Sei sulla pagina 1di 30

E nv i r o n m e n t a l D e ve l o p m e n t P l a n

Gram Panchayat : Gunjoti


Ta l u k a : O m e r g a
District: Osmanabad (MH)

Presenting

Gurgaon office
1st Floor SCO-16, Sector
10- A, Gurgaon (Haryana)

J . M. Environet Pvt. Ltd.

Mumbai office
2nd Floor, J-204,International Info
Tech Park, Vashi station building
,Vashi- Navi Mumbai

About J.M Environet

J.M. Environet Pvt. Ltd. was established in 1993 (registered office at Jaipur (Raj.) &
corporate office at Gurgaon (HR) working as consultant since last 20 years & presently
our clientele is spread over in 22 states of INDIA.

Providing consultancy in environmental assessment, water management solid waste


management, rural sanitation, slum survey, social impacts, socio-economic survey,
survey through GPS, DGPS, Land Use, Land Cover Mapping, Rural Development, Urban
Planning, Municipal Finance.

Sucessfuly completed more than 900 projects related to environmental consultancy


services.

JM is working on externally funded projects like ADB, World Bank, DFID (U.K.) , EKF
(Denmark).
JM has in-house full-fledged environmental approved laboratory (NABL & MOEF) with
latest equipments.

Geographic Location : Regional Scenario

INDIA

MAHARASHTRA

DIST: OSMANABAD

About Gunjoti Gram Panchayat :


Before independence, Gunjoti was a district centre known as
PAYAGAH in Hyderabad State under the rule of Nizam.
Gunjoti is 4 km away from Omerga towards southwest which is
situated on National Highway No. 9 (Pune-Hyderabad).
Gunjoti GP

Umarga , Nilanga , Gulbarga , Tuljapur are the nearby Cities to


Gungoti.

Total population of Gunjoti Gram Panchayat is 9352 with two


Revenue Village i.e. Gunjoti & Gunjoti Wadi.
Total Geographical area is 2823.24 Ha.
Total House hold of Gunjoti Gram Panchayat area is 1869

Geographical Coordinates
Latitude

1748'33"N

Longitude

7635'46"E

Gunjoti : Connectivity & Linkages


Road Connectivity (Km)
Hyderabad : 231
Pune
: 334
Nasik
: 440
Mumbai
: 480
Rail Connectivity (Km)
Solapur
: 65
Osmanabad : 82
Latur
: 89
Air Connectivity (Km)
Hyderabad
International
Airport
: 234

D e m o g ra p h i c a l I n fo r m at i o n
S .NO

NAME OF VILLAGE

POPULATION

Male

Female

1.

Gunjoti Village

8737

4449

4288

2.

Gunjoti Wadi

615

326

289

9352

4775

4577

Total

Population Distribution Under


Total Male & Female
Total Male

48.94 %

Total Female

51.06 %

Source : As Per Census Data 2011

Sex Ratio

Sex Ratio (0-6)

964

891

Population Distribution Under


Total Male & Female (0-6 Age)
Total Male (0-60)

Total Female (0-6)

47.01 %
52.99 %

Demographical Information
SC/ST Population
20

SC Population

18.45
14.63

15

11.25

Sex Ratio

ST Population

Sex (0-6)
959

951

947

16.8

16.1

Sex Ratio

921

919

12.17
890

887

10

866

2.2

0.9

0
Rural India

Maharashtra

Osmanabad

Gunjoti GP
Rural India

Rural Literacy
90
80
70
60
50
40
30
20
10
0

86.39
67.38

74.16
60.27

Maharashtra

Osmanabad

Major Findings- Gunjoti

77.5

73.8

65.5
55.5

Good Literacy level


Good overall sex Ratio

Rural India

Maharashtra

Male

Osmanabad

Female

Gunjoti GP

Low ST population
(0.9%) when compared
to SC population (16.8%)

Gunjoti GP

Population Projection:
Population Projection
Taluka

Gram
panchayat

Incremental Increase Method:

Year
2011

Year
2021

Year
2031

Year
2036

9352

10730

12148

13610

Geometric Progression Method:


Omerga

Arithmetic Increase
Method:

