Summary of Black spot coming under NHAI


Permanent Measures

Completed

Under
Progress

Remarks

Under
approval/
Tender

PIU-Gandhidham
1

PIU-Ahmedabad
4

2(Vasad flyover and


Hariyala Bypass)

Proposed under 6 laning of RatanpurChiloda


(Pkg-VI)
and
ChilodaAhmedabad section(Pkg-VII)

PIU-Bharuch
1

--

Construction of 4 lane
Narmada under progress

across

river

PIU-Rajkot
6

For the 3 black spot, tenders invited.


The Balance one black spot at Morbi,
decision from Ministry for taking up on
stand alone mode is awaited

Total
nos.

Tempora
ry
Measure
s
Complet
ed

Permanent Measures
Completed

Under
Progress

Remarks
Under
approval/
Tender

PIU Surat(Exp.)
11

11

6 black spots under Kamrej Chalthan.


Bids received on 11.04.2016. Under
scrutiny at NHAI HQ.
1 black spots under Surat Dahisar
section have been proposed for
improvement through underpass the
proposal of which is under approval of
HQ.

Bids received for packages-2,3,4 & 5.


DRT for Pkg-1 : 02.05.2016
DRT for Pkg-6 : 23.05.2016

PIU Somnath
2

0 (Stretch
not
entrusted
to NHAI)

--

--

Total

25

23

14

Black Spots
Sr.
NH
N
No.
o.

1
2

Location of
Black Spots

Brief
Descripti
on of
Problem
at Site

Short Term Remedial Measuress

Long term remedial Measures (Nos.) Remarks


Nature of
Nature of
Likely
Likely
Nature of Short Term
Long Term Action taken
date of
date of
Remedial Measures
Remedial for Long Term
completio
completi
required and taken
Measures
Remedial
n
on
required
Measures
PIU-Ahmedabad
Road markings,
Complete Proposed in six laning of Sep 2018 Proposal
painting
d
Chiloda to Ahmedabad
sent to
section (PKg-VII)
HQ for
approval
Rumble Strips, road Complete Proposed under 6 laning of
marking paint
d
Chiloda-Ratanpur section
(Pkg-VI)

Village
Junc. Of
Jethipura Board 6L with
Km.502.500
2L road
8 Shamlaji Town
Curve
Road
Road
Km.398.000
Near Hariyala
Y Point &
Byepass - Y
Road Markings ,Sign Complete Improvement
8
Overtaki
Junction- NH-8
Boards, Rumble Strips
d
of Junction
ng
(km. 33.500)
Village Vasad
Road Markings and
Cross Road
Junction
Complete
8
Sign Boards have been
Flyover
-NH-8 (Ch.
with SH
d
provided.
90.740)
PIU Gandhidham
Chandisar Bus
Over
Zebra Crossing on NH &
Stop NH-27 Km Speeding
Complete Construction
27
Speed breakers on
581.000,
& Cross
d
of VUP
cross roads
Banaskantha
Road

Completed

Flyover Completed

Completed

Sr. NH
No. No.

27

27

27

27

10 8D

11 8D

Short Term Remedial


Long term remedial Measures (Nos.)
Brief
Measuress
Location of Description
Likely Nature of Long Nature of Action Likely Remar
Nature of Short Term
Black Spots of Problem
date
Term Remedial taken for Long date of
ks
Remedial Measures
at Site
completio
Measures
Term Remedial completi
required and taken
n
required
Measures
on
PIU Rajkot
Shapar
Both Side
Viaduct flyover with tentative
Safety Boards, Road Complete
Veraval
Resi. Area &
cost of Rs.30.00 Crore has been Included under
Marking & Delinators
d
at 165/500
GIDC
proposed
Jetpur-GondalRibbon
PUP with tentative cost of
Rajkot
Pardi Board
Road markings and Complete
Developmen
Rs.10.00 Crores has been
improvement
at 168/500
speed limit boards
d
t
proposed.
proposal.
Tender invited.
Pardi Board
Curve &
PUP with tentative cost of
Nr. Shitla
Both Side Safety Boards, Road Complete
DIT:16.02.2016
Rs.10.00 Crores has been
DRT:03.05.2016
Temple
Resi.
Marking & Delinators
d
proposed
km167/400 Industries
A bypass for Morbi was proposed by DPR
Maliya
cross road Safety Boards, Road
Consultnat however the project was dropped.
Halvad
without
Marking, Cat eyes, Complete
Stanalone proposal for flyover at the blackspot
Cross Road
speed
Ambulance, crane
d
location is with Ministry. Decision awaited
237/460
breaker
and patrol vehicle

Village Gadu
to
Long Bridge
Safety Boards &
Complete Curve improvement along with Four laning of
Shantipura
& Curve
Delinators
d
Jetpur Somnath Section completed.
(km. 95.180Road
99+100)
Village
Junc. Of 3SH Junction improvement done as structure could not be completed due to public
Vadal board
with NH
resistance.
4

Short Term Remedial Measuress

Long term remedial Measures (Nos.)


