The Padma Bridge

Padma Multipurpose Bridge


The Padma Bridge is a multipurpose roadrail bridge across the Padma River to be
constructed in Bangladesh. It will connect
Louhajong, Munshiganj to Shariatpur and
Madaripur, linking the south-west of the
country, to northern and eastern regions.
The two-level steel truss bridge will carry a
four-lane highway on the upper level and a
single track railway on a lower level.

The Whole Project of Padma


Bridge

The 3D Model of The Padma Bridge

Overview of Padma Multipurpose


Bridge Project

Overview of Padma Multipurpose


Bridge Project
The detailed design of the Padma Multipurpose Bridge

is being delivered by a team of international and national


consultants headed by AECOM (New Zealand).
The Project comprises two phases.
1. Phase 1 of the Project includes the Design Phase.
2. Phase 2 is the Construction Phase.
. Detailed design of the main bridge was carried out in
AECOM's Hong Kong office.

Overview of Padma Multipurpose


Bridge Project
Component

of the Project:

Main Bridge (6.15 km long):

Contractor : China Major Bridge Engineering Co. Ltd, China.


Contract Cost : BDT: 12,133.39 crore.
River Training Works(14 km length):
Contractor : Sinohydro Corporation Limited, China.
Contract Cost : BDT: 8707.81 crore.
Janjira Approach Road & Selected Bridge End Facilities (10.5
km length):
Contract Cost : BDT: 1097.40 crore.

Overview of Padma Multipurpose


Bridge Project
Mawa Approach Road & Selected Bridge End Facilities

(1.5 km length):
Contract Cost : BDT: 193.40 crore.
Service Area-2:
Contractor : Abdul Monem Ltd.
Contract Cost : BDT: 208.71 crore.
Environment:
Tree plantation has been started from 2012 and 55150 nos.
of tree plantation has been completed up to-date

Overview of Padma Multipurpose


Bridge Project
Land Acquisition:

Land has been acquired 1408.54 hectre.


CSC(Main Bridge & RTW):
Consultant : Korea Expressway Corporation, South Korea & Associates.
Contract Cost : BDT: 383.15 crore.
CSC(Approach Road & Service Area):
Consultant : Special Works Organization(SWO-West), Bangladesh Army
in association with BRTC & BUET.
Contract Cost : BDT: 133.49 crore
Engineering Support & Safety Team(ESST):
ESST : Bangladesh Army.
Contract Cost : BDT: 72.14 crore.

Financing

Financing
Project cost is estimated to be US$3.00 billion. The
Padma Multipurpose Bridge (PMB) project was designed
to be funded by donors such as the World Bank, Japan
International Cooperation Agency (JICA), Asian
Development Bank (ADB) and Islamic Development
Bank (IDB). After a scandal of alleged corruption by some
people associated with project preparation the World Bank
withdrew its commitment and other donors followed. The
project is now being funded from own resources of
Government of Bangladesh.

Financing

Controversy

Controversy
From the beginning the Padma bridge negotiation

has been involved to corruption and conspiracy.


The World Bank stated that they found, "credible
evidence corroborated by a variety of sources
which points to a high-level corruption
conspiracy among Bangladeshi government
officials.
For the corruption, the World Bank turned down
to sanction the proposed loan for constructing
the bridge.

Controversy
The World Bank said that, it is their responsibility

to make sure IDA resources are used for their


intended purposes.
The World Bank has decided to cancel its $1.2
billion IDA credit in support of the Padma
Multipurpose Bridge project.
In these circumstances World Bank imposed
some conditions to continue the loan talk with the
government.

Padma Bridge Construction Project

Padma Bridge Construction Project


The construction of the main structure of the
Padma bridge takes off on Saturday with Prime
Minister Sheikh Hasina scheduled to inaugurate the
river training work and construction of the main
bridge on that day.
Once completed, the 6.15 km bridge will establish
direct road communication between Dhaka and 19
southern districts of the country. It will have a
railroad as well.

Padma Bridge Construction Project


Apart from bridge construction, the project

will also involve construction of 12.1 km of


approach roads (1.6 km on Mawa side and
10.5km on Janjira side), toll plazas, and
facilities for dredging and river bank
protection. River control works are under way.

Time based work plan and


achievement

Time based work plan and


achievement
Main Bridge
Work start date according to work plan: November 2014
Work end date according to work plan: November 2018

River Training Work (RTW)


Work start date according to work plan: November 2014
Work end date according to work plan: November 2018

Construction Supervision Consultant-2 (CSC-2) for

Main Bridge & River Training Works


Work start date according to work plan: November 2014
Work end date according to work plan: November 2019

Time based work plan and


achievement
Janjira Approach Road
Work start date according to work plan: October 2013
Work end date according to work plan: October 2016

Service Area-2
Work start date according to work plan: January 2014
Work end date according to work plan: July 2017

Construction Supervision Consultant-1 (CSC-1) for

Approach Roads & Service Area-2


Work start date according to work plan: January 2014
Work end date according to work plan: July 2017

Time based work plan and


achievement
Resettlement activities(Compensation and plot

handed over)
Work start date according to work plan: October 2013
Work end date according to work plan: October 2018

Environment
Work start date according to work plan: June 2009
Work end date according to work plan: June 2020

Land Acquisition
Work start date according to work plan: August 2006
Work end date according to work plan: June 2015