Sei sulla pagina 1di 30

Industrial training in

DVC Maithon Hydel


project

All about
DVC (Damodar Valley
Corporation)is a legacy to
DVC
the people of India, emerged as a culmination of
attempts made over a whole century to control
the wild and erratic Damodar river. The river
spans over an area of 24,235 km2 covering the
states of Jharkhand (Dhanbad, Bokaro,
Hazaribagh, Koderma, Giridih, Chhatra, Palamau,
Rachi, Lohardaga and Doomka) & West Bengal
(Burdwan , Hooghly, Howrah, Bankura and
Purulia).

Objectives:
The objectives at the time of its inceptions are:
Flood control
Promotion and operation of schemes for irrigation
Water supply for industrial and domestic use
Navigation and drainage
Generation, transmission and distribution of electrical
energy
Promotion of forestation and control of soil erosion in
valley area
Promotion of public health,
agriculture,industrial,economic and general well-being
in Damodar Valley

Notable features of the Maithon Dam


Constructed on the river Barakar
First underground power station
Generating capacity of 60 MW
MHPS -1000 feet below water level

Training at:
Maithon Hydel power station
Kalyaneshwari substation
Central load dispatch

Maithon Hydel
Power station

Maithon Hydel Power Station is located on the river


Barakar 12.9 km above its confluence with the Damodar
near the border of Dhanbad and Burdwan districts of the
state of Jharkhand and West Bengal respectively. The unique
feature of this hydal power station is that it is located
underground in the left bank of the river and is the first of its
kind in India. The Power station has a total generating
capacity of 60 MW with 3 units of 20 MW each.

king of Hydropower Stat

Generator specificatons
20 Mw Generator Specification

1. Simmens Sehuckert,Germany
2. 3PH,generator no.D73445
3. Type-PFL 670/47-34
4. Y11,000 volt,1310/1525amp
5. RPM-176.6
6. KVA-25000/29000
7. P.F-0.8 const.

Excitor Specification
1. V: 295/330/445
2. A: 465/505/700

Main Excitor
1. DC GEN. NO-D39408
2. TYPE-GV 441/36
3. V-310,333,500
4. RPM-176.6

MEJIA THERMAL
POWER STATION

ejia Thermal Power Statio


(MTPS)

The MTPS under the DVC is the second largest


thermal plant in West Bengal.
It has the capacity of 2340 MW with 4 units of
210 MW each, 2 units of 250 MW each & 2
units of 500 MW each.
With the introduction of another two units of
500 MW that is in construction it will be the
largest in West Bengal.

General layout of
Thermal Power Station

Coal handling plant


The function of coal handling plant is automatic
feeding of coal to the boiler furnace.
A 200MW plant may require around 2000 tonnes
of coal daily

Ash handling plant


The Ash handling System tactically manages
the ash output of the power station in such
a way as to support the monetary
requirements of the plant as well as proper
disposal in ash ponds.

Boilers
Boiler is an enclosed vessel in which water is
heated and circulated until the water is turned
in to steam at the required pressure
Types of boilers are:
Fire tube boilers
Water tube boilers
Reheaters
Superheaters

Forced draft fan(FD)


and
ID fan:
Induced
Draft(ID)fan
The ID fan
draws gases out
of the boiler after
passing through the economiser and air
preheaters.

FD fan

The FD fan draws air into the boiler after


preheating it to fulfill the oxygen requirements
of the boiler.

ctrostatic precipitator(ES
High voltage electrodes attract the ash and flue
gas particles.
At regular intervals, the electrodes are struck
with hammers to throw off the ash particles.
This is used to clean up the flue gas or smoke
sent up the chimney.

Economizer
The economizer draws the heat out of the flue
gas and uses it for heating the feed water
It is placed in the passage of flue gases in
between the exit from the boiler and the entry
to the chimney.
It saves the coal combustion, increases steam
rate and improves boiler efficiency.

Cooling Towers
The condensate (water) formed in the condenser
after condensation is initially at high temperature.
This hot water is passed to cooling towers.
It is a tower- or building-like device in which
atmospheric air (the heat receiver) circulates in
direct or indirect contact with warmer water (the
heat source) and the water is thereby cooled.
Types Of Cooling Tower Wet cooling tower
Dry cooling tower

Electric Substation

What is a Substation?
Asubstationis a part of an electricalgeneration,
transmission, anddistributionsystem. Substations
transformvoltagefrom high to low, or the reverse,
or perform any of several other important
functions. Between the generating station and
consumer, electric power may flow through several
substations at different voltage levels.
Substations may be owned and operated by an
electrical utility, or may be owned by a large
industrial or commercial customer. Generally
substations are unattended, relying onSCADAfor
remote supervision and control.

