INDEX
1.- Introduction
Categories of total capital cost estimates
Cost estimation method of Guthrie
2.- Short cuts procedures for equipment sizing
Vessel (flash drums, storage tanks, decanters and some reactors)
Reactors
Heat transfer equipment (heat exchangers, furnaces and direct fired
heaters)
Distillation columns
Absorbers columns
Compressors (or turbines)
Pumps
Refrigeration
3.- Cost estimation of equipment
Base costs for equipment units
Guthries modular method
4.- Further Reading and References
PRACTICAL CHAPTER
1.- INTRODUCTION
Process Alternatives Synthesis (candidate flowsheet)
Analysis (Preliminary mass and energy balances)
SIZING (Sizes and capacities)
COST ESTIMATION (Capital and operation)
Economic Analysis (economic criteria)
SIZING
Calculation of all physical attributes that allow a unique costing of this unit
- Capacity, Height
- Cross sectional area
- Pressure rating
Materials of construction
PRELIMINARY
BASED ON
Method of Hill, 1956. Production rate
and PFD with compressors, reactors
and separation equipments. Based
on similar plants.
Overall Factor Method of Lang, 1947.
Mass & energy balance and
equipment sizing.
Individual Factors Method of Guthrie,
1969, 1974. Mass & energy balance,
equipment sizing, construction
materials and P&ID. Enough data to
budget estimation.
USED TO
40 - 50
Very fast
Profitability
analysis
25 - 40
Fast
Preliminary
design
15 - 25
Medium
Budget
approval
DEFINITIVE
10 -15
Slow
Construction
control
DETAILED
Detailed Engineering
5 -10
Very slow
Turnkey
contract
C = BC =Co (S/So)
EQUIPMENT
MPF
Pressure Vessels
Fm . Fp
Heat Exchangers
Fm (Fp + Fd)
Fm + Fp + Fd
Centrifugal pumps
Compressors
Fm . Fo
Fd
To obtain the COST (C) of the equipment Need S (Sizing) and MPF
(Operation Conditions) required the flowsheet mass and energy
balance (Flow, T, P, Q)
6
Pressure
Factor
Fp
Cp ($)
Fp
UF = CIActual / CI1982
P (bar)
Factor de
Materiales y
Presin (MPF)
MPF
Fd
A (m2)
Design Factor
Material Factor
Fd
Fm
Fp*Fm