button.
SYSTEMES 2002
From the Activity Management toolbar, click the Assign a Resource button and assign
30 the manikin to all of the activities.
Creating a
6
Performing a Human Task Analysis Manikin Activity
Select the right arm of the female manikin and click OK in the Swept Volume dialog box.
36 You will see the Swept Volume Record button.
Creating a
6
Performing a Human Task Analysis Manikin Activity
37 Click anywhere in the 3D window off any object to deselect any currently selected items.
Click on MoveToPosture8 and then click the Process Simulation button on the Simulation
38 toolbar.
When the simulation is finished, deactivate the Process Simulation button and click the
39 Swept Volume Record button.
If you want to preview the right arm swept volume, click the preview button and then click
40 the save button.
Save as Right Arm_Swept Volume in the
Copyright DASSAULT
Right-click Product.1 in the PPR tree and select Properties. Change the transparency
SYSTEMES 2002
In this scenario, you will insert the following resources into the workspace:
Floor
Stairs
Ladder
Copyright DASSAULT
SYSTEMES 2002
3 To create a floor, from the Main menu, select Start / AEC Plant / Plant Layout.
6 Click the cursor into the 3D area and move the cursor so that the origin is 0in, 0in, 0in.
7 To see the entire floor, from the View toolbar, click the Fit All In button.
Inserting
Resources Into
6
Performing a Human Task Analysis the Workspace
In the product tree, right-click the highest level name of the product (usually product#),
8 and select Properties.
On the Product tab, within the Product / Part Number area, type the new name of the
9 product, Layout Floor, and press OK.
In the product tree, right-click the Area1 object and select Properties. You will see the
10 Properties dialog box.
Select the Visualization tab, deactivate the
11 Show area name checkbox, and press Ok. The
Copyright DASSAULT
To load the Part Design workbench, from the Main menu, select Start / Mechanical Design
13 / Part Design. You will see the Part Name dialog box.
From the Sketcher toolbar, click the Sketcher button, then select xy plane from
15 the PPR tree.
Copyright DASSAULT
SYSTEMES 2002
Click one corner of the rectangle, then click another corner. Follow the following
19 diagram to complete the constraint.
Copyright DASSAULT
SYSTEMES 2002
22 Close the Part Design workbench by clicking the Exit Workbench button.
From the Sketch-Based Features toolbar, click the Pad button. You will see the
23 Pad Definition dialog box.
27 Select the Graphic tab and change the Fill Color to beige.
From the Main menu, select File / Save as and save the part as Design Floor.CATPart
28 in the Parts folder.
Copyright DASSAULT
SYSTEMES 2002
To create a product from the part you just saved, from the Main menu, select File /
29 New / Product and press OK.
31 Click on the word Product# and select Design Floor.CATPart in the Parts folder.
Inserting
Resources Into
6
Performing a Human Task Analysis the Workspace
32 Right-click Design Floor, select Properties, and change the name to Design Layout Floor.
33 Save the file as Designing Floor.CATProduct in the Resources folder, then close.
Copyright DASSAULT
SYSTEMES 2002
Inserting
Resources Into
6
Performing a Human Task Analysis the Workspace
35 From the Main menu, select Insert / Insert Resource, and select the floor that you created.
35 From the Main menu, select File / Save as, and save this file as Scenario3end.CATPRocess.
Expand the Process node in the PPR tree. In its current form, the processes are NOT in
36 the correct order.
Correct Order:
Start
Manikin walks to stairs
Manikin walks up stairs
Manikin walks along platform
Manikin walks down stairs
Female manikin walks to ladder
Copyright DASSAULT
From the Data Views toolbar, click the Open PERT chart button and change the processes
37 to their correct order. Make sure to select the word Process in the PPR tree.
Inserting
Resources Into
6
Performing a Human Task Analysis the Workspace
After you have rearranged the processes into their correct order, from the Activity
38 Management toolbar, click the Link the Selected Activities button and link the processes.
When you are finished, close the PERT chart window. This will automatically update
39 the process.
At this point, you should save the initial state of the simulation. From the Simulation
40 toolbar, click the Save Initial State button. You will see the Save Initial Condition
dialog box.
Copyright DASSAULT
SYSTEMES 2002
Note: Saving the initial state of a simulation also saves postural information.
When you are finished, close the PERT chart window. This will automatically update
39 the process.
