LP Formulation

Practice Set 1

Problem 1. Optimal Product Mix


Management is considering devoting some excess
capacity to one or more of three products. The hours
required from each resource for each unit of product, the
available capacity (hours per week) of the three
resources, as well as the profit of each unit of product are
given below.

Sales department indicates that the sales potentials for


products 1 and 2 exceeds maximum production rate,
but the sales potential for product 3 is 20 units per
week.
Formulate the problem and solve it using excel
LP-Formulation

Ardavan Asef-Vaziri

June-2013

Problem Formulation
Decision Variables
x1 : volume of product 1
x2 : volume of product 2
x3 : volume of product 3
Objective Function
Max Z = 50 x1 +20 x2 +25
x3
Constraints
Resources
9 x1 +3 x2 +5 x3 500
5 x1 +4 x2 +
350
3 x1 +
+2 x3 150
Market
x3 20
LP-Formulation
Ardavan Asef-Vaziri
Nonnegativity

June-2013

Problem 2
An appliance manufacturer produces two models of
microwave ovens: H and W. Both models require
fabrication and assembly work: each H uses four
hours fabrication and two hours of assembly, and
each W uses two hours fabrication and six hours of
assembly. There are 600 fabrication hours this week
and 450 hours of assembly. Each H contributes $40
to profit, and each W contributes $30 to profit.
a) Formulate the problem as a Linear Programming
problem.
b) Solve it using excel.
c) What are the final values?
d) What is the optimal value of the objective function?
LP-Formulation

Ardavan Asef-Vaziri

June-2013

Problem Formulation
Decision Variables
xH : volume of microwave oven
type H
xW : volume of microwave oven
type W
Objective Function
Max Z = 40 xH +30 xW
Constraints
Resources
4 xH +2 xW 600
2 xH +6 xW 450
Nonnegativity
xH 0, xW 0
LP-Formulation

Ardavan Asef-Vaziri

June-2013

Problem 3
A small candy shop is preparing for the holyday season. The
owner must decide how many how many bags of deluxe mix
how many bags of standard mix of Peanut/Raisin Delite to
put up. The deluxe mix has 2/3 pound raisins and 1/3 pounds
peanuts, and the standard mix has 1/2 pound raisins and 1/2
pounds peanuts per bag. The shop has 90 pounds of raisins
and 60 pounds of peanuts to work with. Peanuts cost $0.60
per pounds and raisins cost $1.50 per pound. The deluxe mix
will sell for 2.90 per pound and the standard mix will sell for
2.55 per pound. The owner estimates that no more than 110
bags of one type can be sold.
a) Formulate the problem as a Linear Programming problem.
b) Solve it using excel.
c) What are the final values?
d) What is the optimal value of the objective function?
LP-Formulation

Ardavan Asef-Vaziri

June-2013

Problem Formulation
Decision Variables
x1 : volume of deluxe mix
x2 : volume of standard mix
Objective Function
Max Z = [2.9-0.60(1/3)-1.5(2/3)] x1 + [2.550.60(1/2)-1.5(1/2)] x2
Max Z = 1.7x1 + 1.5 x2
Constraints
Resources
(2/3) x1 +(1/2) x2 90
(1/3) x1 +(1/2) x2 60
Nonnegativity
LP-Formulation
x1 0, x2 0

Ardavan Asef-Vaziri

June-2013

Problem 4
The following table summarizes the key facts about two
products, A and B, and the resources, Q, R, and S,
required to produce them.
Resource Usage per Unit Produced

Resource

Product A

Product B

Amount of
resource
available

Profit/Uni
t

$3000

$2000

a) Formulate the problem as a Linear Programming


problem.
b) Solve it using excel.
c) What are the final values?
LP-Formulation
Ardavan
Asef-Vaziri
June-2013function?
d) What is the optimal value
of the
objective

Problem Formulation
Decision Variables
xA : volume of product A
xB : volume of product B
Objective Function
Max Z = 3000 xA +2000 xB
Constraints
Resources
2 xA +1 xB 2
1 xA +2 xB 2
3 xA +3 xB 4
Nonnegativity
xA 0, xB 0
LP-Formulation

