Basic Principle
Reinforcing mesh, top
Air bubble (hollow ball)
made of (recycled) plastic
Reinforcing mesh, bottom
Helsfyr, Norwa
Advantages
Economy
Buildings can be made more flexible; changes are much less costly
Advantages
Environment
Advantages
Design
Reduced weight
Increased strength
Larger spans
Fewer columns
No beams or ribs under the ceiling
Pillars have no capital
[ Retail Roermond
[ Concerthouse, Iceland]
[ Concerthouse, Iceland]
(Product Type 1
(Product Type 2)
3. Placing balls
Fast implementation
1. Temporary supports
8. Concreting
Finalizing facades
Fast implementation
oManpower:
o
o
o
o
06
04
01
01
assemblers
helpers
crane signaler
supervisor
o Indices:
o Assemblers
= 0.0241
MH/m
o Helpers
=
0.0160 MH/m
o Signaler
=
0.0040 MH/m
o Supervisor
= 0.0040
MH/m
Productivity Slab
o Edge Formwork: Productivity = 35.84
m/day
o 02 carpenters
o 02 helpers
o 01 supervisor
o Onsite Reinforcement: Productivity =
5,632.00 Kg/day
o 06 steel workers
o 03 helpers
o 01 supervisor
o Onsite Concrete: Productivity = 143.36
m/day
o 03 masons
o 07 helpers
o 01 supervisor
o Indices:
o Carpenters = 0.4464
MH/m
o Helpers
= 0.4464
MH/m
o Supervisor = 0.2232
MH/m
o Indices:
o Steel workers = 0.0085
MH/Kg
o Helpers
= 0.0042
MH/Kg
o Supervisor
= 0.0014
MH/Kg
o Indices:
o Masons
= 0.1674
MH/m
o Helpers
= 0.3906
MH/m
o
April 2011
Hickory Developments has again chosen the BubbleDeck system - this time for
Alt at Travancore. Faced with 26 levels each of over 1,500 square meters to
build, project manager Peter Frank said:
"BubbleDeck was a clear choice due to the fast floor cycles achievable,
yielding a substantial saving in the program at a competitive price ".
BUBBLEDECK SYSTEM