TECNOLOGIAS PARA
LA CEMENTACIN DE
POZOS PETROLEROS
TEMAS A DISCUTIR
Redescubriendo el Cemento
espumado
En los aos 80 se
lanz el cemento
espumado pero su
aplicacin perdi
fuerza por su dificultad
operacional aplicando
la tecnologa del
momento.
Que es un Cemento
espumado?
Es un sistema
conformado por
una lechada de
Cemento base,
surfactante
espumante, y un
gas (usualmente
Nitrgeno).
Cemento Espumado
Generador de Espuma
Descarga de
Cemento Espumado
PSI
Convenciona
l
Espumado
Clase H
Clase A +
Econolite
Clase A
Clase H +
Clase H + Econolite
WG-17
12.0
89o
11.4
90o
12.0
90o
71o
11.5
60o
11.5
Previene la migracin de
Gas
Tipos de migracin
anular de gas
Gas
Channel
Flujo a travs de
canales
irremovidos de
lodo
Flujo Microanular
Percolacin del
gas en cemento
sin fraguar
Fluid
Loss
Gas
Entry
Se pierde columna
hidrosttica
Deshidratacin del
cemento
Poca Gelificacin
del cemento
Grandes tiempos
entre el estado
Liquido y slido
Perdida de presin
hidrosttica
Presin Hidrosttica
Cemento
Fluido
Cemento
Gelificando
Cemento
Cemento
fraguado Endureciendo
Presin de
sobrebalance
Presin de poro
de la formacin
Tiempo
Cemento Espumado
Presin Hidrosttica
Cemento
Fluido
Cemento
Gelificando
Cemento
Cemento
fraguado Endureciendo
Presin de
sobrebalance
Presin de poro
de la formacin
Tiempo
Cemento Espumado
35
Cemento Espumado
30
25
20
15
10
5
0
12.0
PPG
12.0
PPG
3.5
Tiempo de Transisin - Horas
45
3
2.5
2
1.5
1
0.5
Minutos vs Horas
0
Cemento ligero
convencional
(Bentonita)
9
Se presuriz
ciclicamente varias
veces hasta
presentarse una
fractura
El impacto del
Caoneo puede
fracturar el
cemento
El cemento espumado es ms
dctil
No se observ
fracturas
Slo ligera perdida de
adherencia
Se presento
deformacin sin
fracturarse por su
naturaleza elstica
El cemento espumado es
aislante del calor
Thermal
Conductivity
Thermal Conductivity
(BTU/HR-FT-F)
of Foam Cement
0.5
K-Value
(Dried @ 230 F)
Debido a que
contiene
burbujas de
Nitrgeno, el
cemento
espumado tiene
una menor
conductividad
trmica.
0.4
0.3
0.2
0.1
0
10
15.6
Density (lb/gal)
Simuladores
Mejorados
Fluid Positions
(TVD)
Fluids Pumped
1623.36
1967.6
2000
3000.32
Aditivos
mejorados
4000
Sea Water
MOBM
MOBM
Base Oil Flush
Tuned Spacer
Foamed Lead
Tail Slurry
Shoe Slurry
MOBM
Down Hole Depth
6000
8000
8799.97
10000
12000
14000
16000
10
10
OptiCem v3.0.0a0
03-Jun-99 9:43
Mejor
medicin
de los
parmetros
del pozo
Unidad de
Nitrgeno
Unidad de Inyeccin
TRAVEL
TIME
0
150
GAMMA
0
150
AVZ
10
0
ECEN
0
1
AMPLIFIED
AMPLITUDE
0
10
AMPLITUDE
0
60
FCBI
1
0
Good
Pipe to
Cement
Bond
Channel
Good
Cement
to
Formation
Bond
X200
CBL WAVEFORM
0
IMPEDANCE IMAGE
20 0
6.15
Perdidas de
Circulacin:
Superficie
Intermedio
Produccin
Liner
USA
RNA
24
24
24
18
24
25
24
26
Mundial
21
23
24
19
Perdidas de Circulacin
Las causas para las perdidas
de Circulacin son :
Perdidas de Circulacin
Soluciones comunes
Materiales sellantes en el lodo
BenGum Squeeze
Tapones de Cemento + Silicato
Revestimiento.