Ardavan Asef-Vaziri

June-2013

Problem 5
The Apex Television Company has to decide on the number of
27 and 20 sets to be produced at one of its factories.
Market research indicates that at most 40 of the 27 sets and
10 of the 20 sets can be sold per month. The maximum
number of work-hours available is 500 per month. A 27 set
requires 20 work-hours and a 20 set requires 10 work-hours.
Each 27 set sold produces a profit of $120 and each 20 set
produces a profit of $80. A wholesaler has agreed to purchase
all the television sets produced if the numbers do not exceed
the maximum indicated by the market research.

a) Formulate the problem as a Linear Programming


problem.
b) Solve it using excel.
c) What are the final values?
d) What is the optimal value of the objective function?
LP-Formulation

Ardavan Asef-Vaziri

June-2013

10

Problem Formulation
Decision Variables
x1 : number of 27 TVs
x2 : number of 20 TVs
Objective Function
Max Z = 120 x1 +80 x2
Constraints
Resources
20 x1 +10 x2 500
Market
x1
40
x2 10
Nonnegativity
x1 0, x2 0
LP-Formulation

Ardavan Asef-Vaziri

June-2013

11

Problem 6
Ralph Edmund has decided to go on a steady diet of only
streak and potatoes s (plus some liquids and vitamins
supplements). He wants to make sure that he eats the right
quantities of the two foods to satisfy some key nutritional
requirements. He has obtained the following nutritional and
cost information. Ralph wishes to determine the number of
daily servings (may be fractional of steak and potatoes that will
meet these requirements
atIngredient
a minimum
cost.
Grams of
per Serving
Ingredient

Steak

Potatoes

Daily Requirements (grams)

Carbohydrates

15

50

Protein

20

40

Fat

15

60

Cost per serving

$4

$2

Formulate the problem as an LP model. Solve it using excel.


What are the final values? What is the optimal value of the
LP-Formulationfunction?
Ardavan Asef-Vaziri June-2013
objective

12

Problem Formulation
Decision Variables
x1 : serving of steak
x2 : serving of potato
Objective Function
Min Z = 4 x1 +2x2
Constraints
Resources
5 x1 +15 x2 50
20 x1 +5 x2 40
15 x1 +2 x2 60
Nonnegativity
x1 0, x2 0
LP-Formulation

Ardavan Asef-Vaziri

June-2013

13

Problem 7
A farmer has 10 acres to plant in wheat and rye. He has
to plant at least 7 acres. However, he has only $1200 to
spend and each acre of wheat costs $200 to plant and
each acre of rye costs $100 to plant. Moreover, the
farmer has to get the planting done in 12 hours and it
takes an hour to plant an acre of wheat and 2 hours to
plant an acre of rye. If the profit is $500 per acre of
wheat and $300 per acre of rye, how many acres of
each
be planted
to maximize profits?
State should
the decision
variables.
x = the number of acres of wheat to plant
y = the number of acres of rye to plant
Write the objective function.

maximize 500x +300y


LP-Formulation

Ardavan Asef-Vaziri

June-2013

14

Problem 7
Write the constraints.

x+y 10
(max acreage)
x+y 7
(min acreage)
200x + 100y 1200
(cost)
x + 2y 12
(time)
x 0, y 0
(non-negativity)

LP-Formulation

Ardavan Asef-Vaziri

June-2013

15

Problem 8
You are given the following linear programming model in
algebraic form, where, X1 and X2 are the decision
variables and Z is the value of the overall measure of
performance.
Maximize Z = X1 +2 X2
Subject to
Constraints on resource 1: X1 + X2 5 (amount
available)
Constraints on resource 2: X1 + 3X2 9 (amount
available)
And
X1 , X2 0
LP-Formulation

Ardavan Asef-Vaziri

June-2013

16

Problem 8
Identify the objective function, the functional
constraints, and the non-negativity constraints in this
model.
Objective Function Maximize Z = X1 +2 X2
Functional constraints X1 + X2 5, X1 + 3X2 9
Is (X1 ,X2) = (3,1) a feasible solution?
3 + 1 5, 3 + 3(1) 9 yes; it satisfies both
constraints.
Is (X1 ,X2) = (1,3) a feasible solution?
1 + 3 5, 1 + 3(9) > 9 no; it violates the second
constraint.
LP-Formulation

Ardavan Asef-Vaziri

June-2013

17

Problem 9
You are given the following linear programming model in
algebraic form, where, X1 and X2 are the decision
variables and Z is the value of the overall measure of
performance.
Maximize Z = 3X1 +2 X2
Subject to
Constraints on resource 1: 3X1 + X2 9 (amount
available)
Constraints on resource 2: X1 + 2X2 8 (amount
available)
And
X1 , X2 0
LP-Formulation

