Sei sulla pagina 1di 36

Answers for infrastructure.

ERCOT RARF Workshop


Siemens PTI Procedures
Alicia Dortch
Nelson J Bacalao
Siemens PTI Houston Office

August 2013

2012 Siemens Industry, Inc. All rights reserved.

Agenda

Introduction
Identification and tracking of missing data
Collection of values for missing data
Derivation of data still missing

Page 2

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

Introduction
Siemens PTI was contracted by ERCOT to assist with the collection,
analysis, and production of data in completion of the Resource Asset
Registration Forms.
In this presentation we will go over the procedures proposed by
Siemens PTI to aid ERCOT in the completion of RARF missing data.
This is ongoing work and some of these procedures, in particular
those for estimation of parameters may be fine-tuned as we finish the
project.

Page 3

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

Data Identification and Tracking


Siemens PTI developed a data tracking sheet to record, categorize
and organize the missing data needed for short circuit, dynamics, and
steady state simulation models.

This sheet was populated from a query of RARF data in the ERCOT
HUB. It assists with communicating all missing or suspect data to the
Resource Entities using a single document outside of the multiple
document RARF forms.
The next slide provides a view of this spreadsheet.

Page 4

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

Data Identification and Tracking


Tracking Spreadsheet.

Page 5

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

Data Identification and Tracking


Tracking Spreadsheet.

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

Data Identification and Tracking


Explanation Tracking Sheet:
Columns A E: Uniquely identify the unit of discussion
Columns F I: Specifies which portion of the dynamics data is of concern (i.e.
exciter, generator, governor, stabilizer) since this is currently not included as
actual fields of the RARF 5.1 version
Columns J M: Refer to the original RARF missing data file. This links the
tracking information back to the original RARF data file of discussion.
Columns N P: Denotes communication between ERCOT and Siemens PTI to
help with Siemens review and discussion with Resource Entities (REs.)
Column Q: Simply denotes the original value of the data point. It will be null or
blank if referring to missing data and will have a number if referring to Suspect
data (identified in ERCOT audit checks as outside of an expected value).
Column R T: Directly relate to column Q. Provides more detail comments on
any identified suspect data along with the commenter and comment date.

Page 7

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

Collection of Values for Missing Data

The process to resolve the missing data:


1. Initial Resource Entity RE call:
1. ERCOT introduces the RE to the tracking sheet and Siemens PTI.
2. Tracking sheet reviewed and missing data points explained,
3. Provide suggestions for acquiring data in house & set plan for
resolving any remaining missing data items.

Follow-up with RE

Contact TSP

Page 8

The TSP is used as a data source calling on their experience from


case builds , interconnection studies or test reports/data sheets.

The TSP is contacted in situations when the RE is unable to produce


the required RARF data.
Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

Collection of Values for Missing Data


4. PTI Estimation
Siemens PTI provides a procedure for selecting typical parameters
when the RE or the associated TSP cannot or have not yet provided
the information required for the RARF.
Siemens PTI methodology proposed is expected to produce
reasonable parameters, but the actual equipment on site may be
unique and its parameters deviate, possibly significantly, from this
typical data.
Therefore typical data should be highlighted as such and replaced by
actual data when it becomes available.
In the balance of this presentation we will discuss Siemens PTI
methodology.

Page 9

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation

Procedures will be presented to cover the following areas that


were identified as the most frequently lacking:
Information to represent three winding transformers with buried
tertiary.
Typical parameters for Wind Turbine Generators (WTG.)
Methodology to estimate grounding impedance of generators.
Methodology to estimate saturated impedances when unsaturated
data is available as well as the machines saturation curve.
Methodology to find peers for units that can be used to estimate
the data for plants whose information is lacking.

Page 10

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation 3 winding transformers

Overview
WTG plants sometimes use a three winding transformer with Y grounded
on the high (H) and medium (X) sides and have a delta connected tertiary
(Y).
The tertiary role is just to control harmonics and there are no external
connections to it. Its rating is generally known .
The positive impedance primary to secondary are also usually known
(X+H-X).
From tests it is possible to determine the zero sequence impedance
primary to tertiary (Z0H-Y), primary to secondary (X0H-X) and secondary to
tertiary (X0X-Y).
The corresponding positive impedances to the tertiary cannot be
determined from tests, as there is no access to the tertiary.
Tests need to be carried out for a number of units and this will take time.
Page 11

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation 3 winding transformers

Overview (cond)
Based on a large population of over 100 three winding transformers with
34.5 kV class secondary, 115 or 138 kV primary (345 kV limited) and a
tertiary, we developed a procedure by which the corresponding
impedances primary to tertiary and secondary to tertiary can be
estimated given the positive impedance primary to secondary (XH-X).