Single-line Diagram of
alyaneshwari Sub-statio

220KV SYSTEM (12 BAYS)


1)
2)
3)
4)
5)
6)

220KV LINES: L#228(KALYANESWARI-MTPS)


L#229(KALYANESWARI-MTPS)
L#203(KALYANESWARI-CTPS)
L#204(KALYANESWARI-CTPS)
L#217(KALYANESWARI-PGCIL,
PITHAKARI)
L#218(KALYANESWARI-PGCIL,
PITHAKARI)

BUS COUPLER: - 02 NOS.


BUS TIE BAY:-01NO.
132KV SYSTEM (11 BAYS)
132KV LINES: 1) L# 18(KLN-KLP)
2) L# 19KLN-KLP)
3) L# 68(MHS-KLN)
4) L# 69(MHS-KLN)
5) MAL-IMPEX FDR (CD 61MVA)

AUTOTRANSFORMERS:

ATR#1CGL MAKE 150MVA, 220KV/132KV


ATR#2 CGL MAKE 150MVA, 220KV/132KV
ATR#3 BHEL MAKE 150MVA, 220KV/132KV
AUTOTRANSFORMERS: 1) ATR#1CGL MAKE 150MVA, 220KV/132KV
2) ATR#2 CGL MAKE 150MVA, 220KV/132KV
3) ATR#3 CGL MAKE 150MVA, 220KV/132KV

AUTOTRANSFORMERS: 1) ATR#1CGL MAKE 150MVA, 220KV/132KV


2) ATR#2 CGL MAKE 150MVA, 220KV/132KV
3) ATR#3 CGL MAKE 150MVA, 220KV/132KV
1)
2)

50 MVA, 132/33KV, APEX MAKE.


31.5MVA, 132/33KV, TELK MAKE.

SUBSTATION PARTS AND


EQUIPMENT

OUTDOOR
SWITCHYARD

BUSBARS
POWER TRANSFORMERS AND MEASUREMENT TRANSFORMERS
INSULATORS
CIRCUIT-BEAKERS & ISOLATORS
LIGHTNING ARRESTORS
GALVANISED STEEL STRUCTURES FOR TOWERS & EQUIPMENT SUPPORTS.
ROADS, RAILWAY TRACK, CABLE TRENCHES
PLCC EQUIPMENT INCLUDING LINE TRAP, TUNING UNIT, COUPLING CAPACITOR, ETC.
STATION EARTHING SYSTEM COMPRISING GROUND MAT, RISERS, AUXILIARY MAT,
EARTHING STRIPS, EARTHING SPIKES & EARTH ELECTRODES.
CONTROL CABLES FOR PROTECTION AND CONTROL
INCOMING & OUTGOING LINES

CONTROL BUILDING
IN EVERY SUB-STATION CERTAIN SUPERVISION, CONTROL AND PROTECTION FUNCTIONS
ARE NECESSARY. SO A CONTROL BUILDING/CONTROL ROOM IS REQUIRED. THE RELAY
AND PROTECTION PANELS AND CONTROL PANELS ARE INSTALLED IN THE CONTROL
ROOM.
CONTROL IN SUB-STATION ARE OF TWO CATEGORIES.

Functions of control room


department(CLD)
TRANSFORMERS PRESENT IN KALYANESHWARI SUBSTATION
150 MVA 220/132KV AUTO-TRANSFORMER
Make BHEL
Year of manufacture: 2003
Type of cooling: ONAN/ONAF/OFAF
Rating HV & LV (VA)- 75/ 105/ 50
( 50%/75%/100%)
Rating LV - 10/ 14/20
(50%/70%/100%)
Temp rise oil- 40 C (Over Ambient of 50 )
Temp rise winding- 45 (Over Ambient of 50 )
Purchase order Ref- PE-SPEC-719(R)/581257
Dated 03.12.02
Maker Sl No- 6006080
Elect Spec No- 601098
Phase 3
Frequency 50 Hz
Connection Symbol- YNa0d1
Impedance Volt at 150MVA Base
HV Position (1/IV)12.6% to 16.24%
HV Position (9b/IV)
14.1% to 15.5%
HV Position (17/IV)
13% to 16.77%

No Load Voltage HV (Kv)-230


No Load Voltage IV (Kv)- 138
No Load Voltage LV (Kv)-6.9
Line Current HV (Amps)-188.5/263.9/377.0
Line Current LV (Amps)- 314.2/439.8/628.3
Line Current LV (Amps)- 837.8/1172.9/1675.5
Insulation Level:
HV- L1 950AC 395-L1 170 AC 70
IV- L1550AC 275
LV-L1 75AC 26.9
Diagram DRG No- 34631900019
OGA DRG No- 3463000066
Core and winding (Kg)- 59700
Weight of oil (Kg)- 38280
Total weight (Kg)-140365
Oil quantity (L)- 44000
Transport Weight (Kg)-79000
Undertaking weight (Kg) 59700

CURRENT TRANSFORMER (CT):

MAKE ELECTRIC POWER EQUIPMENT CO.


MSR INDUSTRIES ESTATE, BANGALORE 560054
TYPE OHCDB-R
HSV 36KV
SERIAL NO. 33193
FREQ 50 HZ.
RATED VOLTAGE 33KV
SHORT TIME THERMAL CURRENT 15.15KA FOR 3 SECS

INSULATION 70/170KV
QTY OF OIL/WT. 20 LTR./ 24 KG APRX.
DYNAMIC CURRENT 65.6 KAP
YEAR 1999
TOTAL WT. 150 KGS (APRX)
MAX. TEMP. RISE - WINDING - 45C
INSULATION A
OVER AMBIENT (45C) OIL - 40C
CONTINUOUS THERMAL CURRENT 780 A

POTENTIAL TRANSFORMER (PT):


MAKE MODERN ELECTRONIC
TYPE OPT
RATIO 33KV3 / 1103V /1103V.
HSV 36KV,
PHASE 1,
FREQ- 50 HZ
INSULATION CLASS A
CORE I
II
BURDEN - 100
100
CLASS 0.2
3P
V.F 1.2 CONT. & 1.9 FOR 30 S
CONN PH E
BIL 70/170KV
TEMP. RISE OVER WDG OIL
45C 35C
OIL QTY. 20 LTR.
TOTAL WT. 90KG
ISS 3156,
SL. NO.- ME/PT/411/08
P.O NO. CE(T)/P 4/ST BB/2087

Circuit Breakers:
MAIN FUNCTION OF CIRCUIT BREAKER IS TO SWITCH OFF AND SWITCH ON
THE NORMAL CURRENT AND TOP TRIP THE CIRCUIT AT THE OCCURANCE OF
ANY FAULT.

CIRCUIT BREAKERS USED IN THIS SUBSTATION:


MINIMUM OIL CIRCUIT BREAKER
SF6 CIRCUIT BREAKER
SF CIRCUIT BREAKER (220KV SYSTEM) DETAILS :
Type - 3AP1F1
Year of Manufacturing/No - 2006/IND/01/2276
Rated Voltage
245 kV
Rated lightning impulse withstand voltage
1050 kVP
Rated Power Freq. withstand voltage
460 kV
Rated Frequency
50 Hz
Rated Normal Current
3150 A
Rated S. Circuit breaking current
40kA
Rated S. Circuit Duration
S
Rated out of phase breaking current

Isolators:
ISOLATORS GIVE PHYSICAL SEPARATION BETWEEN LIVE
PART AND DEAD PART. PHYSICAL SEPARATION CAN BE
SEEN BY NAKED EYE FROM A DISTANCE.

Surge/Ligthning Arrestors (LA):


SINGLE POLE UNITS CONNECTED BETWEEN BUSBAR AND
GROUND. HIGH VOLTAGE SURGES CAUSED BY LIGHTNING
OR SWITCHING ARE DISCHARGED EFFECTIVELY TO
EARTH.

Bus bars:

BUSBARS ARE CONDUCTORS OF ADEQUATE


CROSS-SECTION, SUPPORTED ON INSULATORS

Switch Gear
A switchgear includes all the switching devices
It includes all devices associated with control,
metering and regulating of electrical power
system.

PROTECTION & CONTROL:


Objectives of Protection:
I) TO DISCONNECT THE FAULTY CIRCUIT WITH MINIMUM
DAMAGE DUE TO FAULT.
II) TO LEAVE THE REST OF THE POWER SYSTEM IN A HEALTHY
STATE.
III) COST OF REPAIR OF DAMAGE TO BE KEPT MINIMUM.
IV) TO RESTRICT POSSIBILITY OF SPREADING AND INVOLVING
OTHER EQUIPMENT.
V) TO REDUCE TIME THE EQUIPMENT OUT OF SERVICE.
VI) TO MINIMIZE COST OF REVENUE LOSS.
Characteristic of Protection:
I) VERY FAST
II) SELECTIVE
III) SENSITIVE
III) STABLE UNDER EXTERNAL FAULT

THANK YOU!!!!