Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PRODUCED WATER
GAS
LNG
Feasibility Study
Process Design /
Basic Engg.
Trouble Shooting
& Revamp
FEED
Pre-Commissioning
& Commissioning
Detail
Engg.
Conceptualization
Process Simulation
Cost Estimation
Techno-Commercial Evaluation
Basic Engineering:
Preparation of Specifications
Commissioning:
Pre-Commissioning
Commissioning
TQ
TQ
EQ. LIST
EQ. LIST
UHD
UTILITY
SUMMARY
UHD
UTILITY
SUMMARY
FLARE LOAD
SUMMARY
PE
BDEP
LINE LIST
LINE LIST
PRECOMMISIONING
MANUAL
PRECOMMISIONING
MANUAL
OPERATING
MANUAL
EQUIPMENT LIST
FLARE LOAD
SUMMARY
CHEMICAL
SUMMARY
HAZARDOUS
SOURCE LIST
REVISED P&ID
CHEMICAL
SUMMARY
HAZARDOUS
SOURCE LIST
REVISED P&ID
BDEP
EQUIPMENT LIST
UHD
REVISED P&ID
LINE LIST
PROCESS D/S FOR
EQUIPMENTS
OPERATING
MANUAL
EQUIPMENT LIST
UHD
REVISED P&ID
PLOT PLAN
PP
CV
EL
HAZARDOUS
SOURCE LIST
REVIEW & COMMENTS
PC
EQUIPMENT LIST
UHD
REVISED P&ID
PROCESS D/S FOR
MACHINERY ITEMS
REVIEW & COMMENTS
EQUIPMENT LIST
UHD
REVISED P&ID
PROCESS D/S FOR
EQUIPMENTS
EQUIPMENT LIST
UHD
REVISED P&ID
LINE LIST
UPDATED D/S FOR
INSTRUMENTS
VENDOR DOCUMENTS
ME
FABRICATION DWG.
EQ
IN
Preparation of TQs
Licensor P&ID
Equipment list
ISOMERISATION PROJECT
MUMBAI
ISOMERISATION PROJECT
SERV ICE
NO.
TITLE : EQUIPMENT
LIST
EQUIPMENT
DA-31702
DA-32810
PENEX UNIT
DA-32810
THICKNESS
WEIGHT
(mm)
(Tons)
LPG STRIPPER
LPG STRIPPER
(mm)
(Tons)
ERECTION
EQUIPMENT
TY PE
STA BILIZER
STA BILIZ ER
DA-32811
DA-32811
WEIGHT
(m)
INTERNAL
DEPENTANIZER
PENEXDEPENTA
UNIT NIZER
DA-31702
ERECTION
THICKNESS
DIMENSIONS
STRIPPER
STRIPPER
EQUIPMENT
TY PE
(ID).X(TL-TL)
(m)
Top = 2.0
COLUMNS
INTERNAL
NO.
LNHT UNIT
DA-31701
DIMENSIONS
(ID).X(TL-TL)
REQD.
SERV ICE
NO.COLUMNS
NO.
REQD.
Trays, Distributor
Internal baff les,
Vortex Breaker,
Bottom = 2.8
1
TL-TL = 27.9
Top = 2.0
Trays, Distributor
Bottom = 2.8Top =
Internal
3.2 baff les,
Trays, Distributor
TL-TL = 27.9
BottomVortex
= 4.0 Breaker,
Internal baff les,
1
TL-TL = 36.9 Vortex Breaker,
Top = 3.2
Trays, Distributor
Bottom = 4.0
Internal baff les,
TL-TL = 36.9Top Vortex
=1.7 Breaker,
Trays, Distributor
Bottom = 3.2
Internal baff les,
1
TL-TL=26.2
Vortex Breaker,
Top =1.7
Trays, Distributor
Bottom = 3.2
Internal baff les,
Trays, Distributor
TL-TL=26.2
Vortex Breaker,
Internal baff les,
1
0.75 x 21
Vortex Breaker,
0.75 x 21
Trays, Distributor
Internal baff les,
Vortex Breaker,
MOC + C.A
SHELL &
MOCHEAD
+ C.A
TRA YS
KCS + 3 mm
KCS + 3 mm
TP 410
KCS + 3 mm
KCS + 3 mm
TP 410
KCS+3mm
KCS+3mm
TP 410
CS+3mm
CS+3mm
OPERATING CONDITION
DESIGN CONDITION
INSULA TION
PRESSURE
TEMP
PRESSURE TEMP.
TYPE THICKNESS
(kg/cm2g)
(C)
(kg/cm2g)
(C)
(mm)
TRA YS
OPERATING
CONDITION
DESIGN CONDITION
INSULATION
TOP BOTTOM
TOP BOTTOM
PRESSURE
TEMP
PRESSURE TEMP.