Ardavan Asef-Vaziri

June-2013

18

Problem 9
Identify the objective function,
Maximize Z = 3X1 +2 X2
the functional constraints,
3X1 + X2 9 and X1 + 2X2 8
the non-negativity constraints
X1 , X2 0
Is (X1 ,X2) = (2,1) a feasible solution?
3(2) + 1 9 and 2 + 2(1) 8 yes; it satisfies both
constraints
Is (X1 ,X2) = (2,3) a feasible solution?
3(2) + 3 9 and 2 + 2(3) 8 yes; it satisfies both
constraints
Is (X1 ,X2) = (0,5) a feasible solution?
3(0) + 5 9 and 0 + 2(5) > 8 no; it violates the second
constraint

LP-Formulation

Ardavan Asef-Vaziri

June-2013

19

Problem 10. Product mix problem : Narrative representation


The Quality Furniture Corporation produces
benches and tables.
The firm has two main resources
Resources
labor and redwood for use in the furniture.
During the next production period
1200 labor hours are available under a union
agreement.
A stock of 5000 pounds of quality redwood is also
available.
LP-Formulation

Ardavan Asef-Vaziri

June-2013

20

Problem 10. Product mix problem : Narrative representation


Consumption and profit
Each bench that Quality Furniture produces requires
4 labor hours and 10 pounds of redwood
Each picnic table takes 7 labor hours and 35 pounds of
redwood.
Total available 1200, 5000
Completed benches yield a profit of $9 each,
and tables a profit of $20 each.
Formulate the problem to maximize the total profit.
LP-Formulation

Ardavan Asef-Vaziri

June-2013

21

Problem 10. Product Mix : Formulation


x1 = number of benches to produce
x2 = number of tables to produce
Maximize Profit = ($9) x1 +($20) x2
subject to
Labor:
Wood:
and

4 x1 + 7 x2

1200 hours

10 x1 + 35 x2 5000 pounds
x1 0, x2 0.

We will now solve this LP model using the Excel Solver.


LP-Formulation

Ardavan Asef-Vaziri

June-2013

22

Problem 10. Product Mix : Excel solution

LP-Formulation

Ardavan Asef-Vaziri

June-2013

23

Problem 11. Make / buy decision : Narrative representation


Electro-Poly is a leading maker of slip-rings.
A new order has just been received.
Model 1 Model 2
Number ordered
Hours of wiring/unit

Model 3

3,000

2,000

900

1.5

Hours of harnessing/unit 1
Cost to Make

$50

$83

$130

Cost to Buy

$61

$97

$145

The company has 10,000 hours of wiring capacity and


5,000 hours of harnessing capacity.

LP-Formulation

Ardavan Asef-Vaziri

June-2013

24

Problem 11. Make / buy decision : decision variables


x1 = Number of model 1 slip rings to make
x2 = Number of model 2 slip rings to make
x3 = Number of model 3 slip rings to make
y1 = Number of model 1 slip rings to buy
y2 = Number of model 2 slip rings to buy
y3 = Number of model 3 slip rings to buy
The Objective Function

Minimizethetotalcostoffillingtheorder.
MIN: 50x1+83x2+130x3+61y1+97y2+145y3
LP-Formulation

Ardavan Asef-Vaziri

June-2013

25

Problem 11. Make / buy decision : Constraints


Demand Constraints
x1 + y1 = 3,000 } model 1
x2 + y2 = 2,000 } model 2
x3 + y3 = 900 } model 3
Resource Constraints
2x1 + 1.5x2 + 3x3 <= 10,000 } wiring
1x1 + 2.0x2 + 1x3 <= 5,000 } harnessing
Nonnegativity Conditions
x1, x2, x3, y1, y2, y3 >= 0

LP-Formulation

Ardavan Asef-Vaziri

June-2013

26

Problem 11. Make / buy decision : Excel

LP-Formulation

Ardavan Asef-Vaziri

June-2013

27

Problem 11. Make / buy decision : Constraints


Do we really need 6 variables?
x1 + y1 = 3,000 ===> y1 = 3,000 - x1
x2 + y2 = 2,000 ===> y2 = 2,000 - x2
x3 + y3 = 900 ===> y3 = 900 - x3
The objective function was
MIN: 50x1 + 83x2 + 130x3 + 61y1 + 97y2 + 145y3
Just replace the values
MIN: 50x1 + 83x2 + 130x3 + 61 (3,000 - x1 ) + 97
( 2,000 - x2) +
145 (900 - x3 )
MIN: 507500 - 11x1 -14x2 -15x3
We can even forget 507500, and change the the O.F.
into
LP-Formulation
Ardavan Asef-Vaziri June-2013

