System
Proposal
advantages
disadvantage
expensive cost (but
sharing makes less)
Required integral
pipe created together
need to install
carriage box extra
construction
renovations for pipes
High maintenances
PROCESS
LAYOUT
Due to the impact dense of stilts of the house, we purposed to install the
air flown system at the edge or corner of each house instead of beneath
the house.
LAYOUT PURPOSED
SPECIFICATION OF SYSTEM
Dimensions
A - Filter Height: 64"
B - Width: 30"
C - Diameter: 20"
D - Inlet: 35-1/4"
E - Outlet: 12"
Pipe Size: 3" Flange
Drain Size: 1-1/2" NPT
Floor Space: 3.7 ft2
Service Height: 98-1/2
SUPPLIER : Harmsco Hurricane Filtration Systems
(USA)
COSTING
DESCRIPTION
COSTING
SYSTEM
$9,022.61
CARRIAGE BOX
$4000 x 9 = $36,000
$9,022.61 x9 = $81203.49
130 CC x 2.000$=$260.000
= $200.000
TOTAL
TANK SPECIFICATIONS
Population served: 11-14
Max hydraulic load (l/day): 2800
Organic load (g BOD5/day): n/a
NH3 (g/per day): n/a
Total capacity (litres): 4500
Length (mm): 2165
Width (mm): 2165
Height (mm): 2770
Energy usage (kWh/day): 0
Inlet invert (mm): 770
Outlet invert (mm): 890
Pipework fitting (mm): 110
Lid size (mm): 760
Desludging interval: 12 months
Empty plant weight (kg): 275
Accreditation: CE (BSEN 12566-1)
ADVANTAGE
S
DISADVANTAG
ES
Easy to install
Impact resistant body
moulded in one-piece
polyethylene
Wide base and lifting eyes
Adjustable invert depth
Fully sized, two stage
separation treatment
chambers
Integral venting pipe-work
Wide range to suit
population requirements
LAYOUT
A site is defined as being wet when ground water rises above the base of the tank. At no time should
water table/ground water conditions result in water levels above the base of the turret of the tank. Excavation should allow for a
minimum of 200mm space all round the tank and 150mm below the tank. Where difficult ground conditions are encountered, ie in
unstable ground or shrinking clay etc, it will also be necessary to allow for an additional depth (as much as deemed necessary by the
supervising) engineer) to be excavated below the tank to allow
for hardcore and sand blinding to provide a firm base for the concrete bed.
In poor soil conditions it is essential to make substantial provision for planking and strutting and temporary shuttering and to provide
for adequate
LAYOUT PURPOSED
COSTING
DESCRIPTION
COSTING
Excavation works
34590 X 5 = 172,950
Manholes:
SYSTEM TANK
1,637.50 X 5 = 8187.5
Pump station:
4 x 50.000 =2000.000
concrete basement/slab
5 x 50.000 = 250.000
TOTAL