Northrop Grumman
A Black Belt candidate was able to:
Direct
Directproject
projectsavings
savingsat
at$1.4
$1.4million
millionfirst
firstyear.
year.
Measure
Analyze
Improve
Control
Northrop Grumman
A different Northrop Grumman Black Belt candidate was able to:
Goal: Seek radical improvements in soldering processes of power
supply component to alleviate scrap and rework
Applied analytical tools uncovered significant process improvement
opportunities during solder/attach process that allowed continued
design to meet all customer specifications.
Robust
Robustattach
attachprocesses
processessaved
saved$1.3
$1.3million
million
Measure
Analyze
Improve
Control
Caterpillar
Corporation
At Caterpillar, a Black Belt applied the tools of Six Sigma to:
Goal: Reduce the total scrap and rework costs due to improper welds of its
hoist cylinder assemblies used in its off-highway trucks by 80%.
Applied analytical tools uncovered significant issues pertaining to low heat
being applied during the welding process. Designed experiments were used to
validate the identified issues and implemented to optimize the welding process.
Improved
Improvedprocess
processsaved
saved$384,000
$384,000annually
annually
Measure
Analyze
Improve
Control
Improved
Improvedinspection
inspectionprocesses
processessaved
saved$511,000
$511,000
Measure
Analyze
Improve
Control
EG & G
Four Black Belt candidates initiated a project to quickly
destruct stored nerve and blister agents.
Applied tools of Six Sigma to reduce number of furnace
hours by 235.
Project
Projectsavings
savingsestimated
estimatedat
at$1.2
$1.2million
millionfirst
firstyear.
year.
(235
(235hours
hoursxx$5,200/hr.)
$5,200/hr.)
Measure
Analyze
Improve
Control
Timken
Company
Goal: Reduce significant cycle and processing times between different
manufacturing phases of bearings
Critical measurement system implemented; key analysis identified tooling
and gage manufacturing as best choice for improvement opportunities
Combined
Combinedelimination
eliminationand
andredesign
redesignof
oftooling
toolingitems
itemsat
at
critical
criticaloperations
operationsreduced
reducedprocessing
processingby
by35%
35%--$681,000
$681,000
annual
annualcost
costsavings.
savings.
Measure
Analyze
Improve
Control
Buckhorn Rubber
Goal: Inadequate on-time delivery performance fallen to levels where
customers have indicated dissatisfaction. The goal was to reduce the
number of days from order entry of injection molded products to shipment,
by 50% and NOT affect delivery performance
Full scope of Six Sigma methodologies and techniques utilized to attack
and eliminate inefficiencies in order scheduling and packing.
Result
Resultof
ofSix
SixSigma
Sigmaactivities
activitiesrealized
realizedannualized
annualizedcost
cost
savings
savingsof
ofnearly
nearly$1.225
$1.225million
millionin
inshipment
shipmentgains
gainsand
and
increased
increasedcustomer
customerbusiness.
business.
Measure
Analyze
Improve
Control
Page 8
Annualized
Annualizedsavings
savingsof
ofcycle
cycletime
timereduction
reductionestimated
estimatedat
at$1.6
$1.6
million
millionat
at60%
60%reduction
reduction
Measure
Analyze
Improve
Control
Page 9
500,000
50%
Average +68%
Improvement
75%
200,000
150,000
Defects PPM
300,000
98%
75,000
January
February
March
April
Analyze
Improve
Control
Allied
Signal
Implemented in 1994 for operations excellence
Initial 4-month implementation; 600 projects reduced defects 68%!
Saves $175 million on bottom line in 1995--$1.2 billion in 1996
Savings noted did not include overhead, inventory, indirect charges--total impact is even larger
Expects
Expectsto
tosave
save$1.8
$1.8billion
billionannually
annually(6%
(6%of
ofsales
salesrevenue)
revenue)
linking
linkingto
toproduct
productdesign
designand
andcustomer
customerservice.
service.
Measure
Analyze
Improve
Control