Inserting
Resources Into
6
Performing a Human Task Analysis the Workspace
41 In the PPR tree, right-click the new human task and select Properties.
42 Change the name of the task to Walking to Stairs, and press OK.
Copyright DASSAULT
43 From the Activity Management toolbar, click the Assign a Resource button.
SYSTEMES 2002
From the Task Tools toolbar, click the Set an Active Task for the Manikin Associated
44 with Activity button and select the Walking to Stairs task as the active task.
Inserting
Resources Into
6
Performing a Human Task Analysis the Workspace
45 From the Worker Activities toolbar, click the Creates a Climb Stair Activity button.
Select the manikin from the PPR tree. When prompted to select the first stair edge,
46 click on the edge of the first step.
When prompted to select the second stair edge,
47 click on the edge of the second step. You will see
the Stair Climbing Options dialog box.
Press Ok to continue.
SYSTEMES 2002
In the No. of Steps field of the Stair Climbing Options dialog box, change the value to 6,
48 and press the Generate Posture button.
49 In the PPR tree, right-click the new HumanTask and select Properties.
50 Change the name of the task to Climbing Stairs and press OK.
Assign the resource (the manikin) to the activity (Climbing Stairs) and make the activity
51 the active task.
Inserting
Resources Into
6
Performing a Human Task Analysis the Workspace
End the walking distance so that the manikins feet are close to the edge of the step.
54 Click the Generate Postures button in the Walk Options dialog box.
57 From the Worker Activities toolbar, click the Creates a Climb Stair Activity button.
Inserting
Resources Into
6
Performing a Human Task Analysis the Workspace
58 Select the first step down when prompted. Do the same for the second step.
In the PPR tree, right-click the new HumanTask and select Properties. Change the name
59 of the new task to Climbing Down Stairs and press OK.
When you are finished, assign the resource (the manikin) to the Climbing Down Stairs
60 activity, and make Climbing Down Stairs the active task.
Create a walk activity for the female manikin such that she is standing in front of the
Copyright DASSAULT
When you are finished, assign the resource (the manikin) to the Walking to Ladder
SYSTEMES 2002
From the Worker Activities toolbar, click the Create MoveToPosture Activity button and
64 rename the new HumanTask to Climbing Up Ladder.
Copyright DASSAULT
SYSTEMES 2002
From the Worker Activities toolbar, click the down-arrow and select the Creates a Climb
65 Ladder Activity button.
Inserting
Resources Into
6
Performing a Human Task Analysis the Workspace
When prompted for the first edge, select the first rung of the ladder; when prompted
67 for the second edge, select the second rung of the ladder. You will see the Ladder
Climbing Options dialog box.
When you are finished, assign this walk activity to Manikin Climbs Ladder, and set the
69 active task to Climbing the Ladder.
70 When you are finished, restore the initial state and run the simulation.
Copyright DASSAULT
SYSTEMES 2002
Inserting
Resources Into
6
Performing a Human Task Analysis the Workspace
Click the Open button in the Catalog Browser dialog box and select Human Tasks.catalog
72 from the Catalog folder.
Copyright DASSAULT
SYSTEMES 2002
Inserting
Resources Into
6
Performing a Human Task Analysis the Workspace
73 Double-click Station 2.
In the PPR tree, select the Walking to Stairs human task (located within the Female
74 Manikin.1 node). You will see the Description Reference dialog box.
Copyright DASSAULT
SYSTEMES 2002
Select the Refer Current Process checkbox so that the catalog will point to the current
75 process. You will see the Description Name dialog box.
Creating an Operate
Creating a Trajectory
Copyright DASSAULT
Creating an Operate
Creating a trajectory
Creating a collision
Creating a walking manikin for energy expenditure
Copyright DASSAULT
SYSTEMES 2002
Reach the air filter (Left hand) and create a constraint the air filter.
4 Create a Move To Posture
6 Activated the standard pose function and select the hand grasp tab.
If you are not satisfied with the final result, use the compass to
9 readjust the hand position and launch the auto grasp again.
Copyright DASSAULT
SYSTEMES 2002
You can click on the type of grasp to reset the posture prior to auto grasp again or
10 simply re-grasp from the current position
Performing
6
Performing a Human Task Analysis Motion Analysis
Once satisfied for the grasp posture, create a Mote to posture activity
11 ( make sure the constraint is still activated
Delete or deactivate the constraint for the left hand, Right the air filter with the right hand
17 and create a constraint
SYSTEMES 2002
Select the operates standing function and select the previous operates
18 following shot and the specific shot you .