Gunjoti

Source : As Per Census Data 1991, 2001 & 2011 & Population Projection

Year

Population

Decadal
Growth

16000

12148

9352

19.77 %

12000

2021

10730

14.73 %

10000

2031

12148

13.21 %

2036

13610

12.03 %

Average Growth

14.93 %

Population

2011

Remark: Population of Gunjoti GP is


increasing but Growth Rate is Slightly
Decreasing in every 10 Years

13610

14000
10730
9352

8000
Population
Growth

6000
4000
2000
0
Yr:2011

Yr:2021

Yr:2031
Year

Yr:2036

Wo r k i n g M e t h o d o l o g y
Preliminary Site Visit by Team of Experts
Workshop with Stakeholders
Scope & Identification of Study Area
Aims & Objective
Baseline Data Collection
Situation Analysis & Identification of Issues
Draft EDP
Comments & Suggestions from Gram Sabha
Final EDP Submission

M e et i n g & D i s c u s s i o n s
Preliminary Meeting was conducted on 02.12.2013 with
Gram Panchayat Sarpanch, Dy. Sarpanch, Village
Development Officer to Initiate the EDP Project. This visit
was made by Mr. M.N. Waingankar, Mr. Israr Y. Pathan &
Mr. J.Patni as JMEPL Representatives.
Kickoff Workshop and Discussion was organized on
29.0.1.2014 in front of Mr. K.D. Bone, Dy. CEO, District
Osmanabad. Village Development Office of all 8 Gram
Panchayats. Were presented.
A site visit of Mr. Anuj Sharma, Mr. M.N. Waingankar, Mr.
Israr Y. Pathan, Ms. Harshada Mahajan and Monitoring
Staff was conducted in Gram Panchayat area for
discussion and identification of the Issues and Potential
of the Gram Panchayat.
Site Visit of Water Supply & Sanitation Expert along Mr.
M.N. Waingankar and Monitoring team was conducted to
identify the water supply gap and identify sustainable
Water Supply and Sanitation proposal.

Baseline Monitoring & Experts Visit


Baseline Environmental Monitoring was conducted
in Entire Gram Panchayat area to access the
Environmental Condition of the area including
following aspects:

Ambient Air Quality Monitoring


Ambient Noise Level Monitoring
Water Sampling
Soil Sampling

GPS Survey of Infrastructure Facilities


Road Slope & Drainage Survey
Village Boundary Survey
Biodiversity Study
Hydro geological Study
Water Supply & Sanitation survey
Agriculture & Cropping Study
Land use Land Cover Study

E nv i ro n m e n t a l Q u a l i t y
S. No.
1.

Environmental
Aspect
Ambient Air quality

Location
1.
2.
3.

2.

Ambient Noise Level

1.
2.
3.

Results

Remark

Gondehale Gali, Ward


No. 4
G.P. Building
Near Main Omerga
Road

PM-10: 72.25 107.45


g/m3
PM-2.5:34.60 50.25
g/m3
NO2: 14.65 22.95
g/m3
SO2: 7.28 12.25 g/m3
CO: less than 0.5 mg/m3

Well Within the


Standard.

Gondehale Gali, Ward


No. 4
G.P. Building
Near Main Omerga
Road

Day Time:53.82
58.24 dB (A)
Night Time:44.24
49.77 (A)

to
to

3.

Water

1.
2.
3.

Ward No.1 Gunjoti


Ward No.4 Gunjoti
Ward No.6 Gujoti

pH: 6.90to 6.99


Total hardness:336.96
to 565.76 mg/L
Alkalinity:304.92
to
308.09 mg/L

4.

Soil

1.

Nr. Omerga Gunjoti


Road
Nr. Omerga Gulberga,
Ward No.6

pH:7.77 to 8.03
Organic Matter:0.75 %
to 1.11%.
Phosphorous:15.67to
34.76 kg/ha
Potassium:451.43 to
828.36 kg/ha
Nitrogen:124.96
to
84.46 kg/ha.

2.

L a n d U s e L a n d C o v e r ( LU L C )
S. No.

Area in

LU/LC Class

hectare

% Area

1.

Water Bodies

84.01

2.98

2.

Roads

25.35

0.90

3.

Commercial / Institutional

1.07

0.04

4.

