Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Kirindiwela
Bridge Site
Introduction
During my training time I gathered a great amount of knowledge
Client/Consultant :- Road
Development Authority Sri Lanka
to the drawings
Construction of the Bypass Road
Construction Drawing
Procedure of piling
The construction of bored cast in situ concrete
Pile boring,
Reinforcement cage lowering,
Flushing
Pile concreting.
Pile Boring
location
Initial boring of about 1.5 meters is to be done using cutting tool
The temporary guide casing, 1.5 meter length with outside
Flushing
After cage lowering, 200 mm diameter tremie
Pile machine
Boring Hammer
Reinforcement cage
Reinforcement cage lowering
Concreting of a pile
cubes)
when working
safety
Thank You !