WELCOMES
I. A. & A. S.
&
Principal Director of Commercial
Audit & Ex-Officio, MAB, Ranchi
BPSCL - INTRODUCTION
Bokaro Power Supply Company Pvt. Ltd. got incorporated on
17.08.2001 by the Company Registrar of Delhi & Haryana
under Companies Act 1956.
DVC and SAIL agreed that they will participate in the Equity
Shares Capital of BPSCL in 50:50 ratio and fully co-operate
to manage its business and affairs in good faith.
It has been agreed between SAIL & DVC that BPSCL shall
maintain the Captive Status of the SAIL Power Plant so
assigned to it by SAIL and SAIL shall purchase the entire
Power and Steam generated there from subject to the
provisions of the Power and Steam purchase Agreement DT: 18.09.2001 entered into SAIL and BPSCL.
CHAIRMAN
(Nominated by DVC)
DIRECTORS (02)
(Nominated by DVC)
DIRECTORS (03)
(Nominated by SAIL)
FUNCTIONAL HEAD
CEO
(Appointed by the
Board)
BPSCL MANPOWER
Existing Manpower strength of BPSCL
Executive Cadre:Sanctioned Strength: 318
Existing*: 220
Existing*: 89
*as on Feb16.
CAPACITY
BOILERS
3 x 260 =
780 T/Hr
1 x 300 =
300 T/Hr
8)
2180 T/hr
TURBO GENERATORS
1 x 12
2 x 55
3 x 60
1 x 36
=
=
=
=
12 MW
110 MW
180 MW
36 MW
>
BOILER DETAILS
UNIT
DATE OF
COMMISSIONING
Boiler #
17.04.1972
1
Boiler #
14.07.1972
2
Boiler #
06.06.1974
3
Boiler #
15.07.1978
4
Boiler #
23.06.1980
5
Boiler #
14.11.1985
Capacity
(Tph)
Running
Hours
T-156
220
3,36,924
T-156
220
3,35,528
T-156
220
3,27,771
T-156
220
2,90,388
T-156
220
2,86,029
OPG-260
260
Type
(Till 29.02.16)
UNIT
T.G # 1
T.G #2
T.G #3
T.G #6
T.G #7
DATE OF
COMMISSIONING
Type
31.12.197
P-12-90-
4
13.07.197
37
2
13.10.197
3
25.01.198
6
16.09.198
8
Capacity Running
Hrs
(MW)
(Till 29.02.16)
12
3,08,486
K-50-90-4
55
3,35,641
K-50-90-4
55
3,21,866
9K-66
60
1,84,781
9K-66
60
1,64,919
BRIEF DESCRIPTION
The entire Power Plant has come in three phases i.e.
BRIEF DESCRIPTION
Besides Power Generation, BPSCL supplies Steam to
BSL
Steam at 100 ata pressure 540 0 C is being supplied to Turbo
Blower Station to run the turbo blowers (8 Nos.) for Blast
Furnace. This steam is being tapped from the 100 ata main
steam headers of the power plant. All the boilers feed the
100 ata steam to 100 ata steam headers.
Steam at 39 ata pressure 420 - 440 0 C is being supplied to
Turbo Blower Station to run Turbo Compressors(4 Nos.) for
Oxygen Plant and to exhauster of Coke-Oven. This steam is
being tapped from the 39 ata steam headers. There are two
sources of this steam,
Tapped from extraction of BPTG of TG #1 at 39 ata.
Tapped from 100 ata main steam headers through
HSPRDUs which reduces the pressure of steam from 100
ata to 39 ata.