28

Problem 11. Make / buy decision : Constraints


MAX+11x1+14x2+15x3

Resource Constraints
2x1 + 1.5x2 + 3x3 <= 10,000 } wiring
1x1 + 2.0x2 + 1x3 <= 5,000 } harnessing
Demand Constraints
x1 <= 3,000 } model 1
x2 <= 2,000 } model 2
x3 <= 900

} model 3

Nonnegativity Conditions
x1, x2, x3 >= 0
LP-Formulation

Ardavan Asef-Vaziri

June-2013

29

Problem 11. Make / buy decision : Constraints


MIN: 50x1 + 83x2 + 130x3
+ 61y1 + 97y2 + 145y3

y1 = 3,000x1

y2 = 2,000x2
Demand Constraints
MIN: 50x1 + 83x2 + 130x3
= 900x1 + y1 = 3,000 } model 1
+ y3
61(3,000x1)
x3
+ 97(2,000-x2)
x2 + y2 = 2,000 } model 2
+ 145(900-x3)
x3 + y3 = 900 } model 3
y1 = 3,000Resource Constraints
x1>=0
2x1 + 1.5x2 + 3x3 <= 10,000 }
y2 = 2,000wiring
x2>=0
x1 <= 3,000
1x1 + 2.0x2 + 1x3 <= 5,000 }
y3x2
= <=
9002,000
harnessing
x3>=0
x3 <= 900
Nonnegativity Conditions
LP-Formulation

Ardavan Asef-Vaziri

June-2013

30

Problem 12. Marketing : narrative


A department store want to maximize exposure.
There are 3 media; TV, Radio, Newspaper
each ad will have the following impact
Media
Exposure (people / ad)
Cost
TV
20000
15000
Radio
12000
6000
News paper
9000
4000
Additional information
1-Total budget is $100,000.
2-The maximum number of ads in T, R, and N are
limited to 4, 10, 7 ads respectively.
3-The total number of ads is limited to 15.

LP-Formulation

Ardavan Asef-Vaziri

June-2013

31

Problem 12. Marketing : formulation


Decision variables
x1 = Number of ads in TV
x2 = Number of ads in R
x3 = Number of ads in N
Max Z = 20 x1 + 12x2 +9x3
15x1 + 6x2 + 4x3 100

x1
x2
x1 + x2 +
x1, x2, x3 0

LP-Formulation

10

x3

x3

15
Ardavan Asef-Vaziri

June-2013

32

Problem 13. ( From Hillier and Hillier)


Men, women, and children gloves.
Material and labor requirements for each type and the
corresponding profit are given below.
Glove
Material (sq-feet) Labor (hrs) Profit
Men
2
0.5
8
Women 1.5
0.75
10
Children 1
0.67
6
Total available material is 5000 sq-feet.
We can have full time and part time workers.
Full time workers work 40 hrs/w and are paid $13/hr
Part time workers work 20 hrs/w and are paid $10/hr
We should have at least 20 full time workers.
The number of full time workers must be at least twice
of that of part times.
LP-Formulation

Ardavan Asef-Vaziri

June-2013

33

Problem 13. Decision variables


X1 : Volume of production of Mens gloves
X2 : Volume of production of Womens gloves
X3 : Volume of production of Childrens gloves
Y1 : Number of full time employees
Y2 : Number of part time employees

LP-Formulation

Ardavan Asef-Vaziri

June-2013

34

Problem 13. Constraints


Row material constraint
2X1 + 1.5X2 + X3 5000
Full time employees
Y1 20
Relationship between the number of Full and Part
time employees
Y1 2 Y2
Labor Required
.5X1 + .75X2 + .67X3 40 Y1 + 20Y2
Objective Function
Max Z = 8X1 + 10X2 + 6X3 - 520 Y1 - 200 Y2
Non-negativity
X1 , X2 , X3 , Y1 , Y2 0
LP-Formulation

Ardavan Asef-Vaziri

June-2013

35

Problem 13. Excel Solution

LP-Formulation

Ardavan Asef-Vaziri

June-2013

36

Potrebbero piacerti anche