A) COOLING PURPOSE
FOR GTS, STG LUBE OIL, GENRATOR,
EXCITER AND OTHER AUXILLARIES ,
CONDENSER
Value
Parameters
Value
pH
6.8 to 8.5
FRC
Nil
COND
1300 to 1800
PHOSPHATE
0.1
ALKALINITY
260 to 400
SILICA
25 to 30
TOTAL
HARDNESS
260 to 340
TURBIDITY
<15 NTU
CALCIUM
140 to 230
COD
<150
CHLORIDE
160 to 230
Organic matter
<150
IRON
0.2
BOD
AERATOR
Raw water form DG & SNH
RESERVOIR -A
RESERVOIR B
16000m3
16000m3
SUMP
RAW WATER
FROM SUMP
PE (1.5 4 PPM)
LIME (140-200 PPM)
CLARIFIER - 1
STEALING
CHAMBER
CHLORINE
(5-15 PPM)
ALUM
(60-100
PPM)
CAUSTIC (100-140PPM)
CLARIFIER - 2
Value
Parameter
Value
pH
9.8 to 10.2
CHLORIDE
180 to 250
COND
1300 to 1800
IRON
0.2
ALKALINITY
280 to 400
FRC
TOTAL
HARDNESS
160 to 250
PHOSPHATE
0.1
CALCIUM
80 to 150
SILICA
25 to 30
COD
100 to 120
TURBIDITY
<30 NTU
ORGANIC
MATTER
100 to 120
BOD
SULPHURIC
ACID
SAND GRAVITY
FILTER - 1
CLARIFIED
WATER
SAND GRAVITY
FILTER - 2
CT MAKEUP PP
RO-SOFT WT PP
HVAC PP
HRSG WASH PP
SAND GRAVITY
FILTER - 3
Value
Parameters
Value
pH
7 to7.8
IRON
0.2
COND
1300 to 1800
FRC
<1
ALKALINITY
180 to 260
PHOSPHATE
0.1
TOTAL
HARDNESS
150 to 240
SILICA
25 to 30
CALCIUM
70 to 150
TURBIDITY
<5 NTU
CHLORIDE
180 to 260
COD
100 to 120
BOD
PE
FeCl3
TBGF-1
Cl2
TBGF2
RO FEED PP TO
ACF
pH
6.8 to 7.2
Turbidity
<0.5
FRC
<0.5
RO FEED PP A& B
OF 150 m3/hr
ACF A
ACF - B
CARTAGE FILTER OF
5 MICRON - A
CARTAGE FILTER OF
5 MICRON - B
CARTAGE FILTER OF
5 MICRON- C
HCl
WATER FROM
CARTAGE
FILTER
SMBS
ANTI
SCALLENT
RO BOOSTER PP
STAGE I
A
RO BANK I
STAGE - I
RO BOOSTER PP
STAGE I
B
RO BOOSTER PP
STAGE I
C
RO BANK II
STAGE I
WATER
FROM
RO-STG -I
PERMEIT BREAK
TANK
RO BOOSTER PP
STAGE II
A
RO BOOSTER PP
STAGE II
B
RO STAGE II
BANK - I
RO STAGE II
BANK - II
DE-GASER
TOWER
A
RO BOOSTER PP
STAGE II
C
DE-GASER
TOWER
B
PERMEATE STORAGE
TANK A & B
OF 1300 m3 EACH
M - B FEED PP
A
M - B FEED PP
B
M - B FEED PP
C
DM STORAGE
TANK A OF
12500m3
DM STORAGE
TANK B OF
12500m3
in
IBD,CBD , COWS, CT Blow down stored in basin,
temperature and pH of the water monitored up to the
norm of DPCC before disposal of the water through
pump at the downstream of the SNH NALA.
DIPOSAL OF SLUDGE
THICKNER -1,2 CSDS -Sludge generated in Clarifier &
Cooling Tower transfer to Sludge Thickener where
useable water get separated and concentration of
sludge got increase
CENTRIFUGE-1,2 CSDS- Concentrated Sludge get
separated from water in sludge Centrifuge and
separated water transferred to stealing chamber for
further use and sludge is dispose off at designated place
for disposal.
CHLORINATION PLANT
CHLORINE DOSING IS DONE TO REMOVE ODOURNESS
AND STOP THE BACTERIAL & ALGAL GROWTH.
IN PPCL WE ARE HAVING TWO STREAMS OF 150 Kg/hr FOR
CW SYSTEM AND TWO STREAM OF 10 Kg/hr FOR LIME
SOFTENING PLANT AND RODM
CHLORINE ABSORPTION TOWER IS INSTALLED TO
ARREST / ABSORB CHLORINE LEAKAGE DETECTED BY
LEAK DETECTORS