Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
CPPA
Chief Engineer
Settlement
Deputy G. M.
Finance
Manager Tech
(3)
Manager Tech
(2)
Manager IT
(2)
Manager
(4)
Manager HR&A
(4)
D.M (5)
A.M (5)
D.M (4)
A.M (4)
D.M (4)
A.M (4)
D.M (7)
A.M (13)
D.M (2)
A.M (2)
Manager L&CA
(4)
CPPA
Vision
Pakistan has the immense potential to emerge,
sustain and be acknowledged as the best
electric power market, in South Asia, facilitating
win-win-win situation for investors,
customers as well as utility professionals.
CPPA
Mission
We undertake to procure each
unit of electricity produced from
different sources and to sell it to
DISCOs and bulk consumers to
offset the prevailing demandsupply contrast.
CPPA
Strategic Goal
CPPA to be acknowledged as a
trusted, professional and efficient
agency owing to its internationally
accepted working procedures, nondiscriminatory and transparent
business operations, and excellent
performance standards.
55
CPPA
Objectives
1. Ensure verification of invoices from
generators (IPPs, GENCOs and WAPDA
Hydel plants)
2. Execute settlement functions (Billing to
DISCOs and bulk consumers including KESC
under NEPRA determined mechanism)
3. Monitor functioning of different role players
(Generators, NTDC and Purchasers);
suggest changes in the SOPs
4. Enter into Energy Purchase Agreements with
sponsors of RE projects
CPPA
Core Responsibility
CPPA is primarily responsible
for purchasing power from all
Hydel
The
Natu rmal ral G
as
al Oil
rm ce
e
Th rna
Fu
al
m
r
er
Th uclea
-N
Th
- C erm
oa al
l
Renewable
CPPA
CPPAs Functions
1. Manage networking of CDPs for collection of energy data
2. Monitor functioning of meters installed at CDPs with grid
errors
4. Establish Operating Committees, Metering Committees
CPPA
CPPA
Location
Capacity (MW)
COD
156
17-03-09
Morgah, Rawalpindi
214
18-12-09
Ghottki
217
27-03-10
Sahiwal
209
30-04-10
Kasur
209
24-05-10
Kasur
195
09-06-10
Kasur
195
21-07-10
Shiekhupura
209
05-10-10
Faisalabad
196
13-01-11
10 HUBCO Power
Narowal
214
22-04-11
Daharki
178
17-05-11
Bhikki, Sheikhpura
209
25-06-11
Total :
10
2,402 MW
CPPA
Location
Capacity
(MW)
Expected
COD
Daharki
126
Dec 2013
Dera Murad
Jamali
375
Dec 2013
Total :
11
710 MW
CPPA
Renewable Perspective
1. Coordinate NEPRA for:
Issuance of Generation Licenses
Tariff determination
2. Maintain close liaison with AEDB on:
Capacity building on Renewable Energy (RE) technologies
Actualizing of CER for RE Projects
3. Development of RE projects
4. Support DISCOs, Punjab Power Development Board and AJK
Power Development Board for developing of small hydro
power projects
5. Draft and negotiate EPAs with sponsors
6. Manage EPAs of completed projects
12
CPPA
13
CPPA
Tariff
(US$ C/kWh)
Anticipated
COD
49.5
16.109
Jan 2012
56.4
13.3456
Mar 2013
50
14.1164
Jun 2013
50
14.1164
Jun 2013
49.5
13.9399
Jun 2013
50.0
11.870
Aug 2013
49.5
11.920
Oct 2013
Yunus Energy
49.5
17.3672
Oct 2012
IPP Name
14
CPPA
IPP Name
Capacity
Location
Anticipated COD
Tech Access
10 MW
Punjab
China IW&EC
50 MW
Bahawalpur,
Punjab
Interconnection Study in
progress
DACC Power
Generation Co.
50 MW+
2,200 MW
Cholistan,
Punjab
Roshan Power
(Pvt.) Limited
10 MW
Kasur, Punjab
Sanjwal Solar
Power
1 MW
Sanjwal
PEC
356 KW
Islamabad
15
CPPA
16
CPPA
17
CPPA
18
CPPA
19
CPPA
20
CPPA
21
CPPA