Sus caractersticas son:
Requieren varios tratamientos
Realizar viajes adicionales
Involucran tiempo y perdida adicional de lodo
(Dinero).
Perdidas de Circulacin
Una nueva Solucin
Los materiales de FlexPlug son
polmeros diseados para reaccionar
con cualquier lodo produciendo un
material sellante en la cara del pozo o
en la entrada de la fractura. La
reaccin instantnea permite continuar
perforando tan pronto se haya finalizado
el tratamiento y no requiere cambios en
el ensamblaje de fondo.
Servicio de FlexPlug
SM
Servicios de FlexPlugSM
Comparacin de los tiempos de reaccin
Reaccin del
FlexPlug
Reaccin Bengum
10 a 60
segundos
1 hora
8
Penetracin del
tratamiento
Los sistemas
Convencionales de LC
penetran mas en las
fracturas
Tcnicas de
LCM
FlexPlug
SM
Tcnica de aplicacin
Bombeo por el
Drill Pipe
Espaciador
FlexPlug
Bombeo por el
Anular
Bombeo
Simultaneo
por el
Anular y en
Directa.
Aplicando
presin de
squeeze.
Perforando
Lodo
Zona de
Perdida
Tipo de lodo
Severidad del problema
Profundidad de la(s) zona(s) de perdida
Geometra del pozo y la sarta
Historia de tratamientos previos en la
zona
Datos de Pruebas de integridad y
gradientes de fractura
60
50
40
6.5
7
30
8.5
10.75
12.25
20
13
14.5
16
10
17.5
20
0
10 to 30
30 to 60
60 to 100
100 to 200
200 to 300
300 to 400
Rinde el doble !
400 to 500
500 to 1000
Casos Histricos
FlexPlug SM W Service
Application
UG Blowout - 30,000 BSW/D
UG Blowout - 1,000 BSW/D + gas
Lost Circulation - 60 bbl/hr
Lost Circulation - 20 bbl/hr
UG Blowout - Rate undetermined
UG Blowout - Rate undetermined
UG Blowout - Total mud loss
Lost Circulation - 10 bbl/hr
Lost Circulation - 10 bbl/hr
Lost Circulation - 20 bbl/hr
Lost Circulation - 10 bbl/hr
Lost Circulation - 15 bbl/hr
Lost Circulation - 20 bbl/hr
Lost Circulation - 20 bbl/hr
Treatment Size
82 bbls
46 bbls *
25 bbls
19 bbls
10 bbls
10 bbls
50 bbls
10 bbls
10 bbls
25 bbls
25 bbls
25 bbls
25 bbls
25 bbls
Results
Sealed fluid exit zone
Sealed influx & exit zone
Squeezed zone to MW + 2 ppg
Refractured zone while POOH
Sealed gas zone
Sealed 2nd gas zone
Sealed zone to regain circulation
No squeeze pressure - continued losses
Pumped away - squeezed with cement
Sealed multiple zones - reduced losses
Sealed additional zone & drilled ahead
No squeeze - No cement behind casing
Squeezed zone to MW + 1 ppg
Squeezed 2nd zone to MW + 1 ppg
Casos Histricos
FlexPlug SM OBM Service
Application
Lost Circulation - 150 bbl/hr
Lost Circulation - 370 bbl/hr
Lost Circulation - 350 bbls lost
Lost Circulation - 75 bbls lost
Lost Circulation - 85 bbls lost
Lost Circulation - 85 bbls lost
Lost Circulation - 15 bbls/hr
Lost Circulation - 10 bbls/hr
Lost Circulation - 20 bbl/hr
Lost Circulation - 20 bbl/hr
Lost Circulation - 10 bbl/hr
Lost Circulation - 30 bbl/hr
Lost Circulation - 10 bbl/hr
Treatment Size
50 bbls
75 bbls
20 bbls
20 bbls
20 bbls
20 bbls
25 bbls
25 bbls
15 bbls
25 bbls
35 bbls
20 bbls
15 bbls
Results
Squeezed zone to MW + 2 ppg
Squeezed 2nd zone to MW + 1.9 ppg
