• Pros • Pros
– Customer Driven
– Upfront planning provide reference
– Chaotic in nature
at any stage for project status. – Iterative confidence buildup
– Resources known and managed – Change agility
– Developer decision for design
– Control through Chain of command
– Ensured Quality and
– Managed risks – Business value game
– Formal Nature – Collaborative Customer Relation
– Iterative development and deployment
– Lesser no of experts in Team
– Testing is also iterative so can’t be squeezed
– Only pre agreed deployment. – Automated test suit is not time expensive
– End Date estimation – Value of product becomes evident during
development a and closure of project does not
• Other points change on result in desperation for any party
Sequential Parallel
• Establish design • Each member works on task
at hand and design a
objectives. solution.
• Prepare HLD • High level design is
discussed in Requirements
• Prepare system review each time.
component list. • Design how to re-factor or
• UI design. create a skeleton.
• Interfaces and modules up
•Requirements review is conducted on the
to routine level. start of each Iteration.
•Testable Task specification against
• Reports. requirements.
• Navigation details. •Prioritize tasks.
•Estimate tasks.
• Help and error messages. •Allocate tasks.
•Create test scenarios. (may even write
• Prepare STP and STS. test before development)
Design LowLevel
Sequential Parallel
• Finalize on what libraries • Designing is repeated in
or routines are to be each iteration.
used. • Low level design is
• Prepare LLD. developer’s
• Finalize Low level details. responsibility.
• Prepare UTS and UTP.
• Design unit tests.
• Refine and update
previously prepared and •Requirements review is conducted on the
start of each Iteration.
controlled documents. •Testable Task specification against
requirements.
• Baseline (allocated or •Prioritize tasks.
design baseline) •Estimate tasks.
•Allocate tasks.
•Create test scenarios. (may even write
test before development)
Development and Unit test
Sequential Parallel
• Code program. • Each member works on
• Conduct unit testing. task at hand and
implements a solution.
• Implement help and • Re-factor or create a
error messages. new implementation.
• Update design • Code unit test before or
documents if required. after Implementation.
• Fix errors.
•Requirements review is conducted on the
• Update defect log. start of each Iteration.
•Testable Task specification against
• Initiate corrective action. requirements.
•Prioritize tasks.
• Record unit test results •Estimate tasks.
•Allocate tasks.
and other data •Create test scenarios. (may even write
generated in process. test before development)
Integrated test.
Sequential Parallel
• STS and STP are used to • Implemented solution is
conduct Integrated tests finalized only if integrated
solution implements some
• alpha testing feature fulfilling (partial or
– Limited users test integrated complete) requirement.
system • Integrated testing is done
• beta testing on the go for each new
– Full fledge testing feature implemented.
• Test results recording
•Requirements review is conducted on the
• Diagnose and fix recorded start of each Iteration.
bugs •Testable Task specification against
requirements.
• Update defect logs •Prioritize tasks.
•Estimate tasks.
• Initiate corrective action •Allocate tasks.
•Create test scenarios. (may even write
• Perform regression testing test before development)
• Baseline. (product baseline)
Acceptance test.
Sequential Parallel
• User acceptance. • Demonstrate product
• Conducted by delta to the customers
– Client or and team.
– Authorized entity.
• Get Acceptance of
• Development team helps.
– Make work products available.
product delta.
– Record Errors and fix them. • Get project clearance.
• Update defect logs. •Acceptance review is conducted at the end
• Initiate corrective action. of each Iteration.
•Test features against requirements
• Perform regression testing. involving all involved parties.
•Get clearance from stakeholders.
• Record results and highlight •Get go ahead for release.
disagreements. •Get go ahead for project.
•Process review is also conducted between
Acceptance and Requirements Review.
Implement
Sequential Parallel
• Development team • System deployment is
supervises the planed.
installation. • Core team (member)
• Maintenance team provides assistance in
takes over. – deployment.
– Enhancements. – Maintenance.
– Technical support.
– Bugs recording and
fixing.
Wind up
Sequential Parallel
• Project ending • Proceed as planned
appraisals. during deployment.
• Release resources • Free all resources
excluding related to except related to
support. support.
• Return client property.
• Ensure complete
documentation is
retained in proper NOTE: This phase is a
format. part of deployment
plan and not executed
separately.
Maintenance
Sequential Parallel
• True benefits of SCM • Maintenance may or
could be picked in this may not be provided
phase. by development team
– All the support so this is also done in
documentation is the same way as
available in this phase iterations during
for maintenance.
development is done.
– Easy bug fixing during
this phase. These Iterations may be
planned by the core
team during execution
of other projects as
well.
Retirement
Sequential Parallel
• SCM resources are • Reasons may be
released. Unavailability of Core
• Maintenance team team (members).
disbands. • Same as sequential
• Reasons may be process’s same phase.
ineffectiveness of
– Cost.
– Resources.
• Requirements of
resources for some
other projects.
Project Phases Outputs
Project Phase Documents in Controlled Documents SCM Documents
preparation