HISTORICAL PAGE

PROJECT TIMELINE

DAM SITE

SECTOR POLICY

PROJECT SIGNIFICANCE

NECESSITY

NECESSITY

FEASIBILITY
STUDY UPDATE
ADDITIONAL
SURVEYS

TOPOGRAPHICAL SURVEY

GEOLOGY, GEOPHYSICAL SURVEY

SEISMIC HAZARD ASSESSMENT

OPERATIONAL REGIME

PROJECT OPTIMIZATION

HYDROLOGY AND METEOROLOGY


STUDY

ACCESS ROAD ROUTE OPTIMIZATION

DETAIL DESIGN OF ACCESS ROAD AND


BRIDGE

TRANSMISSION LINE ROUTE


OPTIMIZATION

DETAIL DESIGN OF TRANSMISSION


LINE

ICE ISSUE STUDY

IMPACT ON LAKE OF BAIKAL

IMPACT ON LAKE OF BAIKAL

TECHNICAL
SPECIFICATI
ON

MAIN CHARACTERISTICS

TECHNICAL SPECIFICATION

OPERATION REGIME

IMPLEMENTATION SCHEDULE

ENVIRONMENT
AL AND
HERITAGE
STUDIES

FISH AND AQUATIC FAUNA PROTECTION STUDY


FISH PASSAGE DESIGN AT CROSS-RIVER OBSTACLES EXPERIENCE
FROM DIFFERENT COUNTRIES, WITH POTENTIAL RELEVANCE TO
MONGOLIA WORKSHOP

COMMON SPECIES

AGREED TO SELECT CATCH AND CARRY METHOD WHICH IS MORE


SUITABLE FOR FISHS PASS UP AND DOWNSTREAM MOVEMENT.
Participants from Germany,
Austria,
France
and
Mongolia:
- Experts on fish passage
facilities;
- Biologist-ichthyologist;
- Environmental specialists.

Taimen

Lenok

White
fish

Perch

Grayling
Pre-construction
study

Construction period monitoring


study

Pike
Fish and aquatic fauna
protection study
started
since
May
2014
in
cooperation with the Taimen
Conservation
fund
of
Mongolia.

5-7 years

Post-construction
study

FOREST
STUDY

PLANTS
STUDY
423 species of plants grow at
the Egiin gol project site.
The 5 species of rare and 4
species of very rare plants were
registered in the proposed
reservoir area, however these
species are distributed in other
areas of Mongolia.

2664 ha forest resources.


Transfer 6 ha younger tree.
Clearance 14 ha fallen tree and burnt
tree.
Forestry offset and afforestation costs
are included in Environmental
management plan.
Using the aerial photographs.

FAUNA
STUDY

SOIL AND WATER QUALITY


STUDY
Field study completed and extracted soil
sample. Soil laboratory testing has been
conducted by Soil laboratory of Institute of
Geography, MAS.

42 SPECIES OF
MAMMALS

3 SPECIES OF
REPTILES

267 SPECIES OF BIRDS

2 SPECIES OF
AMPHIBIANS

The
expected
changes
will
not
impact
significantly for proposed project area's terrestrial
animal species habitat availability and their
migration and nutrition.

The water quality analysis performed by


Institute of Geoecology, MAS.

NATIONAL MUSEUM
ULAANBAATAR
UNIVERSITYOF HISTORY
INSTITUTE
UNIVERSITY OF
SCIENCE AND
INSTITUTE
TECHNOLOGY
OF
ARCHAEOLOGY

230
230 RESCUED
RESCUED in
in
2014
2014
5
5 TEAMS
TEAMS
TOTAL
TOTAL 312
312 FINDINGS
FINDINGS
PROJECT
PROJECT RESERVOIR
RESERVOIR

230
230 RESCUED
RESCUED in
in
2014
2014
5
5 TEAMS
TEAMS
TOTAL
TOTAL 312
312 FINDINGS
FINDINGS
PROJECT
PROJECT RESERVOIR
RESERVOIR

230
230 RESCUED
RESCUED in
in
2014
2014
5
5 TEAMS
TEAMS
TOTAL
TOTAL 312
312 FINDINGS
FINDINGS
PROJECT
PROJECT RESERVOIR
RESERVOIR

EXHIBITION
EXHIBITION 2014
2014
230
230 RESCUED
RESCUED in
in
2014
2014
5
5 TEAMS
TEAMS
TOTAL
TOTAL 312
312 FINDINGS
FINDINGS
PROJECT
PROJECT RESERVOIR
RESERVOIR

SOCIAL IMPACT: Resettlement


People:
People: 300
300
Properties:
Properties: 246
246
Agricultural
Agricultural area:
area:
1840
ha
1840 ha
Khantai
Khantai bagkh
bagkh
center
center

In relation to EGHPP project implementation, working


group for the resettlement of the community of Khantai,
environmental
issues,
land
affair
arrangement
responsibilities has been established.
After conducting survey among the community, the new
Khantai community center has been identified and it is
located 4 km from the current center which is called the
Damirangiin enger.

SOCIAL IMPACT: Local community cooperation


PIU and Working Group, collaborates
closely with local community and
authorities.
THE SCOPE OF WORK:
Organized Public Khural of Khantai Bagh
Organized trip to existing HPP of
Mongolia for local representatives of
Khutag-Undur soum and Khantai bagh
Property census
Supports the local employment

Received land acquisition for the


construction area of HPP and infrastructure
route from Bulgan and Orkhon aimags
soums.

SOCIAL IMPACT: Survey


PIU conducted social surveys for purpose of providing
information and made observation on opinion about HPP,
focus group meeting and questionnaire among the
targeted local residents.
The result of focus group questionnaire represented that
insufficient information on renewable energy and HPP
among the 1250 people who were from urban and rural
community.
PIU has been developing detailed plan to cooperate with
the mass media such cognitive TV programs to give
general understanding about the hydropower plants.
Thus targeted groups understanding about HPP and
renewable energy have more accurate and positive
attitudes.

ENVIRONMENTAL IMPACT
ASSESSMENT

Detailed EIA of both EGHPP


and
transmission
line
corridor were performed
separately
and
got
approved by MEGD in
2014.

RENEWABLE ENERGY
- Reduction of air pollution
- Climate change mitigation
- Green development
- Clean energy

The detail environmental


studies and impacts were
assessed based on this
assessments
and
Environmental
Management
Plan
was
developed.

GREENHOUSE
GAS

The potential positive and


negative impacts were
evaluated in compliance
with the Mongolian EIA
laws and regulation and
International standards.

FRESHWATER
RESERVE

- Reduction of coal
consumption annually by
200 thousand tnn

- Constantly circulating
5,6 billion cubic meter

- Reduction of greenhouse
gas emission by 709
thousand tnn

- Protection from
desertification

- Humid climate

The costs associated with


EMP
measures
and
reclamation activities are
reflected in total cost of
EGHPP.

TOURISM
CENTER
- Tourism hub
- Pleasant natural condition
- Water sport
- Fish farming potential

ECONOMIC
AND
FINANCIAL
ANALYSIS

PREVIOUS COST STUDIES

PROJECT COST ESTIMATION

BUDGET COMPARISON

BUDGET COMPARISON

ECONOMIC ANALYSIS