Sei sulla pagina 1di 26

FILTER DESING FOR ZONED DAMS

GEOTECHNICS IN PRACTICE
SELDA DURMAZ
seldadurmaz_22@hotmail.com

9/29/16

GEOTECHNICS IN PRACTICE

CONTENT
INTRODUCTION
DEFINITION OF ZONED DAMS
USAGE AIM OF FILTER
SUITABLE FILTER FUTURES
DESIGN CRITERIA FOR FILTER
POSSIBLE FILTER PROBLEMS
FILTER FAILURE MITIGATION
CONCLUSION
REFERENCES
9/29/16

GEOTECHNICS IN PRACTICE

INTRODUCTION
ADVANTAGES

DISADVANTAGES

ADAPTABLE
POOR WATER
RESISTANCE
ECONOMICAL

SETTLEMENT
RESISTANCE
9/29/16

GEOTECHNICS IN PRACTICE

DEFINITION OF ZONED DAMS

Semiimpervious

9/29/16

Impervious

GEOTECHNICS IN PRACTICE

Pervious

DEFINITION OF ZONED DAMS

9/29/16

GEOTECHNICS IN PRACTICE

DEFINITION OF ZONED DAMS

9/29/16

GEOTECHNICS IN PRACTICE

USAGE AIM OF FILTER

Lower the phreatic surface

Prevent erosion of soil particles

Prevent piping and heave

Allow drainage of seepage water

9/29/16

Provide a controlled outlet

GEOTECHNICS IN PRACTICE

SUITABLE FILTER FEATURES


1)Not
segregate

Segregated Earthfill at Top and Rockfill at Bottom of Stockpile


Slope
9/29/16
GEOTECHNICS IN PRACTICE

SUITABLE FILTER
2)Not change in
FEATURES
gradation

9/29/16

Ballast breakage under tie due to cyclic


loading GEOTECHNICS IN PRACTICE

SUITABLE FILTER
FEATURES
3)Not have any apparent or real
cohesion

9/29/16

GEOTECHNICS IN PRACTICE

10

SUITABLE FILTER
FEATURES
4)Be
internally
stable

9/29/16

GEOTECHNICS IN PRACTICE

11

SUITABLE FILTER
FEATURES
5)Have sufficient permeability

9/29/16

GEOTECHNICS IN PRACTICE

12

SUITABLE FILTER
FEATURES
6)Have the ability to control and seal
the erosion

9/29/16

GEOTECHNICS IN PRACTICE

13

DESIGN CRITERIA FOR


FILTER

9/29/16

GEOTECHNICS IN PRACTICE

14

DESIGN CRITERIA FOR FILTER


1) Permeability

Requirements

1.1. Embankment Permeability


Based on lab test on compacted samples
1.2. Foundation Permeability
Based on field pressure test in borings
9/29/16

GEOTECHNICS IN PRACTICE

15

DESIGN CRITERIA FOR


FILTER
2) Gradation Analysis

9/29/16

GEOTECHNICS IN PRACTICE

16

DESIGN CRITERIA FOR FILTER

9/29/16

GEOTECHNICS IN PRACTICE

17

DESIGN CRITERIA FOR FILTER

9/29/16

GEOTECHNICS IN PRACTICE

18

DESIGN CRITERIA FOR FILTER


4) Segregation

9/29/16

Requirements

GEOTECHNICS IN PRACTICE

19

POSSIBLE FILTER PROBLEMS


Hydraulic fracture (quick sand and piping)

9/29/16

Started as seepage through cracks in the rock of the right


abutment
Dam had no filter-drainage zone
GEOTECHNICS IN PRACTICE
20
Teton Dam, Idaho

POSSIBLE FILTER PROBLEMS


Leakage

Blackman Creek Dam 2005 Tasmania


9/29/16

GEOTECHNICS IN PRACTICE

21

POSSIBLE FILTER PROBLEMS


Sliding due to pore water pressure increase

9/29/16

Slide on Pawhuska Dam 2009 Osage County,


Oklahoma
GEOTECHNICS IN PRACTICE

22

FILTER FAILURE MITIGATION


Change of grading
Avoid using carbonate rocks

Partial dissolution and recemention


Interlocking of grains
Cementation
Clogging

Avoid using sulphate rocks

Weakening

In-situ control tests

Narrowly-graded uniform
filters

Consider segregation problems

Limiting the maximum particle size


9/29/16

GEOTECHNICS IN PRACTICE

23

CONCLUSION
What you dont know can hurt you.
Buraya bir eyler ekle tek cmle olmasn byle

9/29/16

GEOTECHNICS IN PRACTICE

24

REFERENCES
International Commission on Large Dams (ICOLD), (1986).
Quality Control for Fill Dams, Bulletin 56, Paris.
International Commission on Large Dams (ICOLD), (1986). New
Construction Methods. State-of-the-Art, Bulletin 63, Paris.
International Commission on Large Dams (ICOLD), (1990).
Conventional Methods in Dam Construction. Review, Bulletin
76, Paris.
International Commission on Large Dams (ICOLD), (1992).
Owners, Consultants and Contractors. How to improve
relationships, Bulletin 85, Paris.
Geotechnical Engineering of Dams, Robin Fell ,Patrick
MacGregor,David Stapledon,Graeme Bell

9/29/16

GEOTECHNICS IN PRACTICE

25

9/29/16

GEOTECHNICS IN PRACTICE

26