Turbines:
2x 45 MW Single Cylinder, Condensing, 4 No Extractions
Speed: 7059 RPM
Make: Siemens
Generators:
56.25 MVA , 45 MW, 11Kv, Air Cooled, PF: 0.8 Lag
Full Load Current: 2952 Amps
Make: TDPS
9
Cooling tower
3000 m3 x 6 Cell, Induced draft, Counter Flow
Make: Paharpur
Switch Yard
132 KV /11KV Double Circuit
Make : Areva T&D
DM Plant:
Capacity: 12 m3/ hr, 2 Stage RO
Water Handled: Ground Water
Make: Ion- Exchange
11
Presentation outline
132,11,0.415 KV SLD
220V DC SLD
Conclusion
Question-Answer Session
12
14
11 KV SLD
15
Switchyard
Equipments
Sld
22
132 KV Switchyard
JINDAL POWER
LTD
(4X
250MW)
23
16.5/11/6.6KV(GenerationVoltage)
400KV,220KV&132KV(TransmissionVoltage)
11/6.6KV,415V(DistributionVoltage)
132KVSwitchyard
11KVGenerationVoltage
415VLTDistributionVoltage
24
The
GeneratorTransformer
InstrumentTransformer
CircuitBreaker
Isolator
EarthingSwitch
LightingArrester
25
GENERATOR TRANSFORMER
RATING OF GENERATOR TRANSFORMER
VOLTAGE
132/11 kV
HV -
246
LV -
2952 Amp
Ynd1
PERCENTAGE IMPEDANCE
TAPS
56.25 MVA
12.22 %
1 TO 29 ( -20% T0 +15%)
13 No.
( 132 kv)
ONAN
26
EQUIPMENT RATINGS
RATINGS OF LIGHTENING ARRESTER
Type
Zinc Oxide Gapless
VOLTAGE AND FREQUENCY
102 kV RMS, 50 Hz
HIGHEST SYSTEM VOLTAGE
145 Kv
WITHSTAND VOLTAGE
275/650 kV PEAK
RATED ARRESTER VOLTAGE
116 KV
NOMINAL DISCHARGE CURRENT
10 KA
CREEPAGE DISTANCE
31mm/kv
The Current rating of LA can be calculated as per the formula :
LA = 1.12 * (CRITICAL FLASH OVER VOLT - LA VOLT RATING)/(SIL)
SIL =SURGE IMPEDANCE LOADING OF LINE = 2.5 (kV)
The Voltage rating of LA depend on Co-efficient of earthing(0.8 effectively
earthed system) and Co-efficient of switching over voltage.
RATED VOLTAGE
= 0.8 x Rated Max. operating system voltage
= 0.8 x 145 kv = 116 KV rms.
27
EQUIPMENT RATINGS
RATINGS OF VOLTAGE TRANSFORMER
VOLTAGE AND FREQUENCY
132 kV, 50 Hz
HIGHEST SYSTEM VOLTAGE
145 Kv
INSULATION LEVEL
275/650 kV
PRIMARY VOLTAGE
132/3 KV
SECONDARY VOLTAGE
110/3 VOLTS
COOLING MEDIUM
OIL
RATED BURDEN
50,100,100 VA
METHOD OF CONNECTION
Yy
RATED POWER FACTOR
0.8 PF LAG
ACCURACY CLASS
0.2/3 P
RATED VOLTAGE FACTOR
1.2 CONT. & 1.5 FOR 30s
CREEPAGE DISTANCE
31kv/ mm
VTs are used to step down system voltage to lower value for measurement,
protection and control.
Based on application types are 1) Measureing (EMVT), 2). Protective, CCVT
Based on construction types are 1) Electromegnetic Voltage Transformer
2) Capacitor Voltage Transformer
3) Coupling Capacitor voltage transformer
28
EQUIPMENT RATINGS
RATINGS OF CURRENT TRANSFORMER (Bay-Protection)
VOLTAGE AND FREQUENCY
HIGHEST SYSTEM VOLTAGE
NO. OF CORES
PRIMARY CURRENT
SECONDARY CURRENT
COOLING MEDIUM
132 kV, 50 Hz
145 Kv
4
750A
1 A
OIL
CTs are used to step down/reduce current from higher value to lower
value for measurement, protection and control.
It can be classified into two main groups
1) Measuring CT 2) Protection and control CT
29
EQUIPMENT RATINGS
RATING OF ISOLATORS
VOLTAGE AND FREQUENCY
RATED CONTINOUS CURRENT
SHORTTIME CURRENT & TIME
WITHSTAND TEST VOLTAGE
CREEPAGE DISTANCE
OPERATING MECHANISM
CONTROL VOLTAGE
132kV, 50 Hz
2000 A,
31.5 KA FOR 1SEC
275/650 kV
31mm/kv
3 PHASE MOTOR
220 V DC
Isolators are disconnecting switch used for disconnecting the circuit under no load condition.
