Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Primary
well control
Secondary well control
Tertiary well control
the Wellbore
Improper
Trip
Swabbing
Lost
of circulation
Insufficient
formation )
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.
2.
3.
4.
9500
9600
9700
9800
9900
10000
10100
10200
Shale
Sand
Normal
Pressure
Shale
Sand
Shale
Sand
Increasing
Formation Fluid
Pressure
1.
2.
3.
Concurrent method
pump strokes
Gas2.swf
Gas3.swf
Gas4.swf
1.
1.
Ram preventer
Designed to stop flow from the well using a steelribbed packing element that contracts around the drill
pipe
If they are shut on drill pipe, they will flatten the pipe
last choice
Used
Capable