Open Land

68.91

2.44

5.

Open Scrub Land

154.42

5.47

6.

Plantation

17.12

0.61

7.

Agriculture Land

2457.31

87.04

8.

Residential Area

14.98

0.53

9.

Industrial Area

0.02

0.00

10.

Crematorium

0.06

0.00

2823.24

100.00

Total

LULC(%)

0% 0%
0%
1% 3% 1% 2%
5%

Water Bodies
1%

Roads
Commercial /
Institutional
Open Land
Open Scrub Land
Plantation

87%

Agriculture Land
Residential Area

Majority of land is dominated by 87.04 %


Vacant Open land for Infrastructure.
2.98% of total area is covered by Water Bodies.

M a j o r i s s u e s o f a l l G ra m p a n c hyat :
Settlement in Grampanchayat area;
Drainage System;
Solid Waste Management & Disposal Facilities;

Transportation in internal area of Gram Panchayat;


Storage and Supply of Water;
Road Condition;
Education & Technical Education Facilities;
Health Care Facilities;
Employment Opportunities;
Lack for Small Scale Business & Awareness

Water Supply & Sanitation


S. No.

Type

Number

1.

Govt well

14 nos

2.

Over head tanks in working condition

1nos

3.

Over head tanks in Non working condition

2 nos

4.

Handpump in Working Condition

7 nos

5.

Handpump in non Working Condition

4 nos

Source : Gram Panchayat & Primary Survey

Domestic

2011
2021
2031
2036

9352

Basis of Water
Demand for
Residential
Floating (per
Population (LPCD)
day)

10679
12034
13420

1870
2136
2407
2684

Gram Panchayat Has Awarded with Nirmal


Gram Purushkar for total sanitation;
2 Public Toilets are present in Ward no.1 & 3.
There is no Wastewater Treatment Facilities.
Improper Drainage Facility.

Present & Future Water Requirement & Waste Water Generation

Population
Years

70
70
70
70

Basis of Water
Domestic
Demand for Floating
Water Demand
Population
(LPCD) *
(LPCD)

654640
747530
842380
939400

45
45
45
45

Water Demand
of Floating
Population
(LPCD)

Total Water
Demand
(LPCD)

Sewage
Generation
(LPCD)

84150
96120
108315
120780

738790
843650
950695
1060180

591032
674920
760556
848144

Solid Waste Management


Solid Waste Dumping Site
Sr No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Ward/Wadi
4
5
5
Gunjoti Wadi
Gunjoti Wadi
4
5
5
3
3
Harijan Wasti
Harijan Wasti
Shishak Colony
1
1
1
1

Type
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump
Open Dump

Waste is being dumping in open


land.
Door to door Waste Collection
Facility is not available.
Waste is only collected manually by
hand Cart.
Proper Waste Dumping Site is not
available.
Proper Waste Management System is
not available.

PROJECTED WASTE GENERATION


Basis of Waste
Waste Generation
Floating
generation
(tonne/day)
Population
(gms/day)

Year

Population

Basis of Waste
generation
(gms/day)

Waste Generation
(tonne/day)

Total Waste
Generation
(tons/day)

2011

9352

200

1.87

1870

50

0.09

1.96

2021

10679

200

2.14

2136

50

0.11

2.24

2031

12034

200

2.41

2407

50

0.12

2.53

2036

13420

200

2.68

2684

50

0.13

2.82

Management Plan: Sectoral Goal


SN

1.

SECTOR

GOAL

Economy, Trade

To create a vibrant village with diversified economic base using local opportunities and

&Commerce

potentials with special consideration to the economically weaker sections of the society

2.

Water supply

To ensure access to drinking and safe water supply to all

3.

Sewerage

To achieve access to sewerage network for all

4.

Drainage

To achieve comprehensive and sustainable drainage system by regarding the existing natural
drainage

5.

Solid Waste

To achieve and promote environmentally sustainable waste management practice

Management
6.

Transportation

To achieve comfortable, sustainable, equitable and efficient transport facility system

7.

Power supply

To ensure access to renewable energy sources of power to all

8.

Education

To promote quality educational facilities in the village with special focus to the marginalized
section of the society

9.

Health

To provide quality health facilities with special focus towards primary health care facilities and

emergency services
10.

