Sei sulla pagina 1di 4

Site Visit Inspection - Acceptance

Site Name: Nebbi


Site ID: 4601
Vendor: NETIS
Vendor Engineer: Ken
Eaton Engineer: Emmanuel

Observations and Recommendations:


1. Section 3 Connecting plates. 140x140x8 is given as required size for use as
installation, however 120x120x8 has been used
2. Torque test failed
3. Non uniformity in bolts installation
4. No details for the introduced joints. Bracings made by joining two members
5. The replaced section 1 bracing installation do not conform to the assembling
drawing
6. Missing and loose bolts on the already existing tower members
7. Certificate to confirm Dip Galvanization of the new members not availed
8. Recovered materials should be returned to the Eaton Warehouse
9. Certificate to confirm the Grade of steel used required

Site Visit Inspection - Acceptance


Missing and loose bolts on the
already existing tower
members

Site Visit Inspection Acceptance


Non uniformity in bolts installation

Site Visit Inspection Acceptance


Replaced bracings for section 1

On the assembling
drawing, this member
faces inside

Potrebbero piacerti anche