Squeezed zone to MW + 0.4 ppg
Squeezed 2nd zone to MW + 1.3 ppg
Squeezed 3rd zone to MW + 2 ppg
Squeezed 4th zone to MW + 4 ppg
Squeezed (MW + 1 ppg) - LC on drillout
No squeeze - continued losses to fault
No squeeze pressure - continued losses
Squeezed zone to MW + 1 ppg
Squeezed zone to MW + 1.5 ppg
No squeeze pressure - continued losses
Squeezed zone to MW + 0.5 ppg
FlexPlug SM R Service
Application
UG Blowout - 30,000 BSW/D
FW Crossflow - rate unknown
Treatment Size
100 bbls
20 bbls
Results
Sealed High pressure zone
Squeezed zone to MW + 6 ppg
Consideraciones
para disear
espaciadores
Tecnologia de espaciadores
La remocin de lodos ha sido
nuevamente evaluada bajo la teoria de
ERODABILIDAD
Nuevos espaciadores se han
desarrollado con mejores perfiles
reolgicos
Una nueva tecnologa para medir la
humectabilidad del agua dejada por los
espaciadores al desplazar lodos base
aceite.
Que es la Erodabilidad?
Lodo
deshidratado
Filtrado
Lodo Fluido
Cemento
FILTRATE
Revoque
del lodo
Formacin
Revestidor
Viejos Conceptos
Formacin
Lodo
C
Excentricidad
= C / (A-B)
Revestidor
Cemento
Area Cementada
Eficiencia de
=
Desplazamiento
Area Anular
Consideraciones de la
Erodabilidad
Considera un esfuerzo de corte mnimo
para erodar el lodo parcialmente
gelificado o deshidratado.
Los factores presentes son:
Velocidad del fluido (Geometra, tasa de
bombeo, excentricidad)
Reologia de los fluidos (Geles, VP/PC,
revoque del lodo, densidad).
Esfuerzo de corte del fluido a Erodar
Calculo de la Erodabilidad
(1)
FLUID TO BE REMOVED
Description
7" liner - La Ceiba 5X
WELL GEOMETRY
Hole Diameter
11.500 inches
CIRCULATING FLUID
drilling fluid
Viscosity
(cp)
25.00
(3)
Yield Point
lbf/100 ft^2
18.00
Density
lb/gal
9.80
Rate for Turbulence in Conc. Annulus
22.9
(4)
(5)
Minimum Flow Rate 100%
28.1
vs % Hole Cleaning
80%
18.0
(check ecd from Cjobsim )
60%
11.1
bbl/min
40%
5.5
Pipe OD
7.000 inches
spacer
24.00
18.00
11.50
20.5
26.7
20.6
11.6
5.7
cement
95.50
21.50
16.40
27.8
3.0
2.2
~2
~2
(2)
other 2
57.00
33.00
15.70
26.8
~2
~2
~2
~2
Un Nuevo Espaciador
(Tuned Spacer)
Disear la reologia del espaciador de acuerdo a
cada aplicacin (Usando simuladores o
modelos de erodabilidad)
Preparar un espaciador con caractersticas
similares al laboratorio bajo las condiciones de
fondo
Simplificar el diseo del espaciador segn los
requerimientos de erodabilidad
Humectabilidad
No exista un mtodo directo para medir la
humectabilidad al agua.
Los surfactantes y sus concentraciones eran
definidos por pruebas de compatibilidad
Algunas veces se usaba mas espaciador del
necesario, o no se lograba cambiar a un 100%
humectabilidad al agua (Pobre adherencia de
cemento y mala interpretacin de registros)
Anlisis de la Humectabilidad
11.0 ppg PetroFree Mud
240
Meter Reading
190
140
90
40
-10
30
40
50
60
70
Anlisis de la Humectabilidad
PRUEBA DE MOJABILIDAD
M O J A B I L I D A D (H n )
160
140
120
100
80
TUNED SPACER
60
40
20
0
0
10
15
20
25
30
35
40
VOLUMEN DE SURFACTANTES
45
50