TYPE THICKNESS
(kg/cm g)
(C)
2
SHELL &
HEAD
TP 410
(kg/cm2g)
(C)
(mm)
TP 410
TP 410
70
57
57
179
-
45
70
119
-
91
171
-
TP 410
91
45
60
Int : 15.82
Ext : FV
232
171
Int : 15.82
232
Ext : FV
171
Int : 4
119
Ext : FV
IH
147
119
171
Int : 4
Ext : FV
147
119
IH
IH
IH
210
179
Int : 13.5
210
Ext : FV
179
Int : 13.5
60
Ext : FV
IH
120
60
120
Int : 13.5
Ext : FV
120
60
80
80
Int : 13.5
Ext : FV
179
125
125
IH
120
Equipment Number
Service
Dimensions
Internals
Material of Construction
Insulation Details
ISOMERISATION PROJECT
MUMBAI
SERVICE
NO.
DIMENSIONS
NO.
REQD. (ID).X(TL-TL)
(m)
INTERNAL
EQUIPMENT
ERECTION
TYPE
THICKNESS
WEIGHT
(mm)
(Tons)
MOC + C.A
OPERATING CONDITION
PRESSURE
TEMP
(kg/cm2g)
(C)
DESIGN CONDITION
PRESSURE
TEMP.
(kg/cm2g)
(C)
INSULATION
TYPE THICKNESS
SHELL &
HEAD
TRAYS
Trays, Distributor
Internal baffles,
Vortex Breaker,
KCS + 3 mm
TP 410
91
171
Int : 15.82
Ext : FV
232
171
IH
125
Trays, Distributor
Internal baffles,
Vortex Breaker,
KCS + 3 mm
TP 410
70
119
Int : 4
Ext : FV
147
119
IH
80
Trays, Distributor
Internal baffles,
Vortex Breaker,
KCS+3mm
TP 410
57
179
Int : 13.5
Ext : FV
210
179
IH
120
Trays, Distributor
Internal baffles,
Vortex Breaker,
CS+3mm
TP 410
45
60
Int : 13.5
Ext : FV
120
60
(mm)
COLUMNS
LNHT UNIT
Top = 2.0
DA-31701
STRIPPER
Bottom = 2.8
TL-TL = 27.9
Top = 3.2
DA-31702
DEPENTANIZER
Bottom = 4.0
TL-TL = 36.9
PENEX UNIT
Top =1.7
DA-32810
STABILIZER
DA-32811
LPG STRIPPER
Bottom = 3.2
TL-TL=26.2
0.75 x 21
Similarly the utility data for generation to be furnished with +ve value.
Electricity
Steam
Condensate
Cooling Water
% Purity
DMDS
Perchloroethylene (C2Cl4)
Anhydrous Ammonia
BARODA, INDIA
Document No.: A-317-4012
Rev.: 0
Chemical Identification
Sr. No.
L&T-CHIYODA LIMITED
--
Chemical Service
First fill
quantity
required
3200 kg
Scope of
supply
MRPL
6.5 m3
MRPL
100%
200 kg
MRPL
100%
20 kg
MRPL
30 m3
MRPL
20% Wt
99.9 % Min.
-20% Wt
--
2500 kg
25 m3
350 kg
MRPL
MRPL
MRPL
Catalyst
Quantity
Type
Bed Height
(mm)
Bulk
Density
(Kg /m3)
Type of
Loading
2500
UOP "S-12"
Catalyst
3720
1065
Sulfur guard
bed
1800
ADS-11
2600
DC-32801
Saturation
Reactor
2400
UOP "H-8"
Catalyst
DC-32810
Methanator
Reactor
1100
DC-32811
Penex
Reactor
DC-32812
FA-32801A
Sr.No.
Equip. Tag
No.
Service
DC-31701
Reactor
FA-32802
Equip ID
(mm)
Bed
(m3)
Contingency
5% (m3)
Total
quantity
(m3)
Total
quantity
(kg)
Manufacturer
Sock
18.3
0.915
19.215
20464.0
UOP
930
Sock
6.62
0.331
6.951
6464.4
UOP
2480
520
Sock
11.2
0.56
11.76
6115.2
UOP
Puraspec 2443
7160
--
Sock
6.8
0.34
7.14
--
UOP
2900
UOP "I-8"
Catalyst
9240
882
Dense
61
3.05
64.05
56492.1
UOP
Penex
Reactor
2900
UOP "I-8"
Catalyst
9240
882
Dense
61
3.05
64.05
56492.1
UOP
Zinc oxide
treater
1200
Puraspec 2020
3200
--
Sock
3.62
0.181
3.801
--
UOP
Line Specifications
MUMBAI
TITLE : BATTERY LIMIT TIE-IN SUMMARY
Sr.
