Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Cetakan I Des2005
III. COMMODITY
1. EXCAVATION
1.
2.
3.
4.
Land Clearing
Timber stock
Grubbing
Loading
2. REMOVAL
1.
2.
3.
Hauling
Spreading
Grading
II. OVERBURDEN
1. EXCAVATION
1.
2.
3.
4.
5.
6.
2. TRANSPORTATION
1.
2.
3.
Hauling
Spreading
Road Maintenance
1. EXCAVATION
1.
2.
3.
Loading
Ripping & Dozing
Spreading
2. TRANSPORTATION
1.
2.
3.
Loading
Hauling
Spreading
2. TRANSPORTATION
1.
2.
Hauling
Spreading
3. ROAD MAINTENANCE
1.
2.
3.
4.
5.
Hauling
Spreading
Grading
Loading
General
BUMA
KEGIATAN
Persiapan
LAND CLEARING
BUMA
KEGIATAN
Under Brushing
METODA
Perimeter
Cut Crop
inal
Gro
und
Coa
l Flo
2.7 m
or
Cup
4 dgr
EXPLOSIVE
TRUCK
8m
3m
3m
COAL
8m
3m
Catatan :
Setiap Bench memungkinkan - sebagai tempat keluar masuk unit
surface
delay
DRILLING BLASTING
Drill Hole
Stemming
DILARANG MASUK
Column Charge :
ANFO, dll
DRILL AREA
DILARANG MASUK
BAHAN PELEDAK
In hole delay
13
14
15
16
17
18
Drill hole
12
11
Loading
Point
1
Burden 8
m
10
Spacing 10 m
TOE
ROAD
CREST
MMU
BUMA
BUMA
Coal
Over Burden
Cross Section
a.
Teknik Drive by
- Posisi track serong
- Posisi truck serong, sehingga
bucket tidak melewati side dump
BUMA
a.
b.
BUMA
Catatan :
Berhati-hati dan pastikan posisi aman pada saat loading sisi sebelah kanan
(terjadi blind spot sisi buta)
BUMA
BUMA
a.
b.
BUMA
a.
b.
BUMA
Waktu edar truck = Waktu Tunggu + Waktu Muat + Berjalan dng Muatan +
Waktu Dumping + Waktu Berjalan Tanpa Muatan
B menit = Berjalan dengan Muatan
C menit = Waktu Dumping
Waktu Tunggu
F menit
Catatan :
Lihat standar parameter Cycle Time (Waktu Edar) OHT, jarak 2500 meter
BUMA
BUMA
Contoh :
Teknik Manuver yang benar, sesuai kondisi
disposal
Contoh :
Dumping yang BENAR
BUMA
x Haultruck
Wheel Diameter
6 meter
a. Tanggul Pengaman
BUMA
10 meter
6 meter
BUMA
3.5 m
2.5 m
0.0
0.5 W
Kemiringan lereng
W
0.5 W
0.5 W
Jalan Utama
C
3.5 m
3.5 m
Kemiringan lereng
0.5 W
0.5 W
0.5 W
0.5 W
Keterangan :
W = Lebar truk terbesar, saat ini HD785/CAT777