Engineering and Design
Series 200
ASIA-SOP-200
ASIA-SOP-201
ASIA-SOP-202
ASIA-SOP-203
ASIA-SOP-204
Technical Requisitions
ASIA-SOP-205
Design Reviews
Slide 2
ASIA-WI-200-01
Equipment Numbering
ASIA-WI-201-01
ASIA-WI-205-01
ASIA-WI-205-02
ASIA-WI-205-03
cGMP Review
ASIA-WI-205-04
Slide 3
ASIA-SOP-100
ASIA-SOP-101
ASIA-SOP-110
ASIA-SOP-111
Opportunity Response
ASIA-SOP-130
Project Controls
ASIA-SOP-301
ASIA-SOP-310
Client Surveys
ASIA-SOP-320
Quality Audits
GSOP-120
Slide 4
ASIA-WI-100-01
ASIA-WI-100-02
ASIA-WI-130-01
ASIA-WI-130-02
Estimating
ASIA-WI-130-03
ASIA-WI-130-04
Change Management
Slide 5
Major Difference
Changes to comply with GSOPs
More Precise
Responsibility and Action Oriented
Client Oriented
Emphases greater use of JVEPs
More user friendly format
Slide 6
Design Validation
Design Changes
Project close-out
Slide 7
Slide 8
Slide 9
Slide 10
Slide 11
Slide 12
Slide 13
Slide 14
team
Administers constructability process for the project (Ref
JVEP03 Constructability)
Documents all reviews, meetings and constructability cost
savings / avoidance
Slide 15
Slide 16
complexity
Issues DVP
Slide 18
Preparation of Engineering
Deliverables
Responsible : Design Leads
Slide 20
Slide 21
Inter-discipline co-ordination
Client reviews
Slide 23
Design Validation
Responsible : Discipline Leads
Design Changes
Responsible : Discipline Leads
Highlight changes that impact cost, schedule and
workhours. Raise VN
Responsible : Project Manager
Expeditiously raise CN with client and resolve
Slide 25
Construction Support
Responsible : Construction Lead
Establishes procedures for documenting design activities
RFI
Slide 26
Construction Support
Responsible : Project Manager
Incorporates procedures in PP Manual and Change
Management
Responsible : Discipline Leads
Prepare as-built or record drawings based on red line
Slide 27
Project Closeout
Responsible : Project Manager
Ensures
Slide 28
Is upgraded
L WI 273 3D Modelling
Slide 29
DVP modified. Engineering Manager shall also approve DVP (refer S202f1)
Slide 30
Slide 31
S204f4)
Eventually, need to comply with ASIA-SOP-402 Inquiry
Slide 32
Hazop Review
CHAZOP Review
cGMP Review
Slide 33
Organises review
Engineering Manager
Slide 36
Reviewed / compilation
Slide 37
S205f8)
Slide 40
Slide 41
Conduct reviews
Slide 42
cGMP Review
Undertaken to ensure that a design and / or facility
nos.
Slide 43
Constructability Review
Refer ASIA-WI-200-04 Engineering for Construction and
Maintenance (no major change)
Objective
Construction risks are identified
Identified risks are minimised (from an engineering and
design perspective)
Slide 44
Constructability Review
Refer ASIA-SOP-501 Constructability Review (generally simplified)
Objective
Slide 45
Constructability Review
Slide 46
New Forms
S202f1
S202f2
S204f4
WI200-01f1
Equipment Numbering
WI205-03f1
WI205-03f2 to
WI205-03f13
WI205-03f14
WI205-03f15
Slide 47