Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
TO
THE
PUTTING
(BEFORE
UNITS)
DAMAGED,
CONTROL
BY
ITS
KILLING BY CIRCULATION
IT
IS
THERMAL
LASTLY, THE
CHECKED.
WELLS
STABILITY
MUST
FREQUENTLY
BE
INSTALL BOP.
TEST THE BOP BETWEEN THE TWCV AND THE BLIND RAM;
CONNECT A TUBING IN THE TUBING HANGER, CLOSE THE PIPE
RAM AGAINST THE TUBING AND TEST THE PIPE RAM.
INSTALL BOP.
TEST THE BOP BETWEEN THE TWCV AND THE BLIND RAM;
CONNECT A TUBING IN THE TUBING HANGER, CLOSE THE PIPE
RAM AGAINST THE TUBING AND TEST THE PIPE RAM
UNSTABLE
WITH
START UP PROBLEMS
THE TECHNIQUES DESCRIBED IN INITIAL COMPLETION ARE
APPLICABLE AT THIS STAGE EXCEPT THAT THERE IS USUALLY NO
AVAILABLE KICKOFF FLUID THAT IS LIGHT ENOUGH.