No.
Stream Name
From
To
Phase
L/V/M
Flowrates
Tons/hr
Normal
Properties
kg/m3 (L)
Visc.
MW (V)
cP
Operating Conditions
Pressure Temperature
kg/cm2 g
deg C
min/nor/max
min/nor/max
Design Cond
Pressure
kg/cm2 g
MP Steam
B/L
HEADER
36066.0
18.0
0.02
14/15/16
255/260/270
22
LP Steam
B/L
HEADER
33180.0
18.0
0.02
3/3.5/4
160/175/200
10
HP Steam
B/L
HEADER
2930.0
18.0
0.01
39/40/41
330/390/408
45
Instrument Air
B/L
HEADER
625.0
29.0
0.02
4.5/6.5/ -
- /40/ -
10.5
B/L
HEADER
2378207.0
1000.0
0.60
- /4.5/ -
- /33/ -
Fuel Gas
B/L
HEADER
1212.0
15.5
0.01
- /4.5/5
- /40/ -
Fuel Oil
B/L
HEADER
2273.0
854.0
11.50
- /13/20
- /170/ -
25
Line Number
Line Size
MUMBAI
LINE NO.
PIPING CLASS
10-P-3170001-A1A1
606
10
317
0001
A1A1
FA-31701
P-3170215
HC
6-P-3170002-A4A1
606
317
0002
A4A1
GA-31701A
P-3170046
HC
10-P-3170003-A1A1
606
10
317
0003
A1A1
P-3170001
P-3170216
HC
6-P-3170004-A4A1
606
317
0004
A4A1
GA-31701B
P-3170002
HC
0.75-P-3170005-A1A1
691
0.75
317
0005
A1A1
P-3170002
SN-31701
HC
0.75-P-3170006-A1A
691
0.75
317
0006
A1A
SN-31701
FLARE
HC
0.75-P-3170007-A4A1
691
0.75
317
0007
A4A1
SN-31701
P-3170001
HC
6-P-3170008-A4A1
606
317
0008
A4A1
P-3170002
FV-002
HC
6-P-3170009-A1A1
606
317
0009
A1A1
FV-002
FA-31701
HC
LINE NO.
INSULATION
THK. (MM)
UNIT NO.
SR.
NO.
INSULATION
TYPE
FLUID CODE
STATE
(A)
SIZE
(INCH)
LOCATION
P & ID NO.
IDENTIFICATION
FROM
TO
(L/V/M)
NATURE
OF
FLUID
Flammability
Flash point
Auto-ignition temperature
its
Licensor P&ID
Updated P&ID
based on
Hydraulics
Compressor
Suction line is
increased to 6
from 4 as per
hydraulic
calculations
Licensor Datasheet
document.
V-51203
V-51201 SGS
TRIP
TRIP
TRIP
TRIP
TRIP
TRIP
ALARM
ACTION
51UZA-2105
51UZA-2106
51UZA-2107
51UZA-2108
51UZA-2100
DESCRIPTION
PEFS NO.
TRIP
51UZA-2100
DESCRIPTION
TAG NO.
CLOSE
51UZA-2104
CAUSE
Cause Section
51UZA-2102
UNIT 51
51UZA-2103
Effect Section
TAG NO.
51LZA-2008
D-0098-51-25-0006
D-1651-51-50-0018
51LZA-2011
51LZA-2008
D-0098-51-25-0006
D-1651-51-50-0018
51LZA-2011
D-0098-51-25-0006
51LZA-2008
D-1651-51-50-0018
51LZA-2011
Interface Activities
Updation of Control & Safeguarding narratives and issue
for HAZOP Study
Updation of Utility summary
Updation of Line list
3D-Model Review
Number of Nozzles
Sizes of Nozzles
STAGE 3:
HAZOP Study
SIL Study
FIREPRAN Study
takes
preventive
care
of
them
and
if
not,
performing to specification.
The SIL is based on the accepted risk level and ranges from 1
to 4
Safety
Integrity
Level (SIL)
4
3
2
1
Probability of Failure
Mode of Operation On demand
Mode of Operation continuous
(average probability of failure to perform
(probability of dangerous failure per
its design function upon demand)
hour)
-5
-4
> 10 to < 10
> 10-9 to < 10-8
> 10-4 to < 10-3
> 10-8 to < 10-7
> 10-3 to < 10-2
> 10-7 to < 10-6
> 10-2 to < 10-1
> 10-6 to < 10-7
Effects on Human
Effects on Property
No damage
12.5
Minimum energy
required for piloted
ignition of wood,
melting of plastic
tubing
Failure of steel
structures within 30
minutes
kW/m2
37.5
STAGE 3 (Continued):