consumption
in Piping Isometric
Production By
Optimizing the Flow
Process
Definition- Piping
Isometric
Piping isometric is the Engineering
drawing which used to purchase the
Relevant material and Fabricate the
pipe and fittings based upon
Piping Layout
It indicates Material code, Weld,
Support marks and From-To
Continuation.
It use to fabricate and Erect the Pipe in
the site.
CONSTRAINT
Piping Isometric production is the Major
& Vast Process in Piping Design
After finished the 60% design review
and Completed the Major design work,
Isometric have to be start.
PROBLEM
Time consuming to Issue the
Isometrics as a Deliverable
Objectives
Minimize the time Consumption in
Isometric Production
Improve the Isometric Flow Process
CHECKER`S CHECKING
PROGRESS
If any instrument
available
STRESS FOR SUPPORT
MARKING
YES
TO INSTRUMENTATION, (1
HR)
NO
BACK MODELLING BY
DESIGNER
2
TO MTO CHECK
1
MTO CORRECTION BY
DESIGNER
Brain Storming
A Brainstorming session was held with
Lead, Area Lead, Engineers & Designers
in order to minimize the time
consumption in Isometric Production &
optimizing the Process flow.
Opinions & Suggestions were resulted
from the below table (Brainstorming
session), out of which, High and
Moderate causes have been taken
based on past Project Experience for
Cause and Effect Diagram.
More time
Consumption
in Isometric
Production
Survey - sample
Survey - sample
CHECKER`S CHECKING
PROGRESS
If any instrument
available
YES
TO INSTRUMENTATION, (1
HR)
NO
BACK MODELLING BY
DESIGNER
2
TO MTO CHECK
1
MTO CORRECTION BY
DESIGNER
0.5
CHECKER`S CHECKING
PROGRESS
3.5
BACK MODELLING BY
DESIGNER
2
CHECKER`S CHECKING
PROGRESS
INCLUDING INSTRUMENT
AND
MTO CHECKING
3.5
BACK MODELLING BY
DESIGNER
2
COMPLETE CHECKING BY AN
AREA ENGINEER INCLUDING
SUPPORT, INSTRUMENTS &
MTO
1
TIME DURATION.
Implementation
Proposed flow Process has been Passed to
Management level thro Lead Engineer
Explained about the New flow Process and Time
Reduction.
Before starting the isometric issue process over
all meeting to be conducted about describe the
New flow process by Lead engineer.
Do`s & not Do`s to be discussed.
After high level Discussion, New Process Would be
Considered and implemented in the next Project.
Conclusion
Isometric Flow is Improved with out any Technical
Ingredients Loss.
By Flow process improvisation Time Reduction
Takes place while issuing the Isometrics.
This Leads to save Man hours
Ultimately it Reduces the Project Cost.