Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Teams
Brainstorming
Process Mapping
Pareto Charts
Histograms
Box Plots
Cause and Effect
Diagrams
Company Confidential
Planning
Purchasing Finance
Company Confidential
Quality
Positives Effects:
Negative Effects:
Motivation is High
Conversation is Stifled
Commitment is High
Company Confidential
Company Confidential
Company Confidential
Represents...
Start/Stop
Decision Point
Approve/Disapprove
Accept/Reject
Yes/No & Pass/Fail
Activity
Connector (to
another part or part
of the diagram)
Start/Stop
Examples...
Company Confidential
A
B
Step 7: Add any known operating specifications to each input & output.
Step 8: Clearly identify all process data collection points.
Company Confidential
Company Confidential
Example 2:
Map including
KPIV and KPOV
PROCESS MAP
EXAMPLE 2
Get Tools
o Correct Position
o Pre-Raise Car
Jack
Lug Wrench
Spare
Spare Tire
Remove Lugs
& Flat
All Tools
On Hand
Install
Spare
Lower Car
to Tighten
o Hand Tighten
o Snug Lugs
Tire Removed
Ready for Spare
Spare Located
On Hub
Break Lugs
Free
Jack Car
o Remove Wheel
Cover
Op. Manual
o Elevate to
Correct Height
Op. Manual
Position Jack
Jack Positioned
Car Correct Height
Remove
Jack
Cross-Tighten
Op. Manual
Return Tools
& Flat
o Lower Completely
Company Confidential
Car Lowered
Lugs Rotate
Freely
Clearance
To Remove
Flat
Drive
__KPIVs__
Raw Bracket #1
Raw Housings
Loading SOP (#1)
Weld Schedules
Air Pressure
Voltage
H20 Circulation
Data
NV
A
Raw Bracket #2
Subassembly
Loading SOP (#3)
Weld Schedules
Air Pressure
Voltage
H20 Circulation
Tip Dressing
__KPOVs__
Start
NV
A
SubAssy Critical Dimensions
SubAssy Weld Location
SubAssy Weld Nugget Size
B or C ?
VA
VA
Specification
KPOV
Specification
Stack up issues?
Dimension 4: 300 +/- 2.0mm
See print
4 mm nugget minimum
No visible flash
30 welds +/- 0
Company Confidential
KPIV
CLASSIFICATION
Raw Bracket # 1
Raw Housings
Loading SOP(#1)
Weld Schedules
Air Pressure
Voltage
Water Circulation
Unloading / Transport SOP (#2)
Raw Bracket # 2
Subassembly
Loading SOP (#3)
Weld Schedules
Air Pressure
Voltage
Unloading / Transport SOP (#4)
Gauging / V.I. SOP (#5)
Critical
Critical
Noise, S.O.P.
Critical, Controllable
Noise
Noise
Noise
Noise, S.O.P.
Critical
Critical
Noise, S.O.P.
Critical, Controllable
Noise
Noise
Noise, S.O.P.
Critical, Noise, S.O.P
Company Confidential
CLASS EXERCISE
Construct a Process Map
MAKING COFFEE
(Include KPIV & KPOV)
Company Confidential
How: Define a problem and collect data on the factors that contribute to it.
100
Type of error
Cumulative % line
Reasons
for
Rejected
Crushed
Core Panels
80
60
40
20
0
3
4
5
Type of Error
Company Confidential
1 Resin Starvation
2 Split Core
3 Scrap
4 Discoloration
5 Warped
6 Broken
7 Other
Total errors =
%
42
20
17
9
5
5
2
100
Company Confidential
Number of classes
25 to 50
51 to 100
101 to 250
251 and over
5 to 8
6 to 11
9 to 13
11 to 15
Determine the width of the classes. Set the class width so that no data
values fall on one of the limits. This is done by adding the next logical
decimal value to each limit.
For instance, if you create intervals for whole number data with limits of 1 to
5, 5 to 10, and so on , a value of 5 could go in either the first or second
interval. You can avoid this problem by setting the intervals at 0.51 to 5.50,
5.51 to 10.50, and so on, so that no data value falls on a class limit.
Company Confidential
Class
Class limits
1
2
3
4
5
6
0.51 to 5.50
5.51 to 10.50
10.51 to 15.50
15.51 to 20.50
20.51 to 25.50
25.51 to 30.50
Tally
IIII IIII
IIII IIII IIII IIII
IIII IIII IIII IIII IIII
IIII IIII IIII IIII
IIII IIII IIII
IIII IIII IIII
Company Confidential
Number of
observed measures
10
20
25
20
15
10
Frequency
40
Distribution
Lower limit
Upper limit
30
20
10
0
Strengths:
Classes
6
Weaknesses:
Company Confidential
CLASS EXERCISE
Construct a Histogram
based on the following data:
Company Confidential
Company Confidential
Bimodal:
Two combined populations. Reasons:
two shifts, operators, inspectors,
suppliers, machine settings, gages,
tools, machines, measurement
locations, etc.
Company Confidential
Missing Center:
The center of the distribution has been
sorted from the rest. This portion may
have been delivered to a customer with
tighter specifications.
Company Confidential
Company Confidential
Company Confidential
Weight (kg)
105
100
95
Low variance
on Day 5
High variance
on Day 1
4
Day
Company Confidential
Company Confidential
Class Exercise:
Construct C&E Diagram with
output of GAS MILEAGE
Company Confidential
METHOD
MACHINE
GAS
MILEAGE
MAN
MATERIAL
Company Confidential
MOTHER NATURE
Company Confidential