Select the starting shot that correspond to the following the last shot of the previous operates
18 In this case the next operates will start at shot 6 to the end
Performing
6
Performing a Human Task Analysis Motion Analysis
Once the operates are created you can explore the following scenario
20 without any change of the human activity:
Modify the move activity (better to maintain the same number of shot
Reverse the move activity
Change the anthropometry of the manikin
Copyright DASSAULT
To view the clash, from the Simulation Analysis Tools, click the Analysis Mode On/Off
3 button to turn it on, then click the Analysis Configuration button. You will see the
Analysis Configuration dialog box.
Run the simulation. When you are finished, close the file and open the file
5 Scenario4.CATProcess.
Performing
6
Performing a Human Task Analysis Motion Analysis
To create a move activity, load the Digital Process for manufacturing / DPM Assembly
7 Process Simulation workbench.
From the Simulation Activity Creation toolbar, click the Create a Move Activity button.
8 Then select the Manikin Pushing Cart.1 activity in the PPR tree. You will see the Activity
Creation Options dialog box.
Copyright DASSAULT
In the Edit Shuttle dialog box, click into the selection field to highlight it, Then, in the
10 PPR tree, click on the Cart (Cart.1) object. Press OK. You will see several toolbars appear.
To create a track, click on the compass line on the cart and drag the compass in a straight
11 line forward, away from the manikin.
12 From the Recorder toolbar, click the Record button to record the position of the cart.
Copyright DASSAULT
SYSTEMES 2002
From the Worker Activities toolbar, click the Creates a Track Trajectory Activity button.
15 You will see the Track Trajectory dialog box.
From the PPR tree, select the manikin (manikin Seven a). For the move activity, you
16 will use the activity just created.
Set options on both tabs of the Track Trajectory dialog box as follows (but do NOT
17 press the Generate Postures button yet):
Copyright DASSAULT
SYSTEMES 2002
To set the Walk Plane, click into the 3D geometry window. Press the
18 Generate Postures button, and press Yes when prompted to continue
generating postures.
Performing
6
Performing a Human Task Analysis Motion Analysis
From the Activity Management toolbar, click the Assign a Resource button to assign
19 the manikin to the activity.
From the Task Tools toolbar, click the Set an Active Task for the Manikin Associated
20 with Activity button.
21 Select the HumanTask.1 in the PPR tree. You will see the Active Task dialog box. Press OK.
To view the trajectory, restore the initial state then run the simulation. When you are
Copyright DASSAULT
NOTE: You can generate analysis reports after running the simulation to identify problematic
situations.
Performing
6
Performing a Human Task Analysis Motion Analysis
1 From the Manikin Tools toolbar, click the load Manikins attributes from a Catalog button.
From the Catalog folder, open the file Token.catalog. You will see the Load Catalog
2 dialog box.
Copyright DASSAULT
In the PPR tree, click the manikin and select the Posn 1 Green posture from the dialog
3 box. Click Apply and the Close.
SYSTEMES 2002
After the manikin moves to the posture, save the initial state so that the current manikin
4 position becomes the first position in the simulation.
Load the DPM Assembly workbench (or return to it if it is already open) and from the
5 Simulation Activity Creation toolbar, click the Create a Move Activity button.
Performing
6
Performing a Human Task Analysis Motion Analysis
When prompted to select the reference activity, click the word Process in the PPR tree.
6 The motion activity should appear in the process. You will see the Edit Shuttle dialog box.
In the PPR tree, select Tokens and press OK. You will see the Track dialog box with
7 the name of the first selected product in the Name field. The compass is attached to
the selected item.
Using the compass, move the tokens
Copyright DASSAULT
From the Manikin Tools toolbar, click the Open Vision Window button and select the
11 manikin. You will see the vision window.
12 From the Manikin Constraints toolbar, click the Fix on Constraint button.
Copyright DASSAULT
13 Click the right hand of the manikin and then click on the green token.
SYSTEMES 2002
From the Worker Activities toolbar, click the Create MoveToPosture Activity button.
15 You will see the MoveToPosture Activity dialog box.
16 Click the manikin and then click the Create Activity button.
17 Right-click the HumanTask beneath the manikin and change the name to Line Tracking.
Copyright DASSAULT
18 Select the green token and using the compass, move the token up and off the peg.
SYSTEMES 2002
In the MoveToPosture Activity dialog box, click the Create Activity button to create
20 the second position.