Steam at 8-12 ata pressure & 240 - 220 0 C is being supplied
to Blast Furnace , HRM, CRM, RMP, SMS and different shops
(Condensate of this process steam is not returned to the
power plant). This steam is being tapped from
BRIEF DESCRIPTION
TO
STEEL
PLANT
(PROCE
SS
STEAM)
1
PRDUs OF CPP
PRDU 2
PRDU 1 PRDUS OF TPP
To TBS
PRDU 4
To TBS
220
T/H
.BLR
BLR 3
220
T/H
220
T/H
TG 1
HPRDU 1
To TBS
&
CO-OVEN
BLR 4
220
T/H
TG 2
HSPRD
U2
39 ATA/440 C
0
39
ATA/4400
BLR 5
220
T/H
BLR 6
260
T/H
BLR 7
BLR 8
BLR 9
260
T/H
260
T/H
300
T/H
TG 6
TG 3
HSPRD
U3
TG 7
6 ATA
PRDU
3
TG 8
HEATING
STEAM
TO
DEARAT
OR
TG 9
39 Ata
Steam
Extraction
21 T/HR
BLR 1
36 MW BPTG
8 12 ATA / 4400C STEAM
OUTLET 79 T/HR
EVACUATION OF POWER
All the Turbines are connected with 11.5 KV
FUELS USED
All the boilers in BPSCL are multi fuel fired boilers.
COAL
FURNACE OIL
BLAST FURNACE GAS
COKE OVEN GAS
NEW INITIATIONS
&
HIGHLIGHTS
IN
FINANCIAL YEAR
2015-16
PERFORMANCE HIGHLIGHTS
BPSCL is on the verge of breaking the annual
power generation record. The last generation record
was of 175 MW in the year 2006-07. In the current
Financial year, the annual power generation is 196
MW till date.
FUTURE
INITIAVES PLANNED
FOR
FINANCIAL YEAR
2016-17
FINANCIAL PARAMETERS
BPSCL - INTRODUCTION
Bokaro Power Supply Company Private Limited (BPSCL)
started business on 18.09.2001 when SAIL has assigned
its business pertaining to the captive power plant of 302
MW Capacity
with
with following Financial parameters: Total Fixed Assets value at Rs. 560 crore.
Debt Equity ratio of 70:30
Authorised Equity share capital of Rs. 1200 crore.
Issuied & Paid up Capital of Rs 168.05 crore.
Transfer its store (Depo 58) as Working capital loan
carrying
BPSCL - INTRODUCTION
SAIL and BPSCL signed a Power Purchase Agreement (PPA) on
18.09.2001 and mutually agreed for supply of entire generated
steam and power to SAIL by BPSCL, on cost plus basis with
following financial parameter:BPSCL raises its bill to SAIL by 7th day of each month
SAIL reimburses all the operating expenses to BPSCL, like: Cost of coal, furnace oil water consumed
Salary Expenses
Repair & Maintenance cost
Stores & spares consumed
SAIL also reimburses following to BPSCL, like: ROE(Return on Equity) @ 15.5%
Incentive @ 2%
Interest on Normative working capital and
Depreciation on its Fixed assets.
Surcharge on late payment @ 2% per month
Sales ( in Lakhs)
*Gross profit including Income Tax but excluding Depreciation & Interest cost
EXPANSION PROJECTS
2x250 MW PROJECT
1.
Right to Use for 900 acres of land given by BSL to BPSCL on 21.03.07.
2.
3.
Final LOI placed on MECON for Project Engineering and Consultancy Services on
04.08.08.
4.
5.
7.
All Statutory Clearances such as Chimney Height Clearance from Airports Authority of
India, Defense Clearance from Ministry of Defense, Water Allocation from DVRRC,
Permission for transmission of Power from JSERC & Permission for setting up of Railway
Siding Facility from S.E Railways have been obtained.
8. Right of Use of land withdrawn by BSL on 25.11.10 & re-issued by BSL on 10.01.13.
9. LOA for Coal Linkage withdrawn by CCL on 08.03.11.
11. Possession letter of 836 acres of land (transferred by State Government to SAIL) and
map thereof provided by BSL to BPSCL on 25.01.13.
12. Details of GM Land and Forest Land (transferred by State Government to SAIL) provided
by BSL to BPSCL on 25.01.13.
13. Meeting held among State Government officials, BPSCL and villagers in the presence of
SDO, Chas on 08.02.14. It was decided in the meeting that a committee shall be formed
by the State Government for facilitating the construction of Boundary Wall around the
proposed site.
THANK YOU