(Should be open after breaker & closed before breaker.
Gang operated ,double break isolators are used
30
EQUIPMENT RATINGS
RATING OF CIRCUIT BREAKER
TYPE
SF6
NORMAL SYSTEM VOLTAGE
132 Kv
VOLTAGE AND FREQUENCY
145kV, 50 Hz
HIGHEST SYSTEM VOLTAGE
145 Kv
RATED CONTINOUS CURRENT
3150 A
IMPULSE WITHSTAND VOLT.
650 kV PEAK
MAKING CAPACITY
100 KA PEAK
S/C BREAKING CURRENT
40 KA FOR 3SEC
POWER f WITHSTAND VOLT
275 Kv rms for 1 min
OPERATING DUTY
O-0.3S-CO-3min-CO
SF6 PRESSURE
6 TO 7 BAR
OPERATING MECHANISM
Spring Force
CONTROL VOLTAGE
220 V dc
Breaker is a device capable of making & breaking an electrical circuit under normal and abnormal
condition.
SF-6 gas is used for medium for arc intruption
Necessary energy for opening & closing of breaker is provided by Spring Force.
31
Transmission and
Distribution
Lines
Synchronizatio
n Breaker
Scheme
33
34
NGR
G
LASCPT
Cubicle
GC
B
UAT XMER
UNIT
PANEL
A
HT PANELS
UNIT
PANE
LB
11kv supply
from
35
NGR
G
LASCP
T
cubicl
e
GC
B
UAT XMER
UNIT
PANEL
A
HT PANELS
UNIT
PANEL
B
11kv supply
from
36
NGR
G
LASCP
T
Cubicl
e
GC
B
UAT XMER
UNIT
PANEL
A
HT PANELS
UNIT
PANE
LB
11kv supply
from
132 KV
Line-1
Pilibhit
GT1
BUS PT-1
LINE
BRK -1
GT BRK
-1
LINE
ISOLATOR
132 KV
Line-2
Dohna
LINE
BRK -2
GT BRK
-2
BUS PT-2
GT2
38
1)
Ensure 11 kv station supply is resumed & HT Station boards is
charged. Also
Unit boards are charged from station boards through respective
Transformer
feeders.
2) Charge Main pcc & Aux. pcc through their respective incomers .
3) Ensure outgoing feeders to TG MCC from Main pcc is ON.
4) Ensuring Line voltages of TG MCC incomers 1&2 is healthy.
5) Switch OFF DG Breaker of TG MCC manually.
6) Switch ON TG MCC incomer 1&2 of their respective units.
7) Normalise auxiliaries from TG MCCs.
8) Ensuring all LT boards incoming supply, switch ON incomers of all
boards.
9)
40
Role of Department
Contributing towards Uninterrupted & quality Power supply to
UPPCL Grid by continual Improvement in Electrical process to
improve efficiency & reliability of Power system
Attend Electrical operation & maintenance related problems
Analysis of Aux. Power Consumption and continue effort to
reduce them.
Handling the 132,11,0.415 kV S/S in operations related to Power
Evacuation, Synchronizing and fault analysis.
41
42
Prime
responsibilities
:
Elect.
Operations
(mainly
Synchronising, Load Management) and shift co-ordination with
other departments including 132 KV S/S.
, Support to maintenance
43
Departmental Achievements
Most Appreciable Jobs:
i) Change the Commercial PT of R&Y Phase of line -1 result in daily
gain of 3500 KWH.
ii)
Run the both plant in 55 HRs. after TG-2 Metering Panel got Fired by
developing own, contactor based synchronizing Scheme.
iii) Sucessfully Commissioned the ABT & EMS System for maintaining
UI Charges.
iv) Successfully implementation of DF/DT protection on both line feeder
which help us to come our unit in Island mode in case of remote
breaker trip first.
v) Station APC achieved about 10.2% which was about 12% at the time of
Plant runing after COD.
44
QUESTION-ANSWER
SESSION
What is the essential condition of synchronizing
the two system.
Why we use Star-Delta Starter for starting the
Induction Motor
Why we take DC supply in Control & Tripping.
What Happened if DC supply given to
transformer.
12/8/16
45
QUESTION-ANSWER
SESSION
How can we reverse the direction of 3-phase
Induction Motor.
What is the use of choke and starter in Tube-light.
Can we visually inspect the low RPM Motor among
three same KW of Motors without seeing the
Motor Name Plate.
If yes then How .
What is the use of capacitor in Ceiling fan Motors.
12/8/16
46
Thanks
47