From the Manikin Constraints toolbar, click the Updates All Constraints and Manikin
22 Representations button. This will place the manikins hand on the green token.
23 Click the Create Activity button to create the third MoveToPosture position.
Copyright DASSAULT
SYSTEMES 2002
26 In the PPR tree, within the settings node of the manikin, expand the Constraints node.
27 Double-click Constraint1. You will see the Constraint Properties dialog box.
Copyright DASSAULT
Constraint2.
33 From the Manikin Constraints toolbar, click the Fix on Constraints button.
34 Select the manikins right hand and then select the yellow token.
Copyright DASSAULT
SYSTEMES 2002
35 Following the same procedure, constrain the manikins left hand to the yellow token.
From the Manikin Constraints toolbar, click the Updates all Constraints and Manikin
37 Representations. This moves the hands up to the token.
From the Manikin Constraints toolbar, click the Updates all Constraints and Manikin
40 Representations. This moves the hands up to the token.
Copyright DASSAULT
Move the yellow token down onto the peg and update the manikins constraints. Then,
42 create the ninth MoveToPosture activity (using the Create Activity button).
These constraints should be deactivated to perform the next steps. Double-click the
43 constraints in the PPR tree and deactivate them.
Performing
6
Performing a Human Task Analysis Motion Analysis
From the Worker Activities toolbar, click the Creates a Pick Activity button, then click
46 the word Start with the Line Tracking node in the PPR tree.
From the Pick Options dialog box, use the current options to create a pick activity for the
47 green token.
Copyright DASSAULT
SYSTEMES 2002
49 Following the same procedure, create a pick and place activity for the yellow token.
51 Click the word Tokens in the PPR tree. You will see the Walk Type dialog box.
Copyright DASSAULT
SYSTEMES 2002
The completed Line Tracking tree should look similar to the following:
57 When you are finished, restore the initial state and run the simulation.
Performing
6
Performing a Human Task Analysis Motion Analysis
From the Worker Activities toolbar, click the Create a Walk Activity button, and create a
1 walk activity for manikin 6a so that the manikin walks through the cart.
After you have generated the postures, expand the manikin node in the PPR tree,
2 right-click on the humantask, and change the name to Walk Through Cart.
From the Simulation Analysis Tools toolbar, click the Clash button. You will see the
4 Check Clash dialog box.
Performing
6
Performing a Human Task Analysis Motion Analysis
5
SYSTEMES 2002
Click the cursor inside the Selection 1 field to highlight it, then select Manikin (Manikin6a)
6 from the PPR tree.
Click the cursor inside the Selection 2 field to highlight it, then select the cart from the
7 PPR tree.
8 Click the Apply button. You will see the Check Clash dialog box.
11 From the Available field, select Interference.1 and move it into the Selected field.
12 In the Analysis Level field, select Interrupt (to stop the simulation when clash occurs).
14 Run the simulation. It should stop once the manikin makes contact with the cart.
SYSTEMES 2002
In the PPR tree, double-click Interference.1 within the Applications node. You will see
15 the Check Clash dialog box.
Performing
6
Performing a Human Task Analysis Motion Analysis
16 Click the Apply button to update the data. The clash between manikin and cart will appear.
Copyright DASSAULT
SYSTEMES 2002
17 Double click the information line (the clash listing) to display the clash in a preview box.
Performing
6
Performing a Human Task Analysis Motion Analysis
From the Check Clash dialog box, click the Export As button. If no path has been set for
1 the data, you will see a warning message.
2 Using the default name, save the data in the HTS Process directory.
Copyright DASSAULT
You can display the report by browsing to the folder using Explorer or by searching
SYSTEMES 2002
Prior to calculating energy expenditure, you should update cycle times by clicking the
1 Update Cycle time button from the Simulation Toolbar.
From the Manikin Tools toolbar, click the Single Task Energy Expenditure Calculation
2 button. You will see the Energy Expenditure Automatic Configuration dialog box.
Copyright DASSAULT
SYSTEMES 2002
When prompted to select a human task, select Pushing the cart from the PPR tree. You
3 will see the Energy Expenditure Results dialog box.
Performing
6
Performing a Human Task Analysis Motion Analysis
Module Summary
In this module you learned how to use the Human Task Analysis workbench
to analyze the relationship between workers and other entities within the
simulation.
Course Wrap-Up
Throughout this course you have learned how to use the various workbenches of the
Copyright DASSAULT SYSTEMES 2002
Human Solutions product to fully analyze and optimize human performance under a
variety of environmental and working conditions.
83