With this method,

Page 12

The two winding equivalents can be determined, when the tests above
are available.

The data for three winding models in PSSE can be produced.

It can also be used to estimate missing parameters, while the tests are
yet to be carried out.

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation 3 winding transformers


Estimation of Impedances
Various methods for estimation were investigated and the least
volatile was found to be making the estimation based on the following
ratios, where the equations correspond to the trend line
approximation (see next):

Thus given the impedance high to medium XH-X and the tertiary MVA
rating the impedance medium to tertiary XX-Y can be estimated from
Ratio 1.
Once this value is known then the impedance high to tertiary XH-Y can
be estimated from Ratio 3:
Page 13

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation
Ratio 1

Page 14

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation
Ratio 3

Page 15

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation
Ratio 2 (Not Used)

Page 16

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation 3 winding transformers


Estimation of Impedances
With this procedure all the positive sequence impedance between
windings can be obtained and based on them the equivalent
impedances of the three winding transformer model can be
determined using the following equations:

Page 17

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation 3 winding transformers


Estimation of zero sequence impedances
In the cases that the tests have not yet been carried out and the
zero sequence impedances are unknown, we have two cases;
1. If the zero sequence primary to secondary is known, calculate the ratio
of this impedance to the corresponding positive impedance and use the
ratio to estimate the corresponding zero sequence impedances primary
to tertiary and secondary to tertiary.

Note that this is an approximation as the ratios are not


necessarily the same.

2. If no zero sequence is known, then while the tests are to be conducted


a conservative ratio of 80% of the positive impedance could be used.

Page 18

Note that as shown in the next figure, it is expected that this ratio
in the actual transformer will be greater, thus the zero sequence is
likely to be larger and the short circuits lower.

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

Ratio Zero to Positive sequence vs population of


transformers

Page 19

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation 3 winding transformers


Examples
We show some examples below that illustrate the level of error to be
expected with this method
As can be observed the values are not accurate (it was never expected),
but are in the order of magnitude and allow the representation of the path
to ground in the zero sequence.

Case 1

Page 20

Dec 15, 2016

Case 2

Case 3

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Wind Turbine Generators

Overview
For wind turbine generators the typical parameters depend primarily on
the generator type (I to IV) and manufacturer.
Typical parameters are provided:
For Type 1 and 2 the impedance correspond to the impedance of the machine
seen from the stator at an estimated rated slip.
For Type 3 and 4 the values provided correspond to an approximate
equivalent impedance that reproduces the contribution to a remote short
circuit.
For short circuit we provide for Type 1 and Type 2 an impedance value (X)
that can be used to estimate initial contribution to the short circuit.
We also provide the decay using the rotor time constant ( X/[377*R rotor] )
This same value X can be used as an approximation for the negative
sequence impedance.

Page 21

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Wind Turbine Generators


Overview
Typical parameters are provided (cont.):
For Type 3, if there is crow-bar operation, the control are by-passed and
the machine behaves like asynchronous generator. We provide similar
parameters to those for the Type 1 and Type 2.
For Type 4 machines and Type 3, if the controls operate, we provide
typical values for just after the short circuit and various cycles afterward.
Finally the zero sequence impedance of a Type 1, Type 2 and Type 3 with
crow-bar operation is approximately equal to the stator leakage.
Type 4 and Type 3 with controls in place oppose the zero sequence and
present fairly high impedance, we approximate it with a value of 50.
WTG are normally not grounded.

The following table provides the typical information for WTG that can
be used to estimate missing data.
Page 22

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

WTG Typical Data

Page 23

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Wind Turbine Generators


Recommended procedure to estimate WTG missing data using Table above:
1. First determine the turbine type for which data is missing, its manufactures
and size.
2. Check if there is a similar turbine in the system with a valid RARF that can
be used as a guide (Reference RARF.)
3. With the type, size and manufactures, enter in Table and find the closest
machine. If a similar turbine was found in the step above, then the
parameters should be close and can be incorporated in the RARF to be
sent to the RE for validation.
4. If there is disagreement between these sources, an assessment of the
applicability of Table to the particular turbines should be made and if valid
then Reference RARF should be reviewed to identify special conditions.
5. If no similar machine exist in the system, then use the closes machines
parameters in Table as a temporary value(s)
6. Finally the estimated parameter should be replaced from actual data as
soon as it becomes available.

Page 24

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Generator Grounding Resistance

Overview
Synchronous machines are not designed to withstand single line to
ground currents hence they are connected to the system with Delta-Y
GSU transformer with delta on the generator size and their neutral is
grounded through a very high resistance.
The value of the resistance should be represented on pu of a 100
MVA basis (system basis), however in some occasions the
information is in generator drawings with values in ohms connected to
the generator neutral via a transformer and it is not clear how to
produce the required value in pu.
We discuss two cases; a) drawings are available with the values in
ohms and b) no grounding information is available.
Page 25

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Generator Grounding Resistance


Drawings are available
The following information is available
Rg0 = Resistance in ohms connected to the LV side of the neutral transformer.
VH = Nominal high voltage of the neutral transformer.
VL = Nominal low voltage of the neutral transformer; where the resistance is
connected.
VM = Nominal generator voltage.

The resistance referred to the generators neutral Rg1 is given by:

and to be used in the zero sequence model is multiplied by 3, so:


Using this last resistance we estimate the single line to ground short circuit
current as follows (ignore reactance's) :

Page 26

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Generator Grounding Resistance


Drawings are available: Example of Application
The table below shows the results of the application of the procedure above
to three generators:
Here we note that the neutral current is in the order of a few amperes.

Page 27

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Generator Grounding Resistance


Drawings not available
If the drawings are not yet available, we can make the assumption
that the current has to be limited to a value in the order of a few
amperes,
Based on the example above, we propose using maximum neutral
current of 10 Amps
The following formula can be used to estimate the grounding
resistance in pu, where the MVA base defines whether it is on the
generator or system base.

Page 28

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Saturated Impedance

Overview
The RARF requires both saturated and unsaturated values. In general the
unsaturated values are available as these values are the ones employed in
stability evaluations as the saturation is modeled explicitly, but saturated values
may be missing. The saturation is non linear and its effect on the impedances
is heavily a function of the machines design and its operating point.
Particularly during transients this effect becomes more complicated due
current displacements (i.e. unidirectional currents) in the machine.
When available the machines manufacturer provides the saturated values
obtained from detailed models of the machines and assumptions with respect
of its operating conditions.
To take advantage of as much information as possible and approximate the
procedure used by the machines manufacturer, we propose using the classical
equations of the synchronous machine to obtain an estimation of the saturated
values.

Page 29

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Saturated Impedance


Procedure
The following equations and equivalent circuits provide a relation between the
machines impedance Xd, Xd and Xd and the magnetizing impedance Xad,

Eq 1

Eq 2

Eq 3

Page 30

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Saturated Impedance

Procedure
First Xad, Xfl and XDl are determined using the following equations:

Next the saturated values Xad must be obtained, which are derived from the
formula:

Where S is the saturation factor and normally S(1) and S(1.2) are known

Page 31

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Saturated Impedance

Procedure (cont)
For other values of S(V) we use the equation:

The coefficients A and B are determined using S(1) and S(1.2) and that the machine at
0.9 pu should have little or no saturation.

For steady state S(1) is proposed.


For the transient period S(1) gives incorrect results, as the saturation
conditions are very different and tests with the model identified that a value of
S(2) gives reasonable approximations.
Finally with Xad-s and Eq 1 Xdv is found, Eq 2 gives Xdv and Eq 3 gives Xdv.
The next slide shows results for 4 generators.

Page 32

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Saturated Impedance


Tests

Page 33

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Peer Identification

Overview
For all remaining missing data, PTI is compiling a list of typical data
from similar non-wind unit types (i.e. CCP, coal fired, etc.) in the
ERCOT territory with known data and of similar type and output. If
there is nothing similar in the ERCOT system, we will then use a
listing of generators in the Eastern Interconnect as a data source for
typical values.
Machine parameters are largely based on manufacturer. In lieu of
knowing the manufacturer for all units in ERCOT, we are using the
machine type as a filter with the assumption that for each type of
unit / unit output combination there will be a small subset of
manufacturers therefore allowing for a peer identification based on
similar parameters.

Page 34

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

PTI Estimation Peer Identification

Procedure
1. Determine generator type of unit with missing data
2. Compile list of units of similar type with completed data.
3. In the case of CCPs, there is an additional level of categorizing based
on plant configuration (i.e. 2x1, 3x1). The further increases the
likelihood of accurate peer detection.
4. Identify candidates with similar output
5. The detailed parameters of the candidates should then be compared
to the available parameters of the machine of question. The most
similar candidate is now identified as a peer.
6. Complete the missing RARF with values from the indentified peer
machine.

Page 35

Dec 15, 2016

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International

Questions
Contact Information:
Nelson Bacalao
Nelson.Bacalao@siemens.com
Alicia Dortch
Alicia.Dortch@siemens.com

2012 Siemens Industry, Inc. All rights reserved.


Siemens Power Technologies International