Environment

To use efficiently the potential of the village and to promote it as a environment friendly eco
village

13.

Disaster

To ensure Gunjoti as a sustainable and disaster-free village

Management
14.

Rural Governance

To promote the management to be efficient, equitable, accountable and transparent in nature

15

Other Social

Area Specific Management Plan based on the Requirement/ Recommendation

Facilities

Management Plan: Cost Estimation


S. No.
Details of Acivities
1 Economy Trade & Commerce
2 Water Supply
3 Sanitation
4 Solid Waste Management
5 Education
6 Medical & Health Facility
7 Transportation
8 Energy Management
9
10
11
12
13
14
15
Total

Pollution & Biodiversity


Management
Tourism Development
Other Social Facilities
Disaster Management Plan
Village Capacity Building
DPR for All Proposal
IEC for Related to all proposal

Total

Phase-I

Phase-II

Phase-III

Phase-IV Phase-V

4611

916

940

930

925

900

165.83

113.1

52.73

872.15

14.8

857.35

185.305

38.82

58.06

32.295

28.065

28.065

50

50

12

12

762.51
316.72

574.51
69.00

187.99
74.00

69.82

53.9

50.00

528.75

105.75

105.75

105.75

105.75

105.75

100.0

20.00

20.00

20.00

20.00

20.00

219.36

50

62

80.32

13.52

13.52

125

20

20

20

20

45

80

10

10

20

20

20

50

10

10

10

10

10

70

10

10

15

15

20

8148.63

1951.98

2469.88

1303.185

1211.235

1212.335

E nv i ro n m e n t a l Q u a l i t y : A m b i e n t A i r
AMBIENT AIR QUALITY MONITORING RESULTS : PM10

40.68

40
34.6

30

40

50.25

39.88

50

44.81

60

38.02

100

84.75

97.42
72.25

60

83.10

PM10 g/m3

80

AMBIENT AIR QUALITY MONITORING RESULTS :


PM
60
602.5
60

70

PM2.5 g/m3

100

107.45

100

100

82.67

120

20

20
10
0
Gondehale Gali, Gunjoti

G.P. Building, Gunjoti

Near Main Omerga Road,


Gunjoti

0
Gondehale Gali, Gunjoti

MONITORING STATIONS
PM10 Max.

PM10 Min.

NAAQS

PM2.5 Max.

G.P. Building, Gunjoti

Near Main Omerga Road,


Gunjoti

MONITORING STATIONS
PM2.5 Min.

NAAQS

AMBIENT AIR QUALITY MONITORING RESULTS : NO2

90
80

80

80

80

80

SO2 g/m3

60

50

NO2 g/m3

80

80

70

60

50

40
20

AMBIENT AIR QUALITY MONITORING RESULTS : SO2

80

70

30

90

40

19.03
14.65

22.64

22.95

16.03

16.25

10

30
20
10

0
Gondehale Gali, Gunjoti

G.P. Building, Gunjoti

Near Main Omerga Road,


Gunjoti

10.6

12.25
7.28

NO2 Min.

NAAQS

7.91

0
Gondehale Gali, Gunjoti

MONITORING STATIONS
NO2 Max.

11.77

8.35

SO2 Max.

G.P. Building, Gunjoti

Near Main Omerga Road,


Gunjoti

MONITORING STATIONS
SO2 Min.
NAAQS

E nv i ro n m e n t a l Q u a l i t y : A m b i e n t N o i s e
Ambient Noise Level
Day Time (6:00 a.m. to 10:00 p.m.)

59

58.24

58

56
55

54
53
52

55

55

54.37

55
53.82

51
Gondehale Gali, Gunjoti

G.P. Building, Gunjoti

Near Main Omerga Road,


Gunjoti

MONITORING
STATION
Day Time (6:00 a.m. to 10:00
p.m.)
CPCB
NOISE STANDARDS (Residential)

49.77

Ambient Noise Level


Night Time (10:00 p.m. to 6:00 a.m.)

46.18

51
50
49
48
47
46
45
44
43
42
41

44.24

Leq dB (A)

Leq dB (A)

57

Gondehale Gali, Gunjoti

G.P. Building, Gunjoti

Near Main Omerga Road,


Gunjoti

MONITORING STATIONS
Night Time (10:00 p.m. to 6:00 a.m.)
CPCB NOISE STANDARDS (Residential)

Detailed Cost: Economy Trade &


Commerce
Details of Activities

Total

Economy
Trade
and
Commerce=
Grain
processing
units-40.00
Lakhs (Approx), Pulses
Process Unit-30.00 Lakhs
(Approx),
Oil
Sheed
Processing
unit-25.00 4611
Lakhs (Approx), Bazarpeth
-16.00 kahs, Development
of Sericulture unit in 50
Acre open land @ 90.00
Lakhs per unit= 90x50=
4500 Lakhs

Phase-I

Phase-II

916

940

PhasePhase-III Phase-IV
V
Source

930

925

900 4611

Detailed Cost: Water Supply


Details of Activities

Total

Total cost of Water Supply


Scheme is-113.10 Lakhs (Pump
House- 1.75 Lakhs, Pumping
machinery-3.79 Lakhs, Rising
165.83
Main-92.74 Lakhs, Trenches
Gallery of 25 M-5.50 Lakhs,
New 6x12 M well-9.32 Lakhs),
DWWT Plant-52.73 Lakhs.

Phase-I

Phase-II

113.1

52.73

PhasePhase-III Phase-IV
V
Source

165.83

Detailed Cost: Sanitation


Details of Activities
Total Phase-I
Sanitation Facilities required
the underground drainage.
Total 46 Roads required the
Drainage work and the cost of
the same is-857.35 Lakhs, total
14.8
7 roads required the covering 872.15
of Open Drainage and the cost
of the same is-4.80 Lakhs. Total
Drainage work= 862.15 Lakhs,
5 Public toilets @ 2.00 Lakhs
each=2x5= 10.00 Lakhs

Phase-II

857.35

PhasePhase-III Phase-IV
V
Source

872.15

Detailed Cost: Solid Waste Management


Details of Activities

Total

Waste Collection Van-12.00 Lakhs,


2 small dust bins for each HH @
100 Rs/bins. Total House hold is
1869. So that total Cost of Dust bins
are- (2X100X1869)X2=7.47 Lakhs,
10 Waste Dumping bins ate major
points of GP area @ 5000 Rs/bins= (5000X10)X2=1.00 Lakhs, 10
Vermicomposting unit @ 1.00
Lakhs per unit= 10X1=10.00 Lakhs,
Waste dumping, Segragation unit &
185.305
Shed- 20.00 Lakhs, 2 workers for
each Vermicomposting unit @
150/Day
for
five
year=
(150X2X1825)X5= 27.375 Lakhs. 1
Driver for Ghanta Gadi @ 500 Rs/
day for 5 years- (500X1825)X545.625 Lakhs, 2 Workers with
Ghanta gadi @ 150 Rs/ Day for 5
Years-(150X2X1825)X5=
27.375,
Cost of Fuel & Maintainance for
Ghanta gadi- (8.00X5)=40.00 Lakhs,

Phase-I

Phase-II

38.82

58.06

PhasePhase-III Phase-IV
V
Source

32.295

28.065

28.065 185.305

Detailed Cost: Education


Details of Activities

Total

Phase-I

PhasePhase-III Phase-IV
V
Source

Phase-II

,Establishment

of Zilla
Parishad School with All 50
50
Educational facilities.
Detailed Cost: Medical & Health Facility
Details of Activities

Total

Phase-I

Details of Activities

Total

Phase-I

Phase-II

Total Main and Internal


Road length is 30.83 Km.
Total 53 Roads identified.
43 Roads required only
Road Construction Work 762.51 574.51
and the total cost of the
same is-758.51 Lakhs, Two
bus shed @ 2.00 Lakh= 4.00
Lakhs

187.99

50

PhasePhase-III Phase-IV
V
Source

Phase-II

Establishment of Primary
Sub Health Centre with all 12
12
basic medical facilities.
Detailed Cost:Transportation

12

PhasePhase-III Phase-IV
V
Source

762.51

Detailed Cost: Energy Management


Details of Activities

Total

Energy
ManagementTotal 300 Solar Panel are
required for road Side
lightning. 22 Lamps are
available so that 278 new
Solar Lamps will be
established @ 19000/- per
lamp cost- Total cost of
Road Side Solar Lamps52.82 Lakhs. Maintenance 316.72
cost or replacement of
Batery
@
5000=
5000x300=15.00
Lakhs.
(Only for first maintenance
after
5
years)
Establishment of Solar
Power Generation Unit of
400 KW Capacity= 250
Lakhs

Phase-I

Phase-II

69.00

74.00

PhasePhase-III Phase-IV
V
Source

69.82

53.9

50.00 316.72

Detailed Cost: Pollution & Biodiversity


Details of Activities
Total Phase-I
Total 12000 plants will be
planted on both side of the
road.
1-Cost of Tree Samples=
12000X50=
6.00
Lakhs
2-Digging
Charges=12000X150=18.00
Lakhs
3-Tree
Guard
Cost=
2000X50=6.00 Lakhs
4-Mannuar Cost= 12000X50=
6.00
Lakhs. 528.75 105.75
Total cost of Plantation-36.00
Lakhs
To survive 12000 Plants, 60
families will (180 Member)
will work 1825 Days (5 Years)
@ 150 Rs per head/ per day (as
per minimum wage Act), so
that total cost of Maintenance
will be 180X1825X150=492.75
Lakhs

Phase-II

105.75

PhasePhase-III Phase-IV
V
Source

105.75

105.75 105.75 528.75

D e t a i l e d C o s t : To u r i s m M a n a g e m e n t
Details of Activities
Total
Development of Historical Places in
Gunjoti GP area i.e Strengthen of
Hutam Smarak, Garden and Sitting
Facility, Strengthen of Ram Mandir,
Entry
gate,
Plantation
and
electrification, Strengthen of Shinai
Mandir, Community hall, Concreting
of Compound anf development of
compound wall, Graden and
drinking
water
facility,
Electrification, Garden, Compound
wall and Kabristan area, Plantation,
Sitting
arrangement
and
electrification at Hazi Munnawar
Dargah, Strengthen of compound 528.75
wall, renovation of math, cleaning
and boundary wall of well,
compound wall and compound
development, sitting arrangement
Tulsi Mata Math, Strengthen and
Electrification and Graden at
Ghanta Math, Overall strengthen
and construction of Entry gate of
the Guru Satling Maharaj Samadhi
Sthal,
Garden,
Entry
gate,
Compound and compound wall
with
sitting
arrangement,
electrification facility in Maruti
Mandir- 100.00 Lakhs (Approx)

Phase-I

Phase-II

Phase-III

105.75

105.75

105.75

Phase-IV Phase-V Source

105.75

105.75 528.75

Detailed Cost: Other Social Facility


Details of Activities
Total
Development of Play Ground- 80.32
Lakhs, Establishment of Study
Centre- 12.00 Lakhs, Construction
of Community Hall-50.00 Lakhs,
Construction of Cremation Ground- 219.36
13.52 Lakhs, Construction of Grave
Yard-13.52 Lakhs, Construction of
Gym with all required Facility50.00 Lakhs

Phase-I

Phase-II

Phase-III

50

62

80.32

Phase-IV Phase-V Source

13.52

13.52

219.36

Detailed Cost: Disaster Management Plan


Details of Activities

Total

Phase-I

Phase-II

PhasePhase-III Phase-IV
V
Source

12
12
Detailed Cost: Village Capacity Building

Disaster Management Plan

Details of Activities

Total

Phase-I

Phase-II

Training of GP Members, Sarpanch


and Village Development Office
regarding
Transparant
Administration, New policies of
Government and other Technical
training
programs.
Technical
trainining programs/Camps to the
youth and Health and Women
Health & Child Development
training and awarness etc.

12

12

12

PhasePhase-III Phase-IV
V
Source

12

Detailed Cost: DPR for all Proposal


Details of Activities

Total

Phase-I

Phase-II

PhasePhase-III Phase-IV
V
Source

12
12
Detailed Cost: IEC for all Proposal

Detailed Project Report

Details of Activities
IEC Plan

Total

Phase-I

Phase-II

12

12

12

PhasePhase-III Phase-IV
V
Source

12

Potrebbero piacerti anche