Objectives
Approval authority
BOP stack arrangements - Drilling Operations
Manager with notice to Drilling Technical Manager
All other issues - Field Drilling Manager
4-Surface Well Control Equipment Policy & Procedures
Corporate wide
Diverter Policy
Mandatory when:
offshore and no BOP nippled up
onshore if shallow gas expected
Minimum WP:
200 psi (land rigs)
300 psi (offshore, barge)
Flow Line
Closing times:
20 or less, 30 seconds or less
> 20, 45 seconds or less
Diverter
To Trip
Diverter
Tank Line Valve
Diverter Line
Full-Opening Valves
(automatically opens when
diverter closes). Gate valves
ok. Ball valves are best. No
guillotine valves allowed.
6-Surface Well Control Equipment Policy & Procedures
Diverters
Annular
Drill Pipe
Drill Pipe
Blind
Blind
Drill Pipe
Annular
Annular
Drill Pipe
Annular
Blind
Drill Pipe
Drill Pipe
Drill Pipe
Drill Pipe