2. Route: Dont make double job at the same route,it will waste your time. Please
be aware with your route and dont duplicate it.
3. Event: event is the most important thing, you can see when the event call drop,
handover failure and make the analyze at that time. So you can explain to your
RF Engineer what you have done in your work
4.
5. Be active to analyze: some of DT engineer spent all the day to collect the data
without knowing the result, it better for you to focus on your work and see if
there any crossfeeder, bad spot result, or site Down,etc
A. Cross Feeder: which cell is cross feeder?
Open Probe V3.5 then connect LTE Dongle and USB GPS
Klik Configure -> Device management-> Device configure
add the MS, by following this below picture and choose the related COM port
add the MS, by following this below picture and choose the related COM port
Add The GPS NMEA by click add button and choose the COM Port
Create the engineering Parameter in xls format (please use the following format)
Match the probe parameter with the excel parameter (mandatory field)
Click next and make sure there are no failed item
Set different parameter according to different test, for example FTP Download
4. Set test
parameters
1. Add
test
2. Choose
equipment
3. Test
state
5. Test
statistic
Weekly/Monthly DT Preparation
1. Before
Weekly/Monthly
DT
2. During
Weekly/Monthly
DT
3. After
Weekly/Monthly
DT log process
1.1
1.2
1.3
1.4
Site status
Site alarm
Site transmission & SSV remarks
Neighboring site
1. Before Weekly/Monthly DT
1.1 Site status
with the remarks stated over SSV report. Certain site(s) with
transmission limitation will be remarked over SSV report. Also,
take note of other special remarks stated over SSV report.
1.4 Neighboring site
1. Before Weekly/Monthly DT
1.5 Site DT route
cross
Always cross check the DT route before starting DT. Ensure DT
route doesnt cover low coverage area whereby the planned site
not
integrated
/ up yet.
1.6isDT
FTP
files
Always ensure to perform large files for FTP download
(recommended 1G files, 5~8 files at the same time). DO NOT
perform small files download as might end up with non-stable
peak throughput.
During DT, always ensure the vehicle speed are moving not too
fast nor too slow. Ensure DT log files saved at Example
50~100Mb/files.
of DT speed
Always drop down remarks during DT if found any activities / ongoing event around the site or any abnormal found.
2.3 Remarks of serving site environment
Always alert with the DT result and check with the surrounding
environment. Is the serving cell being blocked by high rise
building? Is there any cross feeder? Is there any sleeping cell or
abnormal cell and etc.
FTP Server:
IP : ????????
UN / PW : xxxxx/ xxxxx
Cluster Reporting & KPI (Plotting Download (add layer & Missing Route))
A. Download
- Click the layer button to add some routes it will make you easier to locate where is the missing route
and create justification at that area