Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Regulations
Readers
Professionals
CoP Policy
Review regularly
Revision Process
Invite comments
Feedback
Working group
Meeting
10/01
12/01
8
2/02
3/02
4/02
6/02
7/02
11/02
12/02
3/03
7/03
6/03
12/03
Academic Institutions
Power Companies
Professional Institutions
10
Revisions:
Reference to International Standards
11
Include the National Standard in Mainland China (Guo Biao, e.g.GB 16895)
Effective Date:
Immediate
Installation comply with CoP (1997 edition) is deemed to have met the
Wiring Regulations if
-
1997 edition
12
2003 edition
1.1.2006
Revisions:
Code 2 - Definitions
13
Overhead lines
Revisions:
Code 4A - Updated the List of Recognized Bodies
14
Revisions:
Code 4A - Updated the List of Recognized Bodies
15
Revisions:
Code 4D(3) - Inspection and Testing
16
general assessment
Revisions:
Code 4I - General Safety Practices
De-energize
Others
d
i
v
i
d
u
a
l
u
n
i
t
s
a
n
d
c
o
m
m
u
n
a
l
s
e
r
v
i
c
e
s
s
u
c
h
17
a
s
Revisions:
Code 6B - Basic Requirements of Circuits
18
Revisions:
Code 8A - Provision of isolation and switching
19
Isolation requirement for exhaust fans having rated power not exceeding
50W
Revisions:
Code 8B - Requirements of isolation and switching devices
20
Revisions:
are of the same construction, material and cross-sectional area, and are
approximately the same length, and appropriate phase disposition;
Table 9(4)
21
Type
B
C
D
3 In < I 5 In
5 In < I 10 In
10 In < I 20 In
Revisions:
Code 14B Steel conduit system
22
Metallic trunkings having nominal size differing from the table but complying
with IEC 61084 or equivalent are also acceptable .
Revisions:
Code 15E Impact
23
short PVC concealed conduit within 150mm of angle formed by wall/ partition =>
25mm depth
Revisions:
Code 21B(2) Sequence of tests
(i) continuity of protective conductors, including main and supplementary equipotential bonding,
(ii) continuity of ring final circuit conductors,
(iii) insulation resistance,
(iv) polarity,
(v) earth electrode resistance,
(vi) earth fault loop impedance,
(vii) functions of all protective devices,
(viii) functions of all items of equipment.
24
Revisions:
Code 21B(5) Earth electrode resistance
25
Revisions:
Code 21B(9) Testing of RCD
26
Revisions:
Code 25A Wiring installation using conduits
cable lubricant:
- not negatively interact with the cable;
27
Revisions:
Code 25A(2) Wiring installation using steel conduits
28
Length of each flexible conduit should be kept to a minimum of not more than 1 m
for general applications or 2 m inside false ceiling.
Revisions:
Code 26A(3) Electrical equipment in bathroom
29
Revisions:
Code 26I Lightning protection installation
30
Revisions:
Code 26M - Swimming Pools and Fountains Installation
Fountains
31
Revisions:
Table 26(1)
Recommended Number of Socket Outlets in Dwellings
32
Location
Minimum No. of
Socket Outlets
Kitchen
1.2
Living/ Dinning
Room
2.5
Bedroom
Store
--
Utility Room
--
Revisions:
33
Revisions:
34
Revisions:
New Appendix 12 Worked examples
35
Revisions:
New Appendix 13 Checklist
36
Revisions:
New Appendix 14 Reference
37
Revisions:
38
39
Purchase of CoP:
40
by e-mail at puborder@isd.gov.hk
41
42
Thank you
43