Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
lan
Overview
1- LDR
2- DRD
3- MBDR
4- OLC
Overview
- Main steps of Load Control:
CAC IAC LDR OLC
1. LDR
Triggering:
If the SF corresponding to the current remaining code of the cell is larger than the
value
of CellLdrSfResThd.
1.4- Priority
1.5- Actions
RNCSOS- WE Stats
149
Number of DL DR reductions
721
Number of InterFreq HO
95749
BlindHO.
The service types of UEs are not forbidden for LDR handover by parameter
InterFreqLdHoForbidenTC
The RNC selects the UE with services not forbidden and sort them by priority.
The UE measures the RSCP and Ec/No of the candidate cells and periodically
reports the measurement results to the RNC. The reporting period is specified
by the PrdReportInterval parameter.
The target cell should not be congested.
The target cell RSCP should be higher than TargetFreqThdRscp
The target cell EcNo should be higher than TargetFreqThdEcN0
2- DRD
Technological satisfaction.
Service Steering.
Load balancing.
IRAT DRD
2- DRD
Service Steering
3- MBDR
Triggering conditions:
3- MBDR
Target cell selection:
1- The target cell shouldnt be in MBDR state.
2- Choose the target cells that respect conditions on EcNo and/or RSCP.
HOThdEcN0, HOThdRscp InterRATHOThd.
3- Test the MBDRPrio flag.
4- OLC
4- OLC
Actions:
1- Reducing the rate of BE Services.
2- Switching BE Services to Common Channels.
3- Adjusting the Maximum FACH TX Power.
4- Releasing Some RABs.