Sei sulla pagina 1di 14

CONSOLIDATION

ANALYSIS
-stuff you should know to complete your lab
assignment

CIE 366: Soil Mechanics Laboratory


Originally by Mike St. Pierre, 2007
Modified by Will Manion, 2008

Coefficient of Consolidation
(cv)

For every load increment

10 increments -- 10 plots

Holtz and Kovacs(1981) section 9.4, pg 395


Use the Casagrande logarithm of time curve
fitting method.

Fig. 9.7 on page 398 shows it nicely.

Coefficient of Consolidation
(cv)

cv

T50 H dr50
t50

cv (cm2/sec)
T50 = time factor at U = 50%
Hdr50 = height of drainage at
U = 50%
t50 = time at U = 50%
U = percent of primary consolidation

From Table 9-1 pg 390


If Uavg = 50%, T50 = 0.197

Coefficient of Consolidation (cv)


Casagrande log time method

Construct a plot of dial reading vs. log of time

Figure 9.7, pg 398

To determine

Ho = Initial height of specimen


Rstart = 0 (if you zeroed the dial at the beginning of the test)

R50 you determine from the plot

H dr50

H o ( R50 Rstart )

Coefficient of Consolidation (cv)


Casagrande log time method:

have to plot data points and complete


RMay
50
construction on paper see next slide

determine Ro, when U = 0%

this is NOT your first reading

determine R100, when U = 100%

then average to find R50,

which then graphically corresponds to t50

Ro

R, the same distance

R1
R2

R
R1 at t1
R2 at t2 (t2 = t1 x 4)
R = R2 R1

Ro

R100

Ro

R50 = (R100-Ro) / 2

R100

Void Ratio (e) versus Log


Stress ()

Determine initial height and final height for


load increment
Calculate the void ratio for each load
increment
Plot e versus log effective stress

You will have to print the plot and perform the


construction on paper show all work
Holtz and Kovacs (1981) Figure 8.6, pg 296

On paper, determine values


from the

Void
(e) versus
Log
UsingRatio
methodology
from Figure
8.6 Stress

()
plot the (most probable)
Determine
preconsolidation pressure (p)

Steps from Holtz and Kovacs pg 296


1.
2.
3.
4.
5.

Choose point of maximum curvature (point A)


Draw horizontal line from point A
Draw tangent to curve at point A
Bisect angle made in Steps 2 and 3
Extend straight line portion of virgin compression curve
through bisector line

Minimum Possible

Most Probable
eo

5
2
1
4
Maximum Possible
3

On paper, determine values


from the

Void
Ratio
(e) versus
Determine
compression
indexLog
(Cc) Stress
Slope
()
plotof virgin compression curve aka the steep

part of curve
Holtz and Kovacs Figure 8.9 pg 316 graphically
Holtz and Kovacs Figure 8.7 pg 313 analytically

Determine recompression index (Cr)

Slope of the unloading/reloading part of curve


Holtz and Kovacs Figure 8.9 pg 316

Details, Details, Details

Consolidation Memo

Due three weeks from today


ONE PAPER COPY for the whole group
Hand draw constructions (Make them neat)
11 plot attachments (label them appropriately)

Each lab member responsible for ONE


loading increment and cv plot

Sign bottom right hand corner

Potrebbero piacerti anche