Rem
Brief
Nature of
arks
Location
Nature of Long
Likely
Sr. NH
Description Nature of Short Term Likely date
Action taken
of Black
Term Remedial
date of
No. No.
of Problem at Remedial Measures
of
for Long Term
Spots
Measures
completi
Site
required and taken
completion
Remedial
required
on
Measures
PIU Somnath
Budhel
Presently stretch
A bypass to Budhel and Talaja villages has been proposed
12
Narrow road
village
with R&B
under the proposed 4 laning of the stretch. Work likely to
13

Talaja village Sharp curve

Department

be completed in 2018-2019
PIU-Bharuch

From L&T
Sardar
booth till the
Repair &
bridge South
The construction of new four lane
crossing of
Rehabilitation of
Sept-16
14 8
side
Completed Extra Dose Bridge and work is in
bridge only 1 Old Narmada Bridge

Ankleshwar
progress
or 2 lanes
city
existing
PIU-Surat(Exp.)
Delineators,
Bollards Pedestrian
Near Village
Both Side
marking, Median
Kim Cross
Resi. Area
opening sign board,
VUP(1X30X5.5) at
15 8
Road
Near Highway U Turn Sign board, Completed
Lindayat village
Pipodara
Due to Cross
Keep Left sign
Km.239+100
Road
board, Accident
Prone Zone board,
Included under Kamrej
Road studs
Chalthan section.
Bids received on
Flyover (1 X 40m
+ 2 X 25m) at Navi 11.04.2016. Under scrutiny.
Village
Pardi village, Km
5
Kamrej
Delinators No Entry
242.200 & Service

Sr. NH
Location of
No No
Black Spots
. .

Brief
Description
of Problem
at Site

Village
Due to Cross
17 8 Dhoran Pardi
Road
Km.244+000

Village
Without
Kholvad
Opening Cut
18 8 Cross Road
& Service
Km.246+600
Road

Village Vav to
Ribbon
19 8 Village Ubhel
Devp. And
Km.258+600
cross road
Ribbon
Devp. And
cross road
Kadodara
Bridge to
20 8
Village
Chalthan km

Short Term Remedial


Long term remedial Measures (Nos.)
Measuress
Nature of Short
Likely
Likely Rema
Term Remedial
Nature of Long Term
Nature of Action
date of
date of rks
Measures
Remedial Measures taken for Long Term
completio
comple
required and
required
Remedial Measures
n
tion
taken
PIU-Surat Expressway
Flyover (1 X 40m + 2
X 25m) at Navi Pardi
Km 242.200 &
Service Road
Work completed by median
Km241.250 shifting
242.800 (both side)
& Km 242.800 243.450 (LHS)
Delineators,
Bollards,
Service road from
Pedestrian
km 246.600 to km
marking, Sign
247.310 (LHS)
Boards (Median Complete
opening, U turn ,
d
Flyover (1 x 50m +2
Keep Left,
x 25m) at Umbhel
Accident Prone
Included under Kamrej Chalthan
village Km.258.600
Zone) Road
section.
& Service Road
studs, Storage
Bids received on 11.04.2016.
Km.258.200-259.120
lane.
Under scrutiny at NHAI HQ.
(LHS) & Km. 258.160
- 260.00 (RHS)
VUP (1 X 12m X
5.5m) at Sanjivini
Hospital Km 262.00

Long term remedial Measures (Nos.)


Nature of
Nature of Short Term
Likely
Nature of Long
Likely
Action taken for
Remar
Remedial Measures
date of Term Remedial
date of
ks
Long Term
required
completio
Measures
complet
Remedial
And taken
n
required
ion
Measures
PIU-Surat Expressway
Khadak
Khadki(km 350.920) in Pardi Taluka- provision of PUP (5m X 3m) sanctioned by HQ in 2014.
Pardi Borad
Work taken up in a phased manner starting from Maharashtra.
Sonwada(3
Proposal for construction of PuP under consideration at NHAI HQ.
24.210)
Small
Village
Divider,
cautionary sign boards
Bajipura T Without
Complete
and reflectors &
Bypass completed
Joint Km
Zebra
d
diversion sign boards.
50.780
crossing
& Cat eye
Absence
Village
of divider
Bajipura
&
Signages. Traffic
Complete
Near Sumul
Flyover completed
pedestria
Diversion
d
Dairy
n
Km 53.333
crossing
Village
Mayapur
Absence
Opp,
All signages / road
Complete
Speed
Service road completed
Seventh
marking
d
Breakers
Day School
Km 45.350

Brief
Sr. NH
Descriptio
Location of
No No
n of
Black Spots
. .
Problem
at Site
21 8
22 8

23 6

24 6

25 6

Short Term Remedial Measuress