Sei sulla pagina 1di 9

NETWORK PROFILE SITE PROFILE

d
e
Ne at e
d
p
U
SORONG

MERAUKE
1
Network Operation Management Sub-Directorate - 2014

1 2016
NETWORK QUALITY MANAGEMENT
Page 1

PUMA | Drive Test 4G - Mobility


Drive Test Methodology
Using Samsung S5 (SM-G901F) NEMO Handy
Data Mobile HTTP DL Lock 4G

d
e
Ne at e
d
p
U

Summary
DT Date
Route

:
:

Parameter

Average

Max

RSRP (dBm)
RSRQ (dB)
SINR (dB)
Throughput (Mbps)

2
Network Operation Management Sub-Directorate - 2014

2 2016
NETWORK QUALITY MANAGEMENT

NETWORK PROFILE DT RESULT

d
e
Ne at e
d
p
U

3
Network Operation Management Sub-Directorate - 2014

3 2016
NETWORK QUALITY MANAGEMENT
Page 3

NETWORK PROFILE DT RESULT

d
e
Ne at e
d
p
U

4
Network Operation Management Sub-Directorate - 2014

4 2016
NETWORK QUALITY MANAGEMENT
Page 4

Capability
d
e
Ne at e
d
p
U

All sites cover area event has done HSDPA for 42 Mbps, and HSUPA 5.7 Mbps.
Needed upgrade eul user sites BTM024W, BTM719W, and BTM806W.
Btm
Activation emergency license to adjust user HSUPA & HSDPA

Network Operation Management Sub-Directorate - 2014

5 2016
NETWORK QUALITY MANAGEMENT

VVIP Route 3G Assessment


Capmon

Power
Utilisasi

VVIP Jalur 3G

High Utilization >60%


Siteid

Power
Utilisasi

DL CE
Utilisasi

UL CE
Utilisasi

DLCode
Utilisasi

d
e
Ne at e
d
p
U

UtranCellId

Siteid

HS User
Utilisasi

UL 2mstti User
Utilisasi

UL 2mstti User
Utilisasi

Dl Code utilization > 90%, needed allocate more code to reduce utilization
Dl power utilization > 60% 10 sites
EUL User utilization > 60% ~ 1 sites, needed upgrade EUL user, actual only 4
user (1st carrier)

Network Operation Management Sub-Directorate - 2014

6
6 2016
NETWORK QUALITY MANAGEMENT
Pag

VVIP Route 2G Assessment

Capmon

SDCCH_AV SD Traffic Offer


AIL
(GoS 0.2%)

d
e
Ne at e
d
p
U

SDCCH
Traffic Offered TCH Utilization PDCH_ALLOC_FA PDTCH DL
Utilization
(GoS 2%)
(GoS 2%)
IL_PEAK
BLOCKING

VVIP Jalur
2G

PDCH_ALLO_F
AIL >5%

High Utilization >TCH_Util >80% & TCH Cong>2% &


TCH_Avail>98 (HR 50%)
EXCHID

CELL

Traffic Offered (GoS 2%)

TCH Utilization (GoS 2%)

Base on capacity monitoring W12 high TCH utilization, will be checked allocation channel for
SD & TCH

7
Network Operation Management Sub-Directorate - 2014

7 2016
NETWORK QUALITY MANAGEMENT
Pag

VVIP Route CAPABILITY ASSESSMENT


License Feature Activated

d
e
Ne at e
d
p
U

License DC HSDPA Disable


Sitename

Siteid

licenseStateHsdpaMc

2 Node B still has disable multicarrier

8
Network Operation Management Sub-Directorate - 2014

8 2016
NETWORK QUALITY MANAGEMENT
Pag

ACTION PLAN & PROGRESS STATUS


RAN Improvement :

d
e
Ne at e
d
p
U

9
Network Operation Management Sub-Directorate - 2014

Service Assurance & Network Quality

9 2016
NETWORK QUALITY MANAGEMENT

Potrebbero piacerti anche