Sei sulla pagina 1di 10

Click icon to add picture

Power Generation
using speed
Breaker

* Power becomes major need for human life.


* While moving the vehicle possess some kinetic energy and it
is being wasted.
* This kinetic energy can be utilized to produce power by
special arrangement called power hump.
* Kinetic energy of moving vehicle can be converted to
mechanical energy of the shaft through rack and pinion
mechanism.it is connected to electric dynamo to produce
unregulated electrical energy.
* For continuous supply of generated power zener diode is
used.

*ABSTRACT

* The availability of conventional fossil fuels will


be exhausted in few years.
* To overcome the energy crisis , renewable
sources can be utilized.
* Among the renewable sources

,power hump is simple and


economical method.
* It is the combination of simple mechanical and
electrical techniques.

*INTRODUCTION

*
Speed breaker
mechanism

BLOCK DIAGRAM
battery

Inverter
circuit

Step-up
transformer

Load

*When the vehicle moves over the dome it get

compressed along with spring and rack that moves


downward in reciprocating motion.
*Since rack is connected to the gears it converts
reciprocating motion into rotary motion so that the
two gears rotate in opposite direction.
*A flywheel is mounted on the shaft to regulate the
fluctuation in energy and maintains energy uniform.
*Shafts rotate with certain R.P.M , it is connected
through belt drives in which mechanical energy into
electrical energy.
*Energy is proportional to the traffic density.
*It works on the generator rule.

*Working principle

* Spring coil mechanism


* Rack and pinion mechanism
* Crank shaft mechanism
* Roller mechanism

Different types of
mechanisms

* Suitable at parking of multiplexes , malls , toll

booths , signals etc.,


* USES: Charging batteries and using them to
light up the streets, etc.,
* Such speed breakers can be designed for heavy
vehicles , thus increasing the input torque and
ultimately the output of the generator.
* More suitable and compact mechanisms to
enhance efficiency.

*Future scope

* It can be implemented at metropolitan cities.


* So that more electric power is produced.
* Arrangement of whole setup is easier.
* The stored electricity could satisfy the daily
requirement of electric power.

*CONCLUSION

Presented by

Jothi Ramalingam.R

Kamal raj.S

Surendar big boss.D

Sudhakar.D
pre

Th
an

ky
ou

